Letter Sequence Withholding Request Acceptance |
---|
EPID:L-2021-LLT-0000, Units 1 and 2, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Modeling Error Correction (Approved, Closed) |
|
MONTHYEARML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D Project stage: Acceptance Review ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) Project stage: Draft RAI ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- Project stage: Withholding Request Acceptance ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional Project stage: Withholding Request Acceptance ML22052A0642022-02-17017 February 2022 Units 1 and 2, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Modeling Error Correction Project stage: Request ML22101A1522022-04-14014 April 2022 Regulatory Audit Report Regarding Request to Review Appendix E to Fleet Topical Report DOM-NAF-2 Project stage: Other ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) Project stage: Approval 2021-06-08
[Table View] |
Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom-ML21075A259 |
Person / Time |
---|
Site: |
Millstone, Surry, North Anna ![Dominion icon.png](/w/images/b/b0/Dominion_icon.png) |
---|
Issue date: |
03/18/2021 |
---|
From: |
Ed Miller Plant Licensing Branch 1 |
---|
To: |
Mark D. Sartain Virginia Electric & Power Co (VEPCO) |
---|
Miller E, NRR/DORL |
References |
---|
EPID: L-2021-LLT-0000 |
Download: ML21075A259 (4) |
|
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter 2024-02-06
[Table view] Category:Proprietary Information Review
MONTHYEARML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits ML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML22298A0692022-11-16016 November 2022 Request for Withholding Information from Public Disclosure for Surry Power Station Units 1 and 2 ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML21060B5992021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML20178A3212020-07-16016 July 2020 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 1, Proposed Inservice Inspection Interval Alternative N1 I5 NDE-002 ML19043A7452019-02-14014 February 2019 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 2, Related to Inservice Inspection Alternative Request N2-I4-NDE-007 ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an ML18173A1582018-06-29029 June 2018 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 (Holtec) ML18166A3542018-06-27027 June 2018 Request for Withholding Information from Public Disclosure (EPID L-2017-LR0-0078) ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 ML17277A2962017-11-0202 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17264A2272017-10-20020 October 2017 Request for Withholding Information from Public Disclosure ML17030A0812017-02-24024 February 2017 Request for Withholding Information from Public Disclosure ML17031A1302017-02-23023 February 2017 Request for Withholding Information from Public Disclosure ML16320A2622016-12-0101 December 2016 Request for Withholding Information from Public Disclosure ML16320A2672016-12-0101 December 2016 Request for Withholding Information from Public Disclosure - June 15, 2016 Letter ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure ML16129A0012016-06-0707 June 2016 Request for Withholding Information from Public Disclosure ML16040A2152016-02-24024 February 2016 Request for Withholding Information from Public Disclosure ML13080A3762013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3702013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3062013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13071A1022013-03-13013 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure ML12258A1502012-09-19019 September 2012 Request for Withholding Information from Public Disclosure for Millstone Powers Station, Unit No. 3 ML12172A0532012-06-26026 June 2012 Request for Withholding Information from Public Disclosure ML1208304582012-04-10010 April 2012 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML1129303472011-10-25025 October 2011 Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007) ML1116719932011-06-29029 June 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) ML1103906642011-02-28028 February 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML1021607492010-09-22022 September 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1015405582010-06-11011 June 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0921608802009-08-21021 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 ML0921200942009-08-0404 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 2 ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) ML0913104282009-06-0505 June 2009 Request for Withholding Information from Public Disclosure ML0900705162009-02-0303 February 2009 Request for Withholding Information from Pubic Disclosure Regarding Millstone Power Station, Unit No. 3 ML0823106632008-08-22022 August 2008 Letter Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0803501322008-03-13013 March 2008 Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0732500812007-12-14014 December 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2252), Subject: WCAP-16271-P, Millstone Unit 3 Spent Fuel Pool Criticality Safety Analysis, March 2007 (Proprietary), Date 2023-08-18
[Table view] |
Text
March 18, 2021 Mr. Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR NORTH ANNA POWER STATION, UNITS 1 AND 2, SURRY POWER STATION, UNITS 1 AND 2, AND MILLSTONE POWER STATION, UNITS 2 AND 3, REQUEST FOR WITHHOLDING, APPENDIX E OF FLEET REPORT DOM-NAF-2 (EPID: L-2021-LLT-0000)
Dear Mr. Sartain:
By letter dated February 11, 2021 (Agencywide Documents Access Management System (ADAMS) Accession No. ML21042B321), you submitted an affidavit dated December 2, 2020, executed by Gayle Elliott, Deputy Director, Licensing & Regulatory Affairs for Framatome Inc.,
requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
DOM-NAF-2, Appendix E, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code A nonproprietary version of this document can be found as Attachment 2 to your letter referenced above.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document be withheld from public disclosure. The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial information."
- 6. The following criteria are customarily applied by Framatome Inc.
to determine whether information should be classified as proprietary:
(a) The information reveals details of Framatome lnc.'s research and development plans and programs or their results.
M. Sartain (b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for Framatome Inc.
(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for Framatome Inc. in product optimization or marketability.
(e) The information is vital to a competitive advantage heId by Framatome Inc., would be helpful to competitors to Framatome Inc., and would likely cause substantial harm to the competitive position of Framatome Inc.
The information in this Document is considered proprietary for the reasons set forth in paragraphs 6(b), 6(d) and 6(e) above.
- 7. In accordance with Framatome lnc.'s policies governing the protection and control of information, proprietary information contained in this Document has been made available, on a limited basis, to others outside Framatome Inc. only as required and under suitable agreement providing for nondisclosure and limited use of the information.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
M. Sartain If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-2481, or via email at ed.miller@nrc.gov.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, 50-339, 50-336, and 50.423 cc: Listserv
ML21075A259 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DSS/SFNB/BC DORL/LPL2-1/BC NAME GEMiller KGoldstein RLukes MMarkley DATE 3/17/2021 03/17/2021 3/16/2021 3/18/2021