ML112930347

From kanterella
Jump to navigation Jump to search

Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007)
ML112930347
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/25/2011
From: Sanders C
Plant Licensing Branch 1
To: Heacock D
Dominion Nuclear Connecticut
Sandeers, Carleen, NRR/DORL, 415-1603
References
TAC ME5998, TAC ME5999, TAC ME6000, TAC ME6001, TAC ME6002, TAC ME6003, TAC ME6004, TAC ME6005, TAC ME6006, TAC ME6007
Download: ML112930347 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2011 Mr. David A Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUB~IECT: REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR MILLSTONE POWER STATION, UNIT NO.2 (TAC NOS. ME5998 ME6007)

Dear Mr. Heacock:

By letter dated January 30, 2011,1 Dominion Nuclear Connecticut, Inc. (DNC or the licensee) submitted relief requests RR-89-69, RR-89-70, RR-89-71, RR-89-72, RR-89-73, RR-89-74, RR 89-75, RR-89-76, RR-89-77. and RR-89-78 for Millstone Power Station, Unit No.2 (MPS2).

DNC requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI for the third 10-year inservice inspection interval, in which the licensee adopted the 1989 Edition with no Addenda. By letter dated August 26.2011,2 the U.S. Nuclear Regulatory Commission {NRC} staff requested additional information in order to complete its review.

DNC provided a response to the NRC by letter dated September 22, 2011. 3 As part of the response, DNC submitted an affidavit, dated September 19,2011, executed by Gayle F. Elliott, Manager. Plant Licensing, AREVA NP Inc. (AREVA NP). requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390:

Drawings 80225520, Revision 003, Sheets 1 through 17. entitled "Millstone Unit 2, 10 Year Reactor Vessel ISI- 2008" The information contained in the above drawings is marked proprietary in its entirety, and therefore, no non-proprietary version was provided.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(b) Use of information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML110960361 2 ADAMS Accession No. ML112170358 3 ADAMS Accession No. ML11279A036

D. Heacock -2 (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we 'may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1603.

Carleen Sanders, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc:

Gayle F. Elliott Manager, Product licensing AREVA NP Inc.

3315 Old Forrest Road Lynchburg, VA 24501 Additional Distribution via Listserv

ML112930347 OFFICE DORULPL 1 DORULPL 1-2/BC NAME CSanders ABaxter HChemoff DATE 10/24/11 10/24111 10/25/11