(5 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 09/04/2014 | | | issue date = 09/04/2014 |
| | title = IR 05000397/2014404, on 07/24/14, Columbia Generating Station, NRC Security Inspection Report | | | title = IR 05000397/2014404, on 07/24/14, Columbia Generating Station, NRC Security Inspection Report |
| | author name = Haire M S | | | author name = Haire M |
| | author affiliation = NRC/RGN-IV/DRS/PSB-1 | | | author affiliation = NRC/RGN-IV/DRS/PSB-1 |
| | addressee name = Reddemann M E | | | addressee name = Reddemann M |
| | addressee affiliation = Energy Northwest | | | addressee affiliation = Energy Northwest |
| | docket = 05000397 | | | docket = 05000397 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:" " September 4, 2014 | | {{#Wiki_filter:UNITED STATES mber 4, 2014 |
|
| |
|
| Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
| | ==SUBJECT:== |
| | | COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 |
| Richland, WA 99352-0968
| |
| | |
| SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 | |
|
| |
|
| ==Dear Mr. Reddemann:== | | ==Dear Mr. Reddemann:== |
| On July 24, 2014, the U.S. Nuclear Regulator y Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. | | On July 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. |
|
| |
|
| The NRC inspectors did not identify any findings or violations of more than minor significance. | | The NRC inspectors did not identify any findings or violations of more than minor significance. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
| |
| | |
| your response.
| |
| | |
| Sincerely,/RA/
| |
| Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
| |
| | |
| Docket No.: 50-397 License No.: NPF-21 Nonpublic
| |
| | |
| ===Enclosure:===
| |
| NRC Inspection Report 05000397/2014404
| |
| | |
| ===w/Attachment:===
| |
| Supplemental Information
| |
| | |
| cc w/o enclosure: Electronic Distribution for Columbia Generating Station
| |
|
| |
|
| ML14248A632 Entire Report: SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
| | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
| SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/ DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014
| |
|
| |
|
| SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure: | | Sincerely, |
| | /RA/ |
| | Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-397 License No.: NPF-21 Nonpublic Enclosure: |
| | NRC Inspection Report 05000397/2014404 w/Attachment: Supplemental Information cc w/o enclosure: |
| | Electronic Distribution for Columbia Generating Station ML14248A632 Entire Report: Non-Sensitive Publicly Available Keyword: |
| | SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: JRL NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword: |
| | SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: JRL NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/ |
| | DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014 SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure: |
| Security Specialist/NSIR (Eric.Wharton@nrc.gov) | | Security Specialist/NSIR (Eric.Wharton@nrc.gov) |
| Security Specialist/NSIR (Niry.Simonian@nrc.gov) | | Security Specialist/NSIR (Niry.Simonian@nrc.gov) |
| Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | | Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) |
| Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) | | Security Specialist/NSIR (Douglas.Garner@nrc.gov) |
| | Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) |
| Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) | | Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) |
| Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov | | Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) |
| ) Senior Resident Inspector (Jeremy.Groom@nrc.gov)
| | Senior Resident Inspector (Jeremy.Groom@nrc.gov) |
| Administrative Assistant (Douglas.Bodine@nrc.gov) | | Administrative Assistant (Douglas.Bodine@nrc.gov) |
| Electronic distribution by RIV w/o enclosure | | Electronic distribution by RIV w/o enclosure: |
| : Regional Administrator (Marc.Dapas@nrc.gov)
| | Regional Administrator (Marc.Dapas@nrc.gov) |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | | Acting DRP Director (Troy.Pruett@nrc.gov) |
| | Acting DRP Deputy Director (Michael.Hay@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| DRS Deputy Director (Jeff.Clark@nrc.gov) | | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| Senior Resident Inspector (Jeremy.Groom@nrc.gov) | | Senior Resident Inspector (Jeremy.Groom@nrc.gov) |
| | |
| Resident Inspector (Dan.Bradley@nrc.gov) | | Resident Inspector (Dan.Bradley@nrc.gov) |
| Administrative Assistant (Douglas.Bodine@nrc.gov) Acting Branch Chief, DRP/D (James.Drake@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) | | Administrative Assistant (Douglas.Bodine@nrc.gov) |
| | Acting Branch Chief, DRP/D (James.Drake@nrc.gov) |
| | Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) |
| Project Engineer, DRP/D (Brian.Parks@nrc.gov) | | Project Engineer, DRP/D (Brian.Parks@nrc.gov) |
| Public Affairs Officer (Victor.Dricks@nrc.gov) | | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| Public Affairs Officer (Lara.Uselding@nrc.gov) | | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| Project Manager (Andrea.George@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | | Project Manager (Andrea.George@nrc.gov) |
| RITS Coordinator (Marisa.Herrera@nrc.gov) | | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) |
| | | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| ACES (R4Enforcement.Resource@nrc.gov) | | ACES (R4Enforcement.Resource@nrc.gov) |
| Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) | | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | | RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) |
| ROPreports | | ROPreports |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 IR 05000397/20244032024-10-0101 October 2024 Cybersecurity Inspection Report 05000397/2024403 Public IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 IR 05000397/20220062023-03-0101 March 2023 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) IR 05000397/20234022023-02-23023 February 2023 NRC Security Baseline Inspection Report 050003972023402 (Full Report) IR 05000397/20220042023-01-23023 January 2023 Integrated Inspection Report 05000397/2022004- 4th Quarter IR 05000397/20224062023-01-18018 January 2023 NRC Security Baseline Inspection Report 05000397/2022406 (Cover Letter) IR 05000397/20224042023-01-17017 January 2023 Amended - Columbia Generating Station - Security Baseline Inspection Report 05000397/2022404 (Public) IR 05000397/20224012022-11-12012 November 2022 Cyber Security Inspection Report 05000397/2022401 (Cover Letter Only) IR 05000397/20220032022-10-31031 October 2022 Integrated Inspection Report 05000397/2022003 IR 05000397/20224052022-09-15015 September 2022 Material Control and Accounting Program Inspection Report 05000397 2022405 Cover Ltr Only IR 05000397/20224032022-09-0101 September 2022 NRC Security Inspection Report 05000397/2022403 (Full Report) IR 05000397/20220022022-07-28028 July 2022 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000397/2022002 and 07200035/2022001 IR 05000397/20220102022-06-30030 June 2022 Design Basis Assurance Inspection (Team) Inspection Report 05000397/2022010 IR 05000397/20224022022-06-23023 June 2022 Security Baseline Inspection Report 05000397/2022402 IR 05000397/20220012022-04-29029 April 2022 Integrated Inspection Report 05000397/2022001 IR 05000397/20210062022-03-0202 March 2022 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2021006) IR 05000397/20210042022-01-20020 January 2022 Integrated Inspection Report 05000397/2021004 IR 05000397/20214012022-01-19019 January 2022 Security Baseline Inspection Report 05000397/2021401 IR 05000397/20210902022-01-13013 January 2022 NRC Inspection Report 05000397/2021090 and Preliminary White Finding IR 05000397/20214202021-11-0404 November 2021 Security Baseline Inspection Report-Cover Letter - 05000397/2021420 IR 05000397/20210122021-11-0303 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000397/2021012 IR 05000397/20210032021-11-0202 November 2021 Integrated Inspection Report 05000397/2021003 IR 05000397/20210112021-09-21021 September 2021 Triennial Fire Protection Inspection Report 05000397/2021011 IR 05000397/20214022021-09-0909 September 2021 Security Baseline Inspection Report 05000397/2021402 IR 05000397/20210102021-08-29029 August 2021 Biennial Problem Identification and Resolution Inspection Report 05000397/2021010 IR 05000397/20210022021-08-0202 August 2021 Integrated Inspection Report 05000397/2021002 2024-08-09
[Table view] Category:Letter
MONTHYEARML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 IR 05000397/20244032024-10-0101 October 2024 Cybersecurity Inspection Report 05000397/2024403 Public GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation 2024-09-24
[Table view] |
Text
UNITED STATES mber 4, 2014
SUBJECT:
COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404
Dear Mr. Reddemann:
On July 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-397 License No.: NPF-21 Nonpublic Enclosure:
NRC Inspection Report 05000397/2014404 w/Attachment: Supplemental Information cc w/o enclosure:
Electronic Distribution for Columbia Generating Station ML14248A632 Entire Report: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: JRL NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: JRL NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/
DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014 SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Resident Inspector (Dan.Bradley@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov)
Acting Branch Chief, DRP/D (James.Drake@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Andrea.George@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPreports