| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005)
| title = Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005)
| author name = Warnick G G
| author name = Warnick G
| author affiliation = NRC/RGN-IV/DRP/RPB-C
| author affiliation = NRC/RGN-IV/DRP/RPB-C
| addressee name = Fallacara V
| addressee name = Fallacara V
Line 9: Line 9:
| docket = 05000416
| docket = 05000416
| license number = NPF-029
| license number = NPF-029
| contact person = Warnick G G
| contact person = Warnick G
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| document type = Inspection Plan, Inspection Report, Letter
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000416/2016005]]
See also: [[see also::IR 05000416/2016005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511August 31, 2016 Mr. Vin Fallacara Acting Site Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016005) Dear Mr. Fallacara: On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined  
{{#Wiki_filter:UNITED STATES
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
                              NUCLEAR REGULATORY COMMISSION
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact  
                                                REGION IV
you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.   In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
                                            1600 E LAMAR BLVD
V. Fallacara - 2 -  Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by
                                        ARLINGTON, TX 76011-4511
performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."  As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional enforcement violations associated with impeding the regulatory process.  Therefore, the NRC plans to conduct Inspection Procedure 92723, "Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to assess your evaluation of these violations and review the adequacy of associated corrective actions.   
                                            August 31, 2016
In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017.  This will be the final mid-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of
Mr. Vin Fallacara
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."  In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Please contact me at 817-200-1144 with any questions you have regarding this letter. 
Acting Site Vice President Operations
Sincerely, 
Entergy Operations, Inc.
/RA/  Greg Warnick, Branch Chief Project Branch C Division of Reactor Projects  Docket No. 50-416 License No. NPF-29  Enclosure: Grand Gulf Nuclear Station    Inspection/Activity Plan 
Grand Gulf Nuclear Station
Page 1 of 208/30/201609:35:11Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteGrand GulfInspection / Activity Plan07/01/2016-06/30/2018IP 92723-IP 92723 FOLLOW UP FOR SL IV TE11 IPFollow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S9272309/26/201609/30/2016EB1-07T-GG HEAT SINK PERFORMANCE INSPECTION11 IPHeat Sink Performance7111107T09/19/201609/23/2016EB1-17T-GG PERM PLANT MODS & 50.59 INSPECTION51 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/17/201611/04/2016RS 24-RADIATION SAFETY21 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/2016EP-1-EP PERFORMANCE INDICATORS11 IPDrill/Exercise Performance71151-EP0112/12/201612/12/20161 IPERO Readiness71151-EP0212/12/201612/12/20161 IPAlert & Notification System Reliability71151-EP0312/12/201612/12/2016EP3-EP PROGRAM INSPECTION (POSTPONE 2016)11 IPAlert and Notification System Testing711140201/09/201701/13/20171 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/09/201701/13/20171 IPEmergency Action Level and Emergency Plan Changes711140401/09/201701/13/20171 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/09/201701/13/2017RS 13 PI-RADIATION SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0102/13/201702/17/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/13/201702/17/20171 IPOccupational Exposure Control Effectiveness71151-OR0102/13/201702/17/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0102/13/201702/17/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection [Triennial]7111105T04/03/201704/07/20171 IPFire Protection [Triennial]7111105T04/17/201704/28/2017EP-2-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140103/27/201703/31/20171 IPEmergency Action Level and Emergency Plan Changes711140403/27/201703/31/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11 IPDrill/Exercise Performance71151-EP0103/27/201703/31/20171 IPERO Readiness71151-EP0203/27/201703/31/20171 IPAlert & Notification System Reliability71151-EP0303/27/201703/31/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
P.O. Box 756
Page 2 of 208/30/201609:35:11Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteGrand GulfInspection / Activity Plan07/01/2016-06/30/2018EXAM-INITIAL EXAM31 INITIAL EXAM GG( 4/17)X0261304/10/201704/14/20171 INITIAL EXAM GG( 4/17)X0261305/08/201705/12/2017EXAM-INITIAL LICENSED OPERATOR EXAM41 INITIAL EXAM GRAND GULF (12/2017)X0259810/30/201711/03/20171 INITIAL EXAM GRAND GULF (12/2017)X0259812/04/201712/08/2017ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/201707/30/2017RS 5678-RS TEAM51 IPRadiation Monitoring Instrumentation71124.0507/10/201707/14/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/20171 IPRadiological Environmental Monitoring Program71124.0707/10/201707/14/20171 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/10/201707/14/2017BRQ-BRQ INSPECTION31 IPLicensed Operator Requalification Program7111111B08/07/201708/11/2017EB1-21M-GG DESIGN BASIS INSPECTION31 IPComponent Design Bases Inspection (Teams)7111121M09/11/201710/13/2017TSB 52B-BIENNIAL PI&R41 IPProblem Identification and Resolution71152B10/30/201711/03/20171 IPProblem Identification and Resolution71152B11/13/201711/17/201771111.08-INSERVICE INSPECTION R2011 IPInservice Inspection Activities - BWR7111108G03/05/201803/09/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Port Gibson, MS 39150
V. Fallacara - 2 - Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff  will confirm through inspections the full implementation of the orders mentioned above by  performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness  Communication/Staffing/Multi-Unit Dose Assessment Plans."  As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from  January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional  enforcement violations associated with impeding the regulatory process.  Therefore, the NRC  plans to conduct Inspection Procedure 92723, "Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to assess  your evaluation of these violations and review the adequacy of associated corrective actions.  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the  Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the  NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017.  This will be the final mid-cycle assessment letter.  The staff will continue  to conduct quarterly assessment meetings and communicate changes in the assessment of  licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, 
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
"Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's  "Rules of Practice," a copy of this letter will be available electronically for public inspection in the  NRC Public Document Room or from the Publicly Available Records (PARS) component of  NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible  from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1144 with any questions you have regarding this letter. Sincerely, /RA/ Greg Warnick, Branch Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure: Grand Gulf Nuclear Station    Inspection/Activity Plan DISTRIBUTION: See next page  ADAMS ACCESSION NUMBER:  ML16242A335 SUNSI ReviewBy:  CHY ADAMS Yes    NoPublicly Available Non-Publicly Available  Non-Sensitive SensitiveKeyword: NRC-002 OFFICE DRP:C/SPE DRS:  D DRP: D DRP:PBC NAME CYoung AVegel TPruett GWarnick SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/ DATE 8/15/16 8/17/16 8/18/16 8/29/16 OFFICIAL RECORD COPY 
                (REPORT 05000416/2016005)
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016005)  DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Matt.Young@nrc.gov) Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Yvonne.Dubay@nrc.gov) Branch Chief, DRP/C (Greg.Warnick@nrc.gov)  Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) Project Engineer (Michael.Stafford@nrc.gov) Project Engineer (Lindsay.Brandt@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (James.Kim@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov 
Dear Mr. Fallacara:
On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions
from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of
your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that
preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., green) safety significance, and all PIs
indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the


V. Fallacara                                      -2-
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from
January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional
enforcement violations associated with impeding the regulatory process. Therefore, the NRC
plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity
Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess
your evaluation of these violations and review the adequacy of associated corrective actions.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1144 with any questions you have regarding this letter.
                                                    Sincerely,
                                                    /RA/
                                                    Greg Warnick, Branch Chief
                                                    Project Branch C
                                                    Division of Reactor Projects
Docket No.      50-416
License No.    NPF-29
Enclosure:
Grand Gulf Nuclear Station
  Inspection/Activity Plan
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                              GG
Page 1 of 2                                                                                    Grand Gulf
08/30/2016    09:35:11                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                          No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                        on Site
                                        IP 92723      - IP 92723 FOLLOW UP FOR SL IV TE                                                                                        1
1          09/26/2016      09/30/2016    IP 92723                Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S
                                        EB1-07T        - GG HEAT SINK PERFORMANCE INSPECTION                                                                                    1
1          09/19/2016      09/23/2016    IP 7111107T              Heat Sink Performance
                                        EB1-17T        - GG PERM PLANT MODS & 50.59 INSPECTION                                                                                  5
1          10/17/2016      11/04/2016    IP 7111117T              Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
                                        RS 24          - RADIATION SAFETY                                                                                                      2
1          11/07/2016      11/11/2016    IP 71124.02              Occupational ALARA Planning and Controls
1          11/07/2016      11/11/2016    IP 71124.04              Occupational Dose Assessment
                                        EP-1          - EP PERFORMANCE INDICATORS                                                                                              1
1          12/12/2016      12/12/2016    IP 71151-EP01            Drill/Exercise Performance
1          12/12/2016      12/12/2016    IP 71151-EP02            ERO Readiness
1          12/12/2016      12/12/2016    IP 71151-EP03            Alert & Notification System Reliability
                                        EP3            - EP PROGRAM INSPECTION (POSTPONE 2016)                                                                                  1
1          01/09/2017      01/13/2017    IP 7111402              Alert and Notification System Testing
1          01/09/2017      01/13/2017    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          01/09/2017      01/13/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          01/09/2017      01/13/2017    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        RS 13 PI      - RADIATION SAFETY                                                                                                      2
1          02/13/2017      02/17/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          02/13/2017      02/17/2017    IP 71124.03              In-Plant Airborne Radioactivity Control and Mitigation
1          02/13/2017      02/17/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          02/13/2017      02/17/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        EB2-05T        - TRIENNIAL FIRE PROTECTION INSPECTION                                                                                  4
1          04/03/2017      04/07/2017    IP 7111105T              Fire Protection [Triennial]
1          04/17/2017      04/28/2017    IP 7111105T              Fire Protection [Triennial]
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                                        4
1          03/27/2017      03/31/2017    IP 7111401              Exercise Evaluation
1          03/27/2017      03/31/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3          - EP PERFORMANCE INDICATOR VERIFICATION                                                                                  1
1          03/27/2017      03/31/2017    IP 71151-EP01            Drill/Exercise Performance
1          03/27/2017      03/31/2017    IP 71151-EP02            ERO Readiness
1          03/27/2017      03/31/2017    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                          GG
Page 2 of 2                                                                                    Grand Gulf
08/30/2016    09:35:11                                                              Inspection / Activity Plan
Report 22
                                                                                      07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                        No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                    on Site
                                        EXAM          - INITIAL EXAM                                                                                                        3
1          04/10/2017      04/14/2017        X02613                INITIAL EXAM GG( 4/17)
1          05/08/2017      05/12/2017        X02613                INITIAL EXAM GG( 4/17)
                                        EXAM          - INITIAL LICENSED OPERATOR EXAM                                                                                      4
1          10/30/2017      11/03/2017        X02598                INITIAL EXAM GRAND GULF (12/2017)
1          12/04/2017      12/08/2017        X02598                INITIAL EXAM GRAND GULF (12/2017)
                                        ISFSI          - LOADING INSPECTION (ONE WEEK IN MONTH)                                                                              1
1          07/01/2017      07/30/2017    IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                        RS 5678        - RS TEAM                                                                                                            5
1          07/10/2017      07/14/2017    IP 71124.05              Radiation Monitoring Instrumentation
1          07/10/2017      07/14/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
1          07/10/2017      07/14/2017    IP 71124.07              Radiological Environmental Monitoring Program
1          07/10/2017      07/14/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                        BRQ            - BRQ INSPECTION                                                                                                      3
1          08/07/2017      08/11/2017    IP 7111111B              Licensed Operator Requalification Program
                                        EB1-21M        - GG DESIGN BASIS INSPECTION                                                                                          3
1          09/11/2017      10/13/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                        TSB 52B        - BIENNIAL PI&R                                                                                                      4
1          10/30/2017      11/03/2017    IP 71152B                Problem Identification and Resolution
1          11/13/2017      11/17/2017    IP 71152B                Problem Identification and Resolution
                                        71111.08      - INSERVICE INSPECTION R20                                                                                            1
1          03/05/2018      03/09/2018    IP 7111108G              Inservice Inspection Activities - BWR
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                                      Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
ML16242A335
  SUNSI Review                  ADAMS                  Publicly Available            Non-Sensitive Keyword:
  By: CHY                          Yes  No              Non-Publicly Available        Sensitive    NRC-002
  OFFICE          DRP:C/SPE DRS: D                  DRP: D          DRP:PBC
  NAME            CYoung        AVegel              TPruett          GWarnick
  SIGNATURE /RA/                  /RA/JClark,for /RA/                  /RA/
  DATE            8/15/16        8/17/16            8/18/16          8/29/16
                                               
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016
SUBJECT:        MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
                (REPORT 05000416/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov)
Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (James.Kim@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 15:42, 30 October 2019

Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005)
ML16242A335
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/31/2016
From: Greg Warnick
NRC/RGN-IV/DRP/RPB-C
To: Fallacara V
Entergy Operations
Warnick G
References
IR 2016005
Download: ML16242A335 (6)


See also: IR 05000416/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Vin Fallacara

Acting Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION

(REPORT 05000416/2016005)

Dear Mr. Fallacara:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent

quarterly performance indicators (PIs) in addition to inspection results and enforcement actions

from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of

your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Grand Gulf Nuclear Station during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

V. Fallacara -2-

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from

January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional

enforcement violations associated with impeding the regulatory process. Therefore, the NRC

plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity

Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess

your evaluation of these violations and review the adequacy of associated corrective actions.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Greg Warnick, Branch Chief

Project Branch C

Division of Reactor Projects

Docket No. 50-416

License No. NPF-29

Enclosure:

Grand Gulf Nuclear Station

Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG

Page 1 of 2 Grand Gulf

08/30/2016 09:35:11 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

IP 92723 - IP 92723 FOLLOW UP FOR SL IV TE 1

1 09/26/2016 09/30/2016 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S

EB1-07T - GG HEAT SINK PERFORMANCE INSPECTION 1

1 09/19/2016 09/23/2016 IP 7111107T Heat Sink Performance

EB1-17T - GG PERM PLANT MODS & 50.59 INSPECTION 5

1 10/17/2016 11/04/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

RS 24 - RADIATION SAFETY 2

1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment

EP-1 - EP PERFORMANCE INDICATORS 1

1 12/12/2016 12/12/2016 IP 71151-EP01 Drill/Exercise Performance

1 12/12/2016 12/12/2016 IP 71151-EP02 ERO Readiness

1 12/12/2016 12/12/2016 IP 71151-EP03 Alert & Notification System Reliability

EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 1

1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing

1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

RS 13 PI - RADIATION SAFETY 2

1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4

1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]

1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation

1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 03/27/2017 03/31/2017 IP 71151-EP01 Drill/Exercise Performance

1 03/27/2017 03/31/2017 IP 71151-EP02 ERO Readiness

1 03/27/2017 03/31/2017 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG

Page 2 of 2 Grand Gulf

08/30/2016 09:35:11 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EXAM - INITIAL EXAM 3

1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)

1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)

EXAM - INITIAL LICENSED OPERATOR EXAM 4

1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1

1 07/01/2017 07/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

RS 5678 - RS TEAM 5

1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation

1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program

1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

BRQ - BRQ INSPECTION 3

1 08/07/2017 08/11/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - GG DESIGN BASIS INSPECTION 3

1 09/11/2017 10/13/2017 IP 7111121M Component Design Bases Inspection (Teams)

TSB 52B - BIENNIAL PI&R 4

1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution

1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution

71111.08 - INSERVICE INSPECTION R20 1

1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16242A335

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: CHY Yes No Non-Publicly Available Sensitive NRC-002

OFFICE DRP:C/SPE DRS: D DRP: D DRP:PBC

NAME CYoung AVegel TPruett GWarnick

SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/

DATE 8/15/16 8/17/16 8/18/16 8/29/16

Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION

(REPORT 05000416/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Neil.Day@nrc.gov)

Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (James.Kim@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov