ML16242A335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD
                                                REGION IV
ARLINGTON, TX 76011
                                            1600 E LAMAR BLVD
-4511 August 31, 2016
                                        ARLINGTON, TX 76011-4511
Mr. Vin Fallacara
                                            August 31, 2016
Acting Site Vice President Operations
Mr. Vin Fallacara
Entergy Operations, Inc.
Acting Site Vice President Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Grand Gulf Nuclear Station
Port Gibson, MS 39150
P.O. Box 756
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
Port Gibson, MS 39150
(REPORT 05000416/2016005)
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
Dear Mr. Fallacara: O n August 10, 2016 , the U.S. Nuclear Regulatory Commission (NRC)
                (REPORT 05000416/2016005)
completed its mid-cycle performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June
Dear Mr. Fallacara:
30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
The NRC determined that overall, Grand Gulf Nuclear Station
performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent
operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined  
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Licensee Response Column of the NRC
from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
your facility during this period and its plans for future inspections at your facility.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that
  The inspections listed during the second half
preserved public health and safety and met all cornerstone objectives. The NRC determined
of the inspection plan are tentative and may be revised at the end
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the
-of-cycle performance review. The NRC provides the inspection plan to allow for t
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
he resolution of any scheduling conflicts and personnel availability issues. The NRC will contact  
because all inspection findings had very low (i.e., green) safety significance, and all PIs
you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
indicated that your performance was within the nominal, expected range (i.e., green).
-publicly available correspondence.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
In response to the accident at Fukushima, the Commission issued Order EA
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
inspections performed by resident inspectors are not included in the inspection plan. The
-Design-Basis External Events
inspections listed during the second half of the inspection plan are tentative and may be revised
," and Order EA
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
 
you as soon as possible to discuss changes to the inspection plan should circumstances
V. Fallacara
warrant any changes. This inspection plan does not include security related inspections, which
- 2 -  Final Compliance letter
will be sent via separate, non-publicly available correspondence.
for the site, the Safety Evaluation will be issued.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
-Unit Dose Assessment Plans."
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
  As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional enforcement violations associated with impeding the regulatory process.
towards compliance with these Orders, and the information gathered will aid staff in
Therefore, the NRC
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
plans to conduct Inspection Procedure 92723, "Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12
-Month Period," to assess your evaluation of these violations and review the adequacy of associated corrective actions.
   
In Staff Requirements Memorandum
- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
  In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390
of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System
(ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).  Please contact
me at 817-200-1144 with any questions you have regarding this letter.
 
Sincerely, 
/RA/  Greg Warnick, Branch Chief
Project Branch C
Division of Reactor Projects
  Docket No.
50-416 License No.
NPF-29  Enclosure:
Grand Gulf Nuclear Station    Inspection/Activity Plan 
Page 1 of 2
08/30/201609:35:11 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on Site Grand GulfInspection / Activity Plan
07/01/2016
-06/30/2018IP 92723-IP 92723 FOLLOW UP FOR SL IV TE
1 1 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S
92723 09/26/2016
09/30/2016
EB1-07T-GG HEAT SINK PERFORMANCE INSPECTION
1 1 IP Heat Sink Performance7111107T 09/19/2016
09/23/2016
EB1-17T-GG PERM PLANT MODS & 50.59 INSPECTION
5 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 10/17/201611/04/2016
RS 24-RADIATION SAFETY
2 1 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016
1 IP Occupational Dose Assessment71124.0411/07/201611/11/2016
EP-1-EP PERFORMANCE INDICATORS
1 1 IP Drill/Exercise Performance71151-EP01
12/12/2016
12/12/2016
1 IP ERO Readiness71151-EP02
12/12/2016
12/12/2016
1 IP A lert & Notification System Reliability71151-EP03
12/12/2016
12/12/2016
EP3-EP PROGRAM INSPECTION (POSTPONE 2016)
1 1 IP A lert and Notification System Testing7111402 01/09/2017
01/13/2017
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/09/2017
01/13/2017
1 IP Emergency Action Level and Emergency Plan Changes7111404 01/09/2017
01/13/2017
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/09/2017
01/13/2017
RS 13 PI-RADIATION SAFETY
2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/13/2017
02/17/2017
1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 02/13/2017
02/17/2017
1 IP Occupational Exposure Control Effectiveness71151-OR01
02/13/2017
02/17/2017
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
02/13/2017
02/17/2017
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
4 1 IP Fire Protection [Triennial]7111105T 04/03/2017
04/07/2017
1 IP Fire Protection [Triennial]7111105T 04/17/2017
04/28/2017
EP-2-BIENNIAL EP EXERCISE INSPECTION
4 1 IP Exercise Evaluation7111401 03/27/2017
03/31/2017
1 IP Emergency Action Level and Emergency Plan Changes7111404 03/27/2017
03/31/2017
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
1 1 IP Drill/Exercise Performance71151-EP01
03/27/2017
03/31/2017
1 IP ERO Readiness71151-EP02
03/27/2017
03/31/2017
1 IP A lert & Notification System Reliability71151-EP03
03/27/2017
03/31/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
08/30/201609:35:11 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on Site Grand GulfInspection / Activity Plan
07/01/2016
-06/30/2018EXAM-INITIAL EXAM
3 1 INITIAL EXAM GG( 4/17)
X02613 04/10/2017
04/14/2017
1 INITIAL EXAM GG( 4/17)
X02613 05/08/2017
05/12/2017EXAM-INITIAL LICENSED OPERATOR EXAM
4 1 INITIAL EXAM GRAND GULF (12/2017)
X02598 10/30/201711/03/2017
1 INITIAL EXAM GRAND GULF (12/2017)
X02598 12/04/2017
12/08/2017
ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)
1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1 07/01/2017
07/30/2017
RS 5678-RS TEAM 5 1 IP Radiation Monitoring Instrumentation71124.05 07/10/2017
07/14/2017
1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/10/2017
07/14/2017
1 IP Radiological Environmental Monitoring Program71124.07 07/10/2017
07/14/2017
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/10/2017
07/14/2017
BRQ-BRQ INSPECTION
3 1 IP Licensed Operator Requalification Program7111111B 08/07/201708/11/2017
EB1-21M-GG DESIGN BASIS INSPECTION
3 1 IP Component Design Bases Inspection (Teams)7111121M09/11/2017
10/13/2017TSB 52B-BIENNIAL PI&R
4 1 IP Problem Identification and Resolution71152B 10/30/201711/03/2017
1 IP Problem Identification and Resolution71152B11/13/201711/17/201771111.08-INSERVICE INSPECTION R20
1 1 IP Inservice Inspection Activities - BWR7111108G 03/05/2018
03/09/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.


  ML16242A335 SUNSI ReviewBy:  CHY ADAMS Yes    NoPublicly Available Non-Publicly Available
V. Fallacara                                      -2-
   Non-Sensitive SensitiveKeyword: NRC-002 OFFICE DRP:C/SPE DRS: D DRP: D DRP:PBC NAME CYoung AVegel TPruett GWarnick SIGNATURE /RA/ /RA/JClark,for
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
/RA/ /RA/ DATE 8/15/16 8/17/16 8/18/16 8/29/16
will confirm through inspections the full implementation of the orders mentioned above by
Letter to Mr. Vin Fallacara from Greg Warnick dated
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
August 31, 2016
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016005)
Communication/Staffing/Multi-Unit Dose Assessment Plans.
  DISTRIBUTION
As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from
: Regional Administrator (Kriss.Kennedy@nrc.gov)
January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
enforcement violations associated with impeding the regulatory process. Therefore, the NRC
DRP Deputy Director (Ryan.Lantz@nrc.gov)
plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity
DRS Director (Anton.Vegel@nrc.gov)
Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess
DRS Deputy Director (Jeff.Clark@nrc.gov
your evaluation of these violations and review the adequacy of associated corrective actions.
) Senior Resident Inspector (Matt.Young@nrc.gov) Resident Inspector (Neil.Day@nrc.gov)
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Administrative Assistant  
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
(Yvonne.Dubay@nrc.gov
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
) Branch Chief, DRP/C (Greg.Warnick@nrc.gov)  
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov
to conduct quarterly assessment meetings and communicate changes in the assessment of
) Project Engineer (Michael.Stafford@nrc.gov)
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Project Engineer (Lindsay.Brandt@nrc.gov)
Operating Reactor Assessment Program.
Public Affairs Officer (Victor.Dricks@nrc.gov
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
) Project Manager (James.Kim@nrc.gov)
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
NRC Public Document Room or from the Publicly Available Records (PARS) component of
RITS Coordinator (Marisa.Herrera@nrc.gov
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
) ACES (R4Enforcement.Resource@nrc.gov)
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Regional Counsel (Karla.Fuller@nrc.gov
Electronic Reading Room).
) Technical Support Assistant (Loretta.Williams@nrc.gov)
Please contact me at 817-200-1144 with any questions you have regarding this letter.
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
                                                    Sincerely,
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
                                                    /RA/
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
                                                    Greg Warnick, Branch Chief
RIV RSLO (Bill.Maier@nrc.gov)
                                                    Project Branch C
Director, DIRS, NRR (Chris.Miller@nrc.gov)
                                                    Division of Reactor Projects
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Docket No.      50-416
Director, DORL, NRR (Anne.Boland@nrc.gov)
License No.    NPF-29
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Enclosure:
Director, NSIR (Brian.Holian@nrc.gov)
Grand Gulf Nuclear Station
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
  Inspection/Activity Plan
DRP Branch Chiefs (R4DRPBC@nrc.gov)
 
DRS Branch Chiefs (R4DRSBC@nrc.gov)
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                              GG
ROPreports.Resource@nrc.gov
Page 1 of 2                                                                                    Grand Gulf
ROPassessment.Resource@nrc.gov
08/30/2016    09:35:11                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                          No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                        on Site
                                        IP 92723      - IP 92723 FOLLOW UP FOR SL IV TE                                                                                        1
1          09/26/2016      09/30/2016    IP 92723                Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S
                                        EB1-07T        - GG HEAT SINK PERFORMANCE INSPECTION                                                                                    1
1          09/19/2016      09/23/2016    IP 7111107T              Heat Sink Performance
                                        EB1-17T        - GG PERM PLANT MODS & 50.59 INSPECTION                                                                                  5
1          10/17/2016      11/04/2016    IP 7111117T              Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
                                        RS 24          - RADIATION SAFETY                                                                                                      2
1          11/07/2016      11/11/2016    IP 71124.02              Occupational ALARA Planning and Controls
1          11/07/2016      11/11/2016    IP 71124.04              Occupational Dose Assessment
                                        EP-1          - EP PERFORMANCE INDICATORS                                                                                              1
1          12/12/2016      12/12/2016    IP 71151-EP01            Drill/Exercise Performance
1          12/12/2016      12/12/2016    IP 71151-EP02            ERO Readiness
1          12/12/2016      12/12/2016    IP 71151-EP03            Alert & Notification System Reliability
                                        EP3            - EP PROGRAM INSPECTION (POSTPONE 2016)                                                                                  1
1          01/09/2017      01/13/2017    IP 7111402              Alert and Notification System Testing
1          01/09/2017      01/13/2017    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          01/09/2017      01/13/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          01/09/2017      01/13/2017    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        RS 13 PI      - RADIATION SAFETY                                                                                                      2
1          02/13/2017      02/17/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          02/13/2017      02/17/2017    IP 71124.03              In-Plant Airborne Radioactivity Control and Mitigation
1          02/13/2017      02/17/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          02/13/2017      02/17/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        EB2-05T        - TRIENNIAL FIRE PROTECTION INSPECTION                                                                                  4
1          04/03/2017      04/07/2017    IP 7111105T              Fire Protection [Triennial]
1          04/17/2017      04/28/2017    IP 7111105T              Fire Protection [Triennial]
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                                        4
1          03/27/2017      03/31/2017    IP 7111401              Exercise Evaluation
1          03/27/2017      03/31/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3          - EP PERFORMANCE INDICATOR VERIFICATION                                                                                  1
1          03/27/2017      03/31/2017    IP 71151-EP01            Drill/Exercise Performance
1          03/27/2017      03/31/2017    IP 71151-EP02            ERO Readiness
1          03/27/2017      03/31/2017    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                          GG
Page 2 of 2                                                                                    Grand Gulf
08/30/2016    09:35:11                                                              Inspection / Activity Plan
Report 22
                                                                                      07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                        No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                    on Site
                                        EXAM          - INITIAL EXAM                                                                                                        3
1          04/10/2017      04/14/2017        X02613                INITIAL EXAM GG( 4/17)
1          05/08/2017      05/12/2017        X02613                INITIAL EXAM GG( 4/17)
                                        EXAM          - INITIAL LICENSED OPERATOR EXAM                                                                                      4
1          10/30/2017      11/03/2017        X02598                INITIAL EXAM GRAND GULF (12/2017)
1          12/04/2017      12/08/2017        X02598                INITIAL EXAM GRAND GULF (12/2017)
                                        ISFSI          - LOADING INSPECTION (ONE WEEK IN MONTH)                                                                              1
1          07/01/2017      07/30/2017    IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                        RS 5678        - RS TEAM                                                                                                            5
1          07/10/2017      07/14/2017    IP 71124.05              Radiation Monitoring Instrumentation
1          07/10/2017      07/14/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
1          07/10/2017      07/14/2017    IP 71124.07              Radiological Environmental Monitoring Program
1          07/10/2017      07/14/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                        BRQ            - BRQ INSPECTION                                                                                                      3
1          08/07/2017      08/11/2017    IP 7111111B              Licensed Operator Requalification Program
                                        EB1-21M        - GG DESIGN BASIS INSPECTION                                                                                          3
1          09/11/2017      10/13/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                        TSB 52B        - BIENNIAL PI&R                                                                                                      4
1          10/30/2017      11/03/2017    IP 71152B                Problem Identification and Resolution
1          11/13/2017      11/17/2017    IP 71152B                Problem Identification and Resolution
                                        71111.08      - INSERVICE INSPECTION R20                                                                                            1
1          03/05/2018      03/09/2018    IP 7111108G              Inservice Inspection Activities - BWR
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                                      Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
 
ML16242A335
  SUNSI Review                  ADAMS                   Publicly Available             Non-Sensitive Keyword:
   By: CHY                          Yes  No              Non-Publicly Available        Sensitive     NRC-002
  OFFICE           DRP:C/SPE DRS: D                   DRP: D           DRP:PBC
  NAME             CYoung         AVegel             TPruett         GWarnick
  SIGNATURE /RA/                 /RA/JClark,for /RA/                 /RA/
  DATE             8/15/16       8/17/16             8/18/16         8/29/16
                                               
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
                (REPORT 05000416/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov)
Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (James.Kim@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 15:42, 30 October 2019

Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005)
ML16242A335
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/31/2016
From: Greg Warnick
NRC/RGN-IV/DRP/RPB-C
To: Fallacara V
Entergy Operations
Warnick G
References
IR 2016005
Download: ML16242A335 (6)


See also: IR 05000416/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Vin Fallacara

Acting Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION

(REPORT 05000416/2016005)

Dear Mr. Fallacara:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent

quarterly performance indicators (PIs) in addition to inspection results and enforcement actions

from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of

your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Grand Gulf Nuclear Station during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

V. Fallacara -2-

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from

January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional

enforcement violations associated with impeding the regulatory process. Therefore, the NRC

plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity

Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess

your evaluation of these violations and review the adequacy of associated corrective actions.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Greg Warnick, Branch Chief

Project Branch C

Division of Reactor Projects

Docket No. 50-416

License No. NPF-29

Enclosure:

Grand Gulf Nuclear Station

Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG

Page 1 of 2 Grand Gulf

08/30/2016 09:35:11 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

IP 92723 - IP 92723 FOLLOW UP FOR SL IV TE 1

1 09/26/2016 09/30/2016 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S

EB1-07T - GG HEAT SINK PERFORMANCE INSPECTION 1

1 09/19/2016 09/23/2016 IP 7111107T Heat Sink Performance

EB1-17T - GG PERM PLANT MODS & 50.59 INSPECTION 5

1 10/17/2016 11/04/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

RS 24 - RADIATION SAFETY 2

1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment

EP-1 - EP PERFORMANCE INDICATORS 1

1 12/12/2016 12/12/2016 IP 71151-EP01 Drill/Exercise Performance

1 12/12/2016 12/12/2016 IP 71151-EP02 ERO Readiness

1 12/12/2016 12/12/2016 IP 71151-EP03 Alert & Notification System Reliability

EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 1

1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing

1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

RS 13 PI - RADIATION SAFETY 2

1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4

1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]

1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation

1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 03/27/2017 03/31/2017 IP 71151-EP01 Drill/Exercise Performance

1 03/27/2017 03/31/2017 IP 71151-EP02 ERO Readiness

1 03/27/2017 03/31/2017 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG

Page 2 of 2 Grand Gulf

08/30/2016 09:35:11 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EXAM - INITIAL EXAM 3

1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)

1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)

EXAM - INITIAL LICENSED OPERATOR EXAM 4

1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1

1 07/01/2017 07/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

RS 5678 - RS TEAM 5

1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation

1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program

1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

BRQ - BRQ INSPECTION 3

1 08/07/2017 08/11/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - GG DESIGN BASIS INSPECTION 3

1 09/11/2017 10/13/2017 IP 7111121M Component Design Bases Inspection (Teams)

TSB 52B - BIENNIAL PI&R 4

1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution

1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution

71111.08 - INSERVICE INSPECTION R20 1

1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16242A335

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: CHY Yes No Non-Publicly Available Sensitive NRC-002

OFFICE DRP:C/SPE DRS: D DRP: D DRP:PBC

NAME CYoung AVegel TPruett GWarnick

SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/

DATE 8/15/16 8/17/16 8/18/16 8/29/16

Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION

(REPORT 05000416/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Neil.Day@nrc.gov)

Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (James.Kim@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov