{{#Wiki_filter:1 Tran, Tam From:Tran, Tam Sent: Tuesday, March 07, 2017 3:06 PM To: 'Edward.Carley@nexteraenergy.com' Cc:James, Lois; Chazell, Russell; Morey, Dennis; Allik, Brian; Edmonds, Yvonne; Poole, Justin; McIntyre, David; Weil, Jenny; Dacus, Eugene; Harris, Brian; Ghosh, Anita;  
{{#Wiki_filter:Tran, Tam From:                             Tran, Tam Sent:                             Tuesday, March 07, 2017 3:06 PM To:                               'Edward.Carley@nexteraenergy.com' Cc:                               James, Lois; Chazell, Russell; Morey, Dennis; Allik, Brian; Edmonds, Yvonne; Poole, Justin; McIntyre, David; Weil, Jenny; Dacus, Eugene; Harris, Brian; Ghosh, Anita; Wachutka, Jeremy; Gray, Mel; Bower, Fred; Cataldo, Paul; Meier, Peter; Vadella, Robert; Tifft, Doug; Sheehan, Neil; Screnci, Diane
 
Wachutka, Jeremy; Gray, Mel; Bower, Fred; Cataldo, Paul; Meier, Peter; Vadella, Robert; Tifft, Doug; Sheehan, Neil; Screnci, Diane


==Subject:==
==Subject:==
Buried Piping ISG RAI Dec. 2016 Teleconference Attachments:
Buried Piping ISG RAI Dec. 2016 Teleconference Attachments:                     Buried Piping RAI Dec Call - Enclosure 1 and 2.pdf UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 LICENSEE:       NextEra Energy Seabrook, LLC FACILITY:      Seabrook Station, Unit No. 1
Buried Piping RAI Dec Call - Enclosure 1 and 2.pdf UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  
 
LICENSEE:     NextEra Energy Seabrook, LLC  
 
FACILITY:      Seabrook Station, Unit No. 1  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK,LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)  
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.
 
NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK,LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staff's request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staff's RAI.  
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staffs request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staffs RAI. provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.
 
The applicant had an opportunity to comment on this summary.
provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.  
Sincerely
 
                                                  /RA/
The applicant had an opportunity to comment on this summary.  
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-443
 
Sincerely  
                                                                        /RA/  
 
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation  
 
Docket No.: 50-443  


==Enclosures:==
==Enclosures:==
: 21. List of Participants 2. Summary of Teleconference


cc w/encls: See next page  
1
 
: 1. List of Participants
LICENSEE:     NextEra Energy Seabrook, LLC  
: 2. Summary of Teleconference cc w/encls: See next page LICENSEE:       NextEra Energy Seabrook, LLC FACILITY:       Seabrook Station, Unit No. 1
 
FACILITY:       Seabrook Station, Unit No. 1  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC,CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staff's request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staff's RAI.  
NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC,CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)
 
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staffs request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staffs RAI. provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.
provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.  
The applicant had an opportunity to comment on this summary.
 
Sincerely Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-443
The applicant had an opportunity to comment on this summary.  
 
Sincerely  
 
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation  
 
Docket No.: 50-443  


==Enclosures:==
==Enclosures:==
: 1. List of Participants 2. Summary of Teleconference  
: 1. List of Participants
: 2. Summary of Teleconference cc w/encls: See next page DISTRIBUTION: See next page ADAMS Accession No.: ML16341B902                                        *Concurred by e-mail OFFICE PM:RPB1:DLR LA:RPB1:DLR BC:RARB:DLR OGC                                BC(A):RPB1:DLR NAME      TTran*            YEdmonds          DMorey*          JWachutka* R Chazell DATE      12/6/2016        2/13/2017        3/7/2017          1/23/2017      3/ 7/2017 OFFICE PM:RPB1:DLR NAME      TTran 2


cc w/encls:  See next page DISTRIBUTION: See next page ADAMS Accession No.:  ML16341B902                                          *Concurred by e-mail OFFICE PM:RPB1:DLR LA:RPB1:DLR BC:RARB:DLROGC BC(A):RPB1:DLR NAME TTran* YEdmonds DMorey* JWachutka*R Chazell" DATE 12/6/2016 2/13/2017 3/7/2017 1/23/2017    3/ 7/2017 OFFICE PM:RPB1:DLR    NAME TTran 3DATE    3 /7/2017     OFFICIAL RECORD COPY  
DATE             3 /7/2017 OFFICIAL RECORD COPY


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION, LICENSE RENEWAL APPLICATION (CAC NO. ME4028)  
OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.
 
NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION, LICENSE RENEWAL APPLICATION (CAC NO. ME4028)
DISTRIBUTION:
DISTRIBUTION:
E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource  
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsOgcMailCenter Resource RidsNrrMailCenter Resource
----------------------------------------------------
Tam.Tran@nrc.gov Lois.James@nrc.gov Russell.Chazell@nrc.gov Dennis.Morey@nrc.gov Brian.Allik@nrc.gov Yvonne.Edmonds@nrc.gov Justin.Poole@nrc.gov David.McIntyre@nrc.gov, OPA Jenny.Weil@nrc.gov, OCA Eugene.Dacus@nrc.gov, OCA Brian.Harris@nrc.gov, OGC Jeremy.Watchuka@nrc.gov, OGC Mel.Gray@nrc.gov, RI Fred.Bower@nrc.gov, RI Paul.Cataldo@nrc.gov, RI Peter.Meier@nrc.gov, RI Richard.Barkley@nrc.gov, RI Robert.Vadella@nrc.gov, RI Mark.Draxton@nrc.gov, State Liason Dough.Tifft@nrc.gov, State Liason Neil.Sheehan@nrc.gov, RI PAO Diane.Screnci@nrc.gov, RI PAO 3


RidsNrrDlrRerb Resource
TELECONFERENCE SEABROOK STATION, UNIT NO. 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 6, 2016 PARTICIPANT                   AFFILIATION Tam Tran                     U.S. Nuclear Regulatory Commission (NRC)
 
Brian Allik                   NRC Dennis Morey                  NRC Edward Carley                NextEra Energy Seabrook, LLC (NextEra)
RidsOgcMailCenter Resource
Joshua Greene                 NextEra ENCLOSURE 1
 
RidsNrrMailCenter Resource ---------------------------------------------------- Tam.Tran@nrc.gov
 
Lois.James@nrc.gov Russell.Chazell@nrc.gov
 
Dennis.Morey@nrc.gov Brian.Allik@nrc.gov Yvonne.Edmonds@nrc.gov Justin.Poole@nrc.gov David.McIntyre@nrc.gov, OPA
 
Jenny.Weil@nrc.gov, OCA Eugene.Dacus@nrc.gov, OCA Brian.Harris@nrc.gov, OGC Jeremy.Watchuka@nrc.gov, OGC Mel.Gray@nrc.gov, RI
 
Fred.Bower@nrc.gov, RI
 
Paul.Cataldo@nrc.gov, RI Peter.Meier@nrc.gov, RI Richard.Barkley@nrc.gov, RI Robert.Vadella@nrc.gov, RI Mark.Draxton@nrc.gov, State Liason Dough.Tifft@nrc.gov, State Liason Neil.Sheehan@nrc.gov, RI PAO Diane.Screnci@nrc.gov, RI PAO
 
ENCLOSURE 1 TELECONFERENCE SEABROOK STATION, UNIT NO. 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 6, 2016 PARTICIPANT A FFILIATIONTam Tran U.S. Nuclear Re g ulator y Commission (NRC)Brian Allik NRC Dennis More y NRCEdward Carle y NextEra Ener gy Seabrook, LLC (NextEra) Joshua Greene NextEra
 
Enclosure 2


==SUMMARY==
==SUMMARY==
OF TELECONFERENCE SEABROOK STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION DECEMBER 6, 2016  
OF TELECONFERENCE SEABROOK STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION DECEMBER 6, 2016 The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant) held a teleconference on December 6, 2016, to discuss and clarify the following request for additional information (RAI) concerning the Seabrook Station license renewal application (LRA).
 
Draft RAI B.2.1.22-1a
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant) held a teleconference on December 6, 2016, to discuss and clarify the following request for additional information (RAI) concerning the Seabrook Station license renewal application (LRA).  
 
Draft RAI B.2.1.22-1a  


==Background:==
==Background:==


As amended by letter dated April 5, 2011, LRA Section B.2.1.22 stated that two inspections will be conducted for copper alloy greater than 15 percent zinc components within the scope of the Buried Piping and Tanks Inspection program in each 10-year period starting 10 years prior to the period of extended operation. This statement was deleted by letter dated October7,2016, when the Buried Piping and Tanks Inspection program was replaced in response to the issuance of LR-ISG-2015-01, "Changes to Buried and Underground Piping and Tank Recommendations."
As amended by letter dated April 5, 2011, LRA Section B.2.1.22 stated that two inspections will be conducted for copper alloy greater than 15 percent zinc components within the scope of the Buried Piping and Tanks Inspection program in each 10-year period starting 10 years prior to the period of extended operation. This statement was deleted by letter dated October 7, 2016, when the Buried Piping and Tanks Inspection program was replaced in response to the issuance of LR-ISG-2015-01, Changes to Buried and Underground Piping and Tank Recommendations.
 
As amended by letter dated November 23, 2016, LRA Section B.2.1.22 Table 2 states that the number of inspections for in-scope copper alloy greater than 15 percent zinc piping is dependent on the effectiveness of the cathodic protection system (i.e., Inspection Categories C, E, and F are applicable).
As amended by letter dated November 23, 2016, LRA Section B.2.1.22 Table 2 states that the number of inspections for in-scope copper alloy greater than 15 percent zinc piping is dependent on the effectiveness of the cathodic protection system (i.e., Inspection Categories C, E, and F are applicable).  
As amended by letter dated November 23, 2016, the LRA Section B.2.1.22 detection of aging effects program element states [t]here is no cathodic protection for in scope copper alloy
 
(>15% zinc) material as there are only in-scope components, not piping.
As amended by letter dated November 23, 2016, the LRA Section B.2.1.22 "detection of aging effects" program element states "[t]here is no cathodic protection for in scope copper alloy
Issue:
(>15% zinc) material as there are only in-scope components, not piping."
It is unclear to the staff if the number of inspections of copper alloy greater than 15 percent zinc components is dependent on the effectiveness of the cathodic protection system (as described in LRA Section B.2.1.22 Table 2), or if the number of inspections is not dependent on the effectiveness of the cathodic protection system (as described in the LRA Section B.2.1.22 detection of aging effects program element). The staff notes that the April 5, 2011, letter stated the number of inspections; however, this statement was deleted by the revised Buried Piping and Tanks Inspection program submitted by letters dated October 7, 2016, and November 23, 2016.
 
Issue: It is unclear to the staff if the number of inspections of copper alloy greater than 15 percent zinc components is dependent on the effectiveness of the cathodic protection system (as described in LRA Section B.2.1.22 Table 2), or if the number of inspections is not dependent on the effectiveness of the cathodic protection system (as described in the LRA Section B.2.1.22 "detection of aging effects" program element). The staff notes that the April 5, 2011, letter stated the number of inspections; however, this statement was deleted by the revised Buried Piping and Tanks Inspection program submitted by letters dated October 7, 2016, and November 23, 2016.  
 
Request:
Request:
State the number and periodicity of planned inspections of copper alloy greater than 15 percent zinc (aluminum bronze) components within the scope of the Buried Piping and Tanks Inspection  
State the number and periodicity of planned inspections of copper alloy greater than 15 percent zinc (aluminum bronze) components within the scope of the Buried Piping and Tanks Inspection program and revise the LRA as appropriate.
 
Enclosure 2
program and revise the LRA as appropriate.
Enclosure 2 Discussion:  Based on the discussion with the applicant, the NRC staff indicated that the response to this RAI requires clarification. The applicant agreed to clarify the information as a supplement to the application by January 10, 2017. The applicant clarified that the Buried Piping AMP will be revised to indicate that there is one copper valve that will be inspected twice every 10 years. Because the applicant agreed to supplement, this draft RAI was not issued as


final.}}
Discussion: Based on the discussion with the applicant, the NRC staff indicated that the response to this RAI requires clarification. The applicant agreed to clarify the information as a supplement to the application by January 10, 2017. The applicant clarified that the Buried Piping AMP will be revised to indicate that there is one copper valve that will be inspected twice every 10 years. Because the applicant agreed to supplement, this draft RAI was not issued as final.
Enclosure 2}}

Latest revision as of 11:38, 30 October 2019

03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application
ML16341B902
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/07/2017
From: Tam Tran
License Renewal Projects Branch 1
To: Mccartney E
NextEra Energy Seabrook
Tran T, 415-8517
References
CAC ME4028
Download: ML16341B902 (6)


Text

Tran, Tam From: Tran, Tam Sent: Tuesday, March 07, 2017 3:06 PM To: 'Edward.Carley@nexteraenergy.com' Cc: James, Lois; Chazell, Russell; Morey, Dennis; Allik, Brian; Edmonds, Yvonne; Poole, Justin; McIntyre, David; Weil, Jenny; Dacus, Eugene; Harris, Brian; Ghosh, Anita; Wachutka, Jeremy; Gray, Mel; Bower, Fred; Cataldo, Paul; Meier, Peter; Vadella, Robert; Tifft, Doug; Sheehan, Neil; Screnci, Diane

Subject:

Buried Piping ISG RAI Dec. 2016 Teleconference Attachments: Buried Piping RAI Dec Call - Enclosure 1 and 2.pdf UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station, Unit No. 1

SUBJECT:

SUMMARY

OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK,LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)

The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staffs request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staffs RAI. provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.

The applicant had an opportunity to comment on this summary.

Sincerely

/RA/

Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-443

Enclosures:

1

1. List of Participants
2. Summary of Teleconference cc w/encls: See next page LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station, Unit No. 1

SUBJECT:

SUMMARY

OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC,CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (CAC NO. ME4028)

The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (the applicant), held a teleconference on December 6, 2016, to discuss and clarify the staffs request for additional information (RAI) concerning the Seabrook Station license renewal application. The teleconference was useful in clarifying the intent of the NRC staffs RAI. provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description of the status of the items.

The applicant had an opportunity to comment on this summary.

Sincerely Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-443

Enclosures:

1. List of Participants
2. Summary of Teleconference cc w/encls: See next page DISTRIBUTION: See next page ADAMS Accession No.: ML16341B902 *Concurred by e-mail OFFICE PM:RPB1:DLR LA:RPB1:DLR BC:RARB:DLR OGC BC(A):RPB1:DLR NAME TTran* YEdmonds DMorey* JWachutka* R Chazell DATE 12/6/2016 2/13/2017 3/7/2017 1/23/2017 3/ 7/2017 OFFICE PM:RPB1:DLR NAME TTran 2

DATE 3 /7/2017 OFFICIAL RECORD COPY

SUBJECT:

SUMMARY

OF TELECONFERENCE HELD ON DECEMBER 6, 2016, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION, LICENSE RENEWAL APPLICATION (CAC NO. ME4028)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsOgcMailCenter Resource RidsNrrMailCenter Resource


Tam.Tran@nrc.gov Lois.James@nrc.gov Russell.Chazell@nrc.gov Dennis.Morey@nrc.gov Brian.Allik@nrc.gov Yvonne.Edmonds@nrc.gov Justin.Poole@nrc.gov David.McIntyre@nrc.gov, OPA Jenny.Weil@nrc.gov, OCA Eugene.Dacus@nrc.gov, OCA Brian.Harris@nrc.gov, OGC Jeremy.Watchuka@nrc.gov, OGC Mel.Gray@nrc.gov, RI Fred.Bower@nrc.gov, RI Paul.Cataldo@nrc.gov, RI Peter.Meier@nrc.gov, RI Richard.Barkley@nrc.gov, RI Robert.Vadella@nrc.gov, RI Mark.Draxton@nrc.gov, State Liason Dough.Tifft@nrc.gov, State Liason Neil.Sheehan@nrc.gov, RI PAO Diane.Screnci@nrc.gov, RI PAO 3

TELECONFERENCE SEABROOK STATION, UNIT NO. 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 6, 2016 PARTICIPANT AFFILIATION Tam Tran U.S. Nuclear Regulatory Commission (NRC)

Brian Allik NRC Dennis Morey NRC Edward Carley NextEra Energy Seabrook, LLC (NextEra)

Joshua Greene NextEra ENCLOSURE 1

SUMMARY

OF TELECONFERENCE SEABROOK STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION DECEMBER 6, 2016 The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant) held a teleconference on December 6, 2016, to discuss and clarify the following request for additional information (RAI) concerning the Seabrook Station license renewal application (LRA).

Draft RAI B.2.1.22-1a

Background:

As amended by letter dated April 5, 2011, LRA Section B.2.1.22 stated that two inspections will be conducted for copper alloy greater than 15 percent zinc components within the scope of the Buried Piping and Tanks Inspection program in each 10-year period starting 10 years prior to the period of extended operation. This statement was deleted by letter dated October 7, 2016, when the Buried Piping and Tanks Inspection program was replaced in response to the issuance of LR-ISG-2015-01, Changes to Buried and Underground Piping and Tank Recommendations.

As amended by letter dated November 23, 2016, LRA Section B.2.1.22 Table 2 states that the number of inspections for in-scope copper alloy greater than 15 percent zinc piping is dependent on the effectiveness of the cathodic protection system (i.e., Inspection Categories C, E, and F are applicable).

As amended by letter dated November 23, 2016, the LRA Section B.2.1.22 detection of aging effects program element states [t]here is no cathodic protection for in scope copper alloy

(>15% zinc) material as there are only in-scope components, not piping.

Issue:

It is unclear to the staff if the number of inspections of copper alloy greater than 15 percent zinc components is dependent on the effectiveness of the cathodic protection system (as described in LRA Section B.2.1.22 Table 2), or if the number of inspections is not dependent on the effectiveness of the cathodic protection system (as described in the LRA Section B.2.1.22 detection of aging effects program element). The staff notes that the April 5, 2011, letter stated the number of inspections; however, this statement was deleted by the revised Buried Piping and Tanks Inspection program submitted by letters dated October 7, 2016, and November 23, 2016.

Request:

State the number and periodicity of planned inspections of copper alloy greater than 15 percent zinc (aluminum bronze) components within the scope of the Buried Piping and Tanks Inspection program and revise the LRA as appropriate.

Enclosure 2

Discussion: Based on the discussion with the applicant, the NRC staff indicated that the response to this RAI requires clarification. The applicant agreed to clarify the information as a supplement to the application by January 10, 2017. The applicant clarified that the Buried Piping AMP will be revised to indicate that there is one copper valve that will be inspected twice every 10 years. Because the applicant agreed to supplement, this draft RAI was not issued as final.

Enclosure 2