MONTHYEARML16230A1822016-09-0101 September 2016 Proprietary Information Determination Project stage: Other SBK-L-16156, Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations2016-10-0707 October 2016 Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations Project stage: Request ML16277A5492016-10-13013 October 2016 Regulatory Audit Plan - Alkali Silica Reaction Aging Management Program, Regarding Seabrook Station, Unit 1, License Renewal Application Review Project stage: Other ML16301A4282016-11-14014 November 2016 Requests for Additional Information for the Review of the License Renewal Application Project stage: RAI SBK-L-16186, Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations2016-11-23023 November 2016 Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations Project stage: Response to RAI ML16326A0372016-11-30030 November 2016 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML16333A2472016-12-21021 December 2016 Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal Project stage: Other ML17017A3742017-02-27027 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML17066A4882017-03-16016 March 2017 Steam Generator ISG RAI for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML17088A6142017-03-29029 March 2017 Request for Additional Information for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML17139B8352017-05-24024 May 2017 Final Request for Additional Information Regarding Seabrook License Renewal Application - Set 26 Project stage: RAI ML17357A0452017-05-24024 May 2017 2017/05/24 Seabrook La - Seabrook Station, Unit 1 Final Request for Additional Information Regarding Seabrook License Renewal Application Set 26 Project stage: RAI SBK-L-17087, Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-05-25025 May 2017 Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Response to RAI ML17309A0692017-06-0505 June 2017 2017/06/05 Seabrook La - Summary of Meeting Held on May 9, 2017, Between the U.S. Nuclear Regulatory Commission Staff and Nextera Energy Seabrook, LLC, Representatives to Discuss the Seabrook Station, License Renewal Application Project stage: Meeting SBK-L-17102, Clarification to Supplement 53 - Response to Request for Additional Information for the Review of the License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-06-20020 June 2017 Clarification to Supplement 53 - Response to Request for Additional Information for the Review of the License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Response to RAI SBK-L-17103, Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program2017-06-20020 June 2017 Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program Project stage: Response to RAI SBK-L-17169, Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-171552017-10-17017 October 2017 Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-17155 Project stage: Supplement ML17262A3742017-12-0808 December 2017 Project Manager Change for the License Renewal of Seabrook, Unit 1, License Renewal Application Project stage: Other ML18254A2942018-09-28028 September 2018 Safety Evaluation Report Re License Renewal of Seabrook Station Unit 1 Project stage: Approval ML18254A2812018-09-28028 September 2018 Final SER Project stage: Request ML18254A2932018-09-28028 September 2018 Safety Evaluation Report Re License Renewal of Seabrook Unit 1 Project stage: Approval ML18362A3702019-01-0202 January 2019 Safety Evaluation Report Re License Renewal of Seabrook Station Unit 1. Supersedes ML18254A294 Project stage: Approval ML18345A1202019-03-12012 March 2019 Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Request ML18345A1212019-03-12012 March 2019 Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Approval ML18345A2322019-03-12012 March 2019 Federal Register Notice - Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Approval ML19205A3902019-07-24024 July 2019 NRC042 - Letter from Tam Tran, NRC, to Eric Mccartney, NextEra, Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal (CAC No. ME4028) (Dec. 21, 2016) Project stage: Other 2017-03-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] |
Text
March 12, 2019 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd Juno Beach, FL. 33408
SUBJECT:
ISSUANCE OF RENEWED FACILITY OPERATING LICENSE NO. NPF-86 FOR SEABROOK STATION, UNIT NO. 1 (CAC NO. ME4028)
Dear Mr. Nazar:
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit No. 1 (Seabrook). The NRC issued the renewed facility operating license based on its review of NextEra Energy Seabrook LLCs (NextEra) application dated May 25, 2010, as supplemented by letters submitted to the NRC through August 29, 2018. The technical specifications for Seabrook were not amended as a result of the NRCs license renewal review. Renewed Facility Operating License No. NPF-86 for Seabrook expires at midnight on March 15, 2050.
The NRC report, Safety Evaluation Report Related to the License Renewal of Seabrook Station, sets forth the technical basis for issuing the Seabrook renewed facility operating license (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18362A370). The NRC also conducted an environmental review of the Seabrook license renewal application. The NRC provides the results of this environmental review in the record of decision (Enclosure 3 to this letter) as well as in Supplement 46, Regarding Seabrook Station, Final Report, to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, dated July 2015 (ADAMS Accession Nos. ML15209A575 and ML15209A870). to this letter contains Renewed Facility Operating License No. NPF-86 for Seabrook. contains the following appendices related to Seabrook:
- Appendix A, Technical Specifications
- Appendix B, Environmental Protection Plan
- Appendix C, Additional Conditions The NRC made no changes to the Appendices (technical specifications, the environmental protection plan, or the additional conditions) as a result of this license renewal.
M. Nazar Enclosure 3 is the Record of Decision for Seabrook. is a draft copy of the related Federal Register notice of issuance of the renewed license as sent to the Office of the Federal Register for publication.
If you have any questions regarding this matter, please contact me by phone at 301-415-6332 or by e-mail at William.Burton@nrc.gov.
Sincerely,
/RA/
William F. Burton, Senior Project Manager License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
- 1. Seabrook, Renewed Facility Operating License
- 2. Seabrook, Appendices A, B, and C
- 3. Record of Decision for Seabrook
- 4. Copy of draft Federal Register notice cc: Listserv
ML18345A120 (Package), ML18345A121 (Letter),
ML18355A491 (Renewed License), ML053130320 (Appendices), ML19002A160 (ROD),
ML18345A232 (FRN) *concurrence via e-mail OFFICE PM:DMLR:MRPB LA:DMLR:MRPB* TECH ED* PM:DORL* BC:DORL*
NAME WBurton SLent CHsu JPoole JDanna DATE 12/20/2018 12/20/2018 1/2/2019 2/27/2019 2/28/2019 OFFICE BC:MENB/DMLR* BC:DMLR/MRPB* OGC-NLO* (A) D: DMLR D: NRR NAME BBeasley EOesterle JWatchutka JDonoghue HNieh DATE 2/28/2019 2/27/2019 2/26/2019 2/28/2019 3/12/2019 OFFICE BC:MENB/DMLR NAME WBurton DATE 3/12/2019 Enclosure 1 Seabrook Station, Unit No. 1 Renewed Facility Operating License ADAMS Accession No. ML18355A491
Enclosure 2 Seabrook Station, Unit No. 1 Appendix A, Technical Specifications, Appendix B, Environmental Protection Plan, and Appendix C, Additional Conditions ADAMS Accession No. ML053130320 The Technical Specifications, Environmental Protection Plan, and Additional Conditions did not change as a result of the renewal of the Seabrook Station, Unit No. 1, license.
Enclosure 3 Seabrook Station, Unit No. 1 Record of Decision ADAMS Accession No. ML19002A160
Enclosure 4 Copy of the Draft Federal Register Notice of Issuance of the Renewed Facility Operating License Seabrook Station, Unit No. 1 ADAMS Accession No. ML18345A232