Letter Sequence Other |
---|
|
|
MONTHYEARML16230A1822016-09-0101 September 2016 Proprietary Information Determination Project stage: Other SBK-L-16156, Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations2016-10-0707 October 2016 Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations Project stage: Request ML16277A5492016-10-13013 October 2016 Regulatory Audit Plan - Alkali Silica Reaction Aging Management Program, Regarding Seabrook Station, Unit 1, License Renewal Application Review Project stage: Other ML16301A4282016-11-14014 November 2016 Requests for Additional Information for the Review of the License Renewal Application Project stage: RAI SBK-L-16186, Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations2016-11-23023 November 2016 Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations Project stage: Response to RAI ML16326A0372016-11-30030 November 2016 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML16333A2472016-12-21021 December 2016 Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal Project stage: Other ML17017A3742017-02-27027 February 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application Project stage: RAI ML17066A4882017-03-16016 March 2017 Steam Generator ISG RAI for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML17088A6142017-03-29029 March 2017 Request for Additional Information for the Review of the Seabrook Station License Renewal Application Project stage: RAI ML17139B8352017-05-24024 May 2017 Final Request for Additional Information Regarding Seabrook License Renewal Application - Set 26 Project stage: RAI ML17357A0452017-05-24024 May 2017 2017/05/24 Seabrook La - Seabrook Station, Unit 1 Final Request for Additional Information Regarding Seabrook License Renewal Application Set 26 Project stage: RAI SBK-L-17087, Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-05-25025 May 2017 Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Response to RAI ML17309A0692017-06-0505 June 2017 2017/06/05 Seabrook La - Summary of Meeting Held on May 9, 2017, Between the U.S. Nuclear Regulatory Commission Staff and Nextera Energy Seabrook, LLC, Representatives to Discuss the Seabrook Station, License Renewal Application Project stage: Meeting SBK-L-17102, Clarification to Supplement 53 - Response to Request for Additional Information for the Review of the License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-06-20020 June 2017 Clarification to Supplement 53 - Response to Request for Additional Information for the Review of the License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Response to RAI SBK-L-17103, Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program2017-06-20020 June 2017 Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program Project stage: Response to RAI SBK-L-17169, Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-171552017-10-17017 October 2017 Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-17155 Project stage: Supplement ML17262A3742017-12-0808 December 2017 Project Manager Change for the License Renewal of Seabrook, Unit 1, License Renewal Application Project stage: Other ML18254A2942018-09-28028 September 2018 Safety Evaluation Report Re License Renewal of Seabrook Station Unit 1 Project stage: Approval ML18254A2812018-09-28028 September 2018 Final SER Project stage: Request ML18254A2932018-09-28028 September 2018 Safety Evaluation Report Re License Renewal of Seabrook Unit 1 Project stage: Approval ML18362A3702019-01-0202 January 2019 Safety Evaluation Report Re License Renewal of Seabrook Station Unit 1. Supersedes ML18254A294 Project stage: Approval ML18345A1202019-03-12012 March 2019 Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Request ML18345A1212019-03-12012 March 2019 Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Approval ML18345A2322019-03-12012 March 2019 Federal Register Notice - Issuance of Renewed Facility Operating License No. NPF-86 for Seabrook Station, Unit 1 Project stage: Approval ML19205A3902019-07-24024 July 2019 NRC042 - Letter from Tam Tran, NRC, to Eric Mccartney, NextEra, Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal (CAC No. ME4028) (Dec. 21, 2016) Project stage: Other 2017-03-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Proprietary Information Review
MONTHYEARML17088A6742018-08-17017 August 2018 Request for Withholding Information from Public Disclosure ML17017A3742017-02-27027 February 2017 Request for Withholding Information from Public Disclosure ML16230A1822016-09-0101 September 2016 Proprietary Information Determination ML15173A1202015-07-14014 July 2015 Request for Withholding Information from Public Disclosure ML15128A1482015-06-0505 June 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 ML15084A3752015-04-0303 April 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 (TAC Nos. MF4576 and MF4577) ML14168A2472014-07-17017 July 2014 Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML14078A1062014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML14078A6242014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault ML13263A1382013-10-21021 October 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML13156A1252013-06-0404 June 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station: Response to Confirmatory Action Letter - CAL No. 2012-002) ML13094A4092013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1012013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A0262013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1222013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13088A2622013-04-0303 April 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station - Response to Confiromatory Action Letter - CAL No. 2012-002) ML12270A4312012-10-0202 October 2012 Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML12256B0372012-09-26026 September 2012 Request for Withholding Information from Public Disclosure Regarding Relief Request for Service Water Piping ML1126404932011-10-0606 October 2011 Request for Withholding Information from Public Disclosure ML0722000282007-08-21021 August 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0626804622006-09-27027 September 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0625100622006-09-19019 September 2006 Westinghouse Electric Company, LLC - Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0534701812005-12-16016 December 2005 Caldon, Inc., Request for Withholding Information from Public Disclosure During NRC Meeting to Discuss Seabrook Measurement Uncertainty Recapture License Amendment Request ML0534903472005-12-12012 December 2005 Caldon Inc. Proprietary Information Package, INFO-18 ML0532601922005-11-28028 November 2005 FPL Energy Seabrook, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station ML0430803222004-11-19019 November 2004 Withholding from Public Disclosure, Westinghouse Responses to NRC Requests for Additional Information (Rais) for Seabrook Station Stretch Power Uprate (Proprietary) ML0409804772004-10-14014 October 2004 Request for Withholding Information from Public Disclosure, Stretch Power Uprate NSSS Licensing Report Supplemental Information, WCAP-16223-NP 2018-08-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 1, 2016 Mr. Eric McCartney, Site Vice President Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. ME4028)
Dear Mr. McCartney:
By letter dated August 9, 2016, available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML16224B079, you submitted to the U.S. Nuclear Regulatory Commission (NRC) an affidavit dated August 9, 2016, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
Enclosure 2 to SBK-L-16013, Seabrook Station License Renewal Application Resubmittal of SBK-L-15202 Enclosure 1 -Figures 17-19 (Proprietary).
As stated in the letter, the information provided in Enclosure 2 to SBK-L-16013 does not affect the non-proprietary version of the information previously submitted in SBK-L-15202, your response to the NRC staff request for additional information related to alkali-silica reaction, dated December 3, 2015 (ADAMS Accession No. ML15343A470).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- The information sought to be withheld is considered to be proprietary and confidential commercial information because alkali-silica reaction (ASR) is a newly identified phenomenon at domestic nuclear plants. The information requested to be withheld is the result of several years of intensive NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) effort and the expenditure of a considerable sum of money. This information may be marketable in the event nuclear facilities or other regulated facilities identify the presence of ASR. In order for potential customers to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended. The extent to which this information is available to potential customers diminishes NextEra Energy Seabrook's ability to sell products and services involving the use of the information.
Thus, public disclosure of the information sought to be withheld is likely to cause substantial harm to NextEra Energy Seabrook's competitive position and NextEra Energy Seabrook has a rational basis for considering this information to be confidential commercial information.
- The information sought to be withheld is being submitted to the NRC in confidence.
E. McCartney
- The information sought to be withheld has, to the best of NextEra Energy Seabrooks knowledge and belief, consistently been held in confidence by NextEra Energy Seabrook, has not been disclosed publicly, and has not been made available in public sources.
- The information is of a sort customarily held in confidence by NextEra Energy Seabrook, and is in fact so held.
- All disclosures to third parties, including any required transmittals to the NRC, have been or will be pursuant to regulatory provisions and/or confidentiality agreements that provide for maintaining the information in confidence.
We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Enclosure 2 to SBK-L-16013 marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3617 or by e-mail at Tam.Tran@nrc.gov.
Sincerely,
/RA/
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
E. McCartney
- The information sought to be withheld has, to the best of NextEra Energy Seabrooks knowledge and belief, consistently been held in confidence by NextEra Energy Seabrook, has not been disclosed publicly, and has not been made available in public sources.
- The information is of a sort customarily held in confidence by NextEra Energy Seabrook, and is in fact so held.
- All disclosures to third parties, including any required transmittals to the NRC, have been or will be pursuant to regulatory provisions and/or confidentiality agreements that provide for maintaining the information in confidence.
We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Enclosure 2 to SBK-L-16013 marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3617 or e-mail Tam.Tran@nrc.gov.
Sincerely,
/RA/
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
See next page Accession No. ML16230A182
- Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR PM:RASB BC:RPB1:DLR OGC PM:RPB1:DLR NAME IBetts* TTran BWittick* YDiaz-Sanabria* JWachutka* TTran DATE 8/19/16 8 /11/16 8/29/16 8/29/16 9/1/16 9/1/16 OFFICIAL RECORD COPY
Letter to E. McCartney from T. Tran September 1, 2016
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. ME4028)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter Resource Rids NrrMailCenter Resource RidsNrrPMSeabrook Resource Richard.Plasse@nrc.gov Justin.Poole@nrc.gov Tam.Tran@nrc.gov James.Danna@nrc.gov Brian.Wittick@nrc.gov John.Lamb@nrc.gov David.Mclntyre@nrc.gov Eugene.Dacus@nrc.gov Brian.Harris@nrc.gov Jeremy.Wachutka@nrc.gov Fred.Bower@nrc.gov Paul.Cataldo@nrc.gov Rich.Barkley@nrc.gov Chris.Lally@nrc.gov Christopher.Newport@nrc.gov Christopher.Highley@nrc.gov Doug.Tifft@nrc.gov Neil.Sheehan@nrc.gov Diane.Screnci@nrc.gov