December 11, 2012 Summary of Meeting Regarding Status of Degraded Concrete on Seabrook Station, Unit 1,
ML13004A178
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/04/2013
From: James Trapp
Engineering Region 1 Branch 1
To:
References
Download: ML13004A178 (15)


Text

{{#Wiki_filter:-ffi UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE lOO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 January 4,2013 LICENSEE: NextEra Energy Seabrook, LLC (NextEra) FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 11,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML121254172). A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML123244218). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in f nspection Report No. 0500044312012009 (ADAMS Accession No. M112338A283). The NRC slides presented (ADAMS Accession No. ML12356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implications related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff. A,.A-J) James M. Trapp, Chief ffiFo, Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees
2) CAL Response Status
3) List of References cc Mencl: Distribution via ListServ

LICENSEE: NextEra Energy Seabrook, LLC (NextEra) FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 1 1,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML12125A172). A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. M1123244218). ADAMS is accessible from the NRC Web site at http://rruww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in Inspection Report No. 0500044312012009 (ADAMS Accession No. ML123384283). The NRC slides presented (ADAMS Accession No. M112356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implicaticlns related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff.

                                                                                 /RN James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees
2) CAL Response Status
3) List of References cc w/encl: Distribution via ListServ DOC NAME: c \DRS\SeabrooK Concrete\Media-Pub\For ShPt Pub Mtg 12-2012\Meeting Summary\SB Meeting Summary 12-11-2012.docx ADAMS Accession No.: ML130044178 V Non-sensitive g Publicly Available tr SUNSI Review n D Non-Publicly Available Sensitive
                  -RI/DRS                     -RYDRS                    RI/DRP                    RI/DRS OFFICE NAME               I\Fioyd-                   RConte                     DSchroeder                JTrapp/RC DATE                t2121t'12                  12t27t12                  1 /3/1 3                   1t4113 see previous concurrence                           OFFIC !AL             COPY

Distribution w/encl: (via E-mail) W. Dean, RA (RToRAMATL RESOURCE) D. Lew, DRA (RToRAMATL RESOURCE) D. Roberts, DRP (RToRAMATL RESOURCE) P. Wilson, DRP (RToRAMATL RESOURCE) C. Miller, DRS (RToRAMATL RESOURCE) J. Clifford, DRS (RToRAMATL RESOURCE) R. Conte, DRS J. Trapp, DRS D. Schroeder, DRP L. Cline, DRP R. Montgomery, DRP A. Turilin, DRP W. Raymond, DRP, SRI S. Rich, DRP, Acting SRI M. Jennerich, DRP, Rl A. Cass, DRP, AA C. Santos, Rl OEDO RidsNrrPMSeabrookResou rce RidsNrrDorlLpl 1 -2 Resource

ENCLOSURE 1

                                 $EABROOK STATION A$R PUBLIC MEETING DECEMBER 12,2A12 ATTENDANCE LIST Organization 0R.rce s f'Jt                    ft o    nn a--

fa fu f,hf rrv1d

      &      r:atle*           /Jtycl  e r*

Rr fuexkr *" -\Ji" LeK,me"t d,i*i &"4 *-/o

 ,l        -a
s. &-{2 t.

I Ir- /)

&r/t\            tllV ! Aa t/r?
                    ^AtftttLK r It-/a\,H      t rv tz.t-tt flrh an ?'oq,            {/plrsn o{ futu.rned i fiqtu-K*                         t"      M f^{

S $^{*\

-T;             rL"t*

Enclosure 1

ENCLOSURE 1 Att*ndse Srgmni:*limr-r

  • s*x; T*ou& u**{
 &-.,'w$ Pa4ter*$

D q,rt,. .{o74fg Itq*ry &g** Jk *terri*

'{;-  ---l --'---- - 't "
*[l<u.Jt"r'*r*'-

SXd{.y $.&*+ u*{ W S#d$nsd /s ro,ry# r$"f, tk'ds{ ltfff frs" $r"cx# rr-

ENCLOSURE 1 Organization {,^ 6o*I ?, A Stt vnt-4, lf* t#5$*s"h #e"g,t* J,E R*r Ff Pt^ *4*w* $t* #rn* AE.,Yx &t*&* fr-ftsu,{} y'^o*

    1. C*\t fluu*r*r h * .'* &*sry **.* 5r{$t Ka",, K*k"r,tl e*izrrl; t.o_tt'q,"

ENCLOSURE 1 Organization

   ) trf uu Vrl ll.Ld.W{.tu'l N*&1fise*u1 ft sf         i.xnh*          S*7 1 v*y"*

,froul,l,

                         /l     f\    l --F S^nJeo &u*+u L-rO \V-v+lLeJsm Sran 8"".&r                  ${1 i{.58 l"i}

tt aK LLv,\W rl'Uxrefl* {)hut* GggsS L'nc\c* G"n" l '*, ttA tcfing- U(SIlYi t*En"{RA hlnv.a lileryi'* t{r;t"^

ENCLOSURE 1 Attend*e *rgxn{xalion "{* $,;e** Tb*#k*dr - {* r,{qoq *Jx^1H Scrt-F A. ff*- f,.., lqr. f $- tf Tgr qfu&o* f"/;t'i dsdt $dlk"h {", Enclosure 1

ENCLOSURE 1 Organization 51(e( d{t"il-d pornclzP+lc I a-x/ ill//rt r r ?ttt oF A"^.treul +'{^o{4do'^ An' U\"Y tfutnWr&*r,1 ,afu *J w B u *Y?a {Zr L t TY (ourt.,l fl, k tAltts 11 Ras,D*T

    -fi,A^   \re rs t  basrJ"I r>t   I l,      /
,f/Ott"{   FaLflU1n I"ob }JJ;\L Co^\,^- Co.L^n          t{17

{nGr*u A*l-ouu lrLT -f Enclosure 1

ENCLOSURE 1 SEABROOK STATION ASR PUBLIC MEFTING DESHMBER 12,2012 ATTENDANCE LIST Attendee Organization I ilA ryLRB /Yto/t< 5,fr f t

  • Drr-rr****)4/ sh>",,,

fit,' S, l4odwl Atxt e ru C^ &qc$i^'*--'"- u\J C *ro

'y ,/-
/\ ^-A-(' -J { rt rr*'
                 -t--..-

L-1o I t.  ;, k\,'q. N Ufr.'^ \--{u au rt \g. a tz"')tu"tq-e 11\ &"'\-cl ' uL{'t<*

  ?e-Pr f - T.ttrno's       t{o*Fr^     So*:ar*'l,-
                          ;{o,sscrc-ht*e-e*S Ke{.nteen ()'Cmna- S-+qJc*-
                  -T:\,l*

FarSt e:14-f,)isfir*rC{ Enclosure 1

ENCLOSURE 1 Organization

  &1    H f{)c-t(     / Mr\*
                      ^ftr'r- ,

f,x'< {1"nry4

                      /*,fr /'la/'"$b p  Weuwv    Ct.f \ ul  f.l. t{ u4o"r* "-{

Qw**,tal'*, Q,aP. -sr'

                         ?r*,E      64s Pt,lz.,; Cos-re.Cu;
                               !f,.6r;,a, . rwr g>f-r.r$- / {4y^.,?o
                                        ,') t-

ENCLOSURE 2 CAL Response Status 12t3t12 STATUS Sub-LEAD OTHER LICENSEE DOC. CAL ITEM CL EB1 Lic. AR 581434 Rev. 2 1. Revise the prompt operability Compl. uploaded to internal determination (POD) associated with RPT 1 file 5123112 AR581 434,'Reduced Concrete Properties Below Grade in "8" Electrical Tunnel Exterior Wall,'by May 25,2012. NextEra Energy Seabrook will notify the site NRC Resident Inspector upon completion of this action. CL/OP EB1 Licensee Ltr 5124112 - ADAMs 2. Submit the root cause for the Planning Accession No. organizational causes associated with RPTl to Revise M112151A396 Ltr & the occurrence of ASR at Seabrook Encl. 1 Station and related corrective actions by May 25,2012. CL DE/DLR Lic. ttr 5124112 - ADAMs 3. Submit the evaluation, "lmpact of Compl. Accession No. ASR on Concrete Structures and RPTl ML121514397 Encl. 2 Attachments," (Foreign Print 1 0071 6) bv May 25,2012. Under DE/DLR Lic. Ltr 618112 - ADAMS 4 Submit the corrective action plan for NRC Compl. Accession No. the continued assessment of ASR in Review ML121714277 concrete structures at Seabrook Station including development of RPT2 remedial actions to mitigate the affects of ASR, where warranted, by June 8, 2012. CL EB1 Lic. AR 01664399/AR 5. Revise the POD associated with Compl. 1757861 Rev. 2 AR1 664399,'Reduced Concrete RPTl uploaded to internal Modulus of Elasticity Below Grade in file6125112 Containment Enclosure Building, RHR Equipment Vaults, EFW Pump House, and Diesel Generator Fuel Oil Storage Rooms,' by June 30, 2012. The expanded scope buildings will be included in this POD. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action. CL EB1 Lic. 6129112FP 100734 6. Complete short term aggregate Compl. uploaded to internal expansion testing (ASTM C 1260 RPT 1 file. Mortar Bar Expansion Test) by June 30,2012. Results will be available for NRC review approximately 30 days after testinq is complete. Due June EB1 Licensee NextEra discussed 7. Complete long term aggregate 2013 Planning planned changes with expansion testing (ASTM C 1293 to Revise inspection staff - Concrete Prism Test) by June 30, RPT 2 Letter Revision, TBD 2013. Results will be available for NRC review approximately 30 days after testinq is comolete. Enclosure 2

ENCLOSURE 2 STATUS BRANCH OTHER LICENSEE DOC. CAL ITEM LEAD Under DE/DLR Lic. ttr 6121112 - ADAMS 8. Submit the technical details of the NRC Compl. Accession No. testing planned at the contracted Review ML121794281 and research and development facility by Encl. ML 1217gAZBz June 30.2012. RPT2 Under EB1 Lic. 7116t12 EDS 36180 9. Update the Maintenance Rule NRC Compl. uploaded to internal Structures Monitoring Program to Review DLR issuing file. include monitoring requirements for AMP selected locations in areas that exhibit questions ASR by July 15, 2012. NextEra RPT 2 related to this Energy Seabrook will notify the site area by end NRC Resident lnspector upon of Aus2012 completion of this action. Under EB1 Lic. 7116112 FP 100738 10. Perform the initial six-month NRC Compl. uploaded to internal interval crack measurements and Review file. crack indexing at 20 locations in areas that exhibit the highest crack indices by July 15,2012. Crack measurement RPT 112 will be performed at six-month intervals until a reliable trend of ASR progression is established. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action. Due Dec. EB1 Licensee At the FSEL - 11. Complete anchor test program by 2012 Planning NextEra discussed December 31. 2012. Results will be to Revise planned changes with available for NRC review RPT 2 inspection staff - approximately 30 days after testing is Letter Revision, TBD complete. Under EB1 Ph I and ll Walkdown Uploaded Not a CAL item since it was assumed NRC Lic. to internalfile as are to be completed or new completion at Review. Compl. Primary Containment the time of the management meeting Eng. Eval. & OD. of April 23,2012 - Phase lll was noted RPT,l/2 Item in during the meeting a issue to be Phase lll completed - this is where Primary Done last Containment indications were noted outaoe and report to the ACRS. Re: Commitments made by NextEra in Letters, dated May 3 and May 10,2012 (Agencywide Documents and Management System (ADAMS) Accession Numbers ML121254022 and ML121314479, respectively), Report No. 1 (RPT 1): 050004432012009, Ended 1112112 - lssued 1213112 Report No. 2 (RPT 2): 050004432012010 to End - TBD Enclosure 2

ENCLOSURE 3 Confirmatorv Action Letter for Alkali-silica Reaction Issue at Seabrook Related List of References and ML Nos. NRC Documents:

1. NRC lnspection Report No. 050043312011010, issued March 26,2012 (ADAMS Accession No. M1120480066)
2. Management Meeting of April 23,2010, Meeting Notice (ADAMS Accession No. ML1132360175)
3. Management Meeting of April 23,2010, NRC Questions/Slides/Summary (ADAMS Accession Nos. ML1210401021Mt121 1 60333, ML121160433, and ML121220109)
4. Confirmatory Action Letter No. 2012'002, dated May 16, 2012 (ADAMS Accession No. M1121254172)
5. Transcript of Advisory Committee on Reactor Safety (ACRS) Plant License Renewal Subcommittee Meeting of July 10,2012, issued July 25, 2012 (ADAMS Accession No. M1122070401)
6. NRC Staff Alkali-silica Reaction (ASR) Working Group Charter, issued July 9, 2012 (ADAMS Accession No. ML121250588, publicly available September 14,2012)
7. NRC Staff Memorandum, issued September 5,2012, on Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction lssue at Seabrook (ADAMS Accession No. ML122424372)
8. Letter to NextEra, issued September 12,2012, Transmitting the Memorandum Related to the Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station No. 1 (ADAMS Accession No. ML12242A363 (ADAMS Package))
9. NRC Inspection Report No. 050043312012009, issued December 3,2012 (ADAMS Accession No. ML123384283)
10. Letter to C-10, D. Grinnell, issued December 3,2012, Transmitting Answers to Questions Related to Seabrook ASR at Seabrook Station No. 1 (ADAMS Accession No.

M1123394233) 1 1. Letter to C-10, S. Gavutis, issued December 3, 2012, Response to Letter of September 13, 2012 ( DAMS Accession No. ML123394204) Enclosure 3

ENCLOSURE 3

12. Letter to Union of Concerned Scientists - D. Wright, issued December 3,2012, Response to Letter of September 13, 2012 (ADAMS Accession No. ML123394322)

Licens ee D ocuments (Publiely Available)  :

13. Management Meeting of April 23, 2Q1A, NextEra/Consultant Slides (ADAMS Accession Nos. ML121160349, ML121160414, and ML121160422)
14. NextEra letters, dated May 3, 2012, "Actions for Resolution of Alkali Silica Reaction (ASR) lssues" and, dated May 1 0, 2012, "Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) lssues," (ADAMS Accession Nos. M112125A022 and M1121314479, respectively)
15. NextEra Letter of May 24,2012, Letter and Enclosure 1 for CAL ltem 5, "Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012" (ADAMS Accession No. M1121514396)
16. NextEra Letter of May 24, 2012, Enclosure 2 tor CAL ltem 3, "Submit the evaluation, 'lmpact of ASR on Concrete Structures and Attachments' by May 25,2012" (Foreign Print 100716) by May 25,2012 (ADAMs Accession No. M112151A397)
17. NextEra Letter of June 8,2012, for CAL ltem 4, "Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the effects of ASR, where warranted, by June 8, 2012" (ADAMS Accession No. M112171A277)
18. NextEra Letter of June 21, 2012, for CAL ltem 8, "Submit the technical details of the testing planned at the contracted research and development facility by June 30,2012" (ADAMS Accession No. ML12179A281 and ML121794282).

Enclosure 3}}