IR 05000261/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/RGN-II/ORA
| author affiliation = NRC/RGN-II/ORA
| addressee name = Kappopoulos E J
| addressee name = Kappopoulos E
| addressee affiliation = Duke Energy Corp
| addressee affiliation = Duke Energy Corp
| docket = 05000261
| docket = 05000261
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 6, 2017 EA-16-227
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION


Mr. Ernest J. Kapopoulos, Jr.
==REGION II==
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 6, 2017 EA-16-227 Mr. Ernest J. Kapopoulos, Jr.


Site Vice President H. B. Robinson Steam Electric Plant  
Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000261/2017405; AND INVESTIGATION REPORT NO. 2-2016-001
 
Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
 
SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000261/2017405; AND INVESTIGATION REPORT NO. 2-2016-001


==Dear Mr. Kapopoulos:==
==Dear Mr. Kapopoulos:==
This refers to an investigation completed on September 30, 2016, by the Nuclear Regulatory Commission's (NRC) Office of Investigations (OI) concerning activities at Duke Energy's H. B. Robinson Steam Electric Plant (Robinson). The purpose of the investigation was to review a security incident that was identified on September 23, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000261/2016404 dated December 27, 2016.
This refers to an investigation completed on September 30, 2016, by the Nuclear Regulatory Commissions (NRC) Office of Investigations (OI) concerning activities at Duke Energys H. B. Robinson Steam Electric Plant (Robinson). The purpose of the investigation was to review a security incident that was identified on September 23, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000261/2016404 dated December 27, 2016.


In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.
In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.
Line 38: Line 35:
As documented in your written response, you accepted the violation and facts as described in the inspection report, acknowledged the significance of the issue and the need for lasting and effective corrective actions, and provided details of your corrective actions to preclude recurrence.
As documented in your written response, you accepted the violation and facts as described in the inspection report, acknowledged the significance of the issue and the need for lasting and effective corrective actions, and provided details of your corrective actions to preclude recurrence.


Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the  
Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred.
 
The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the circumstances surrounding it are described in detail in the subject NRC Inspection Report.


circumstances surrounding it are described in detail in the subject NRC Inspection Report. Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRC's conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000261/2017405.
Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRCs conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000261/2017405.


Accordingly, the AV documented in NRC Inspection Report 05000261/2016404 is designated as VIO 05000261/2017405-001.
Accordingly, the AV documented in NRC Inspection Report 05000261/2016404 is designated as VIO 05000261/2017405-001.


The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in Duke Energy's written response dated January 24, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accura tely reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in Duke Energys written response dated January 24, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
 
This cover letter will be made available for public inspection in the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


This cover letter will be made available for public inspection in the NRC's Agencywide Documents Access and Managemen t System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.


The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this letter, please contact me at 404-997-4600.
Should you have any questions concerning this letter, please contact me at 404-997-4600.


Sincerely,
Sincerely,
/RA/ Catherine Haney Regional Administrator  
/RA/
 
Catherine Haney Regional Administrator Docket No. 50-261 License No. DPR-23 Enclosures:
Docket No. 50-261 License No. DPR-23 Enclosures:
1. Notice of Violation 2. Severity Level and Civil Penalty Assessment cc: (See page 3) cc:
1. Notice of Violation 2. Severity Level and Civil Penalty  
Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550 Edward T. ONeil, General Manager Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS-PSB2 RII:DRS RII:EICS RII:EICS RII;DRS RII:ORA RII:ORA SIGNATURE JOB2 * BBD * MXK7 SAP1 VIA ATG * LXW1 CXH EMAIL *
 
NAME JBROWN BDESAI MKOWAL SPRICE AGODY LWERT CHANEY DATE 1/25/2017 1/27/2017 2/3/2017 1/26/2017 1/30/2017 2/6/2017 2/6/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OE OGC NSIR NRR SIGNATURE DXF4 VIA DDS1 VIA AXR2 VIA LRC1 VIA EMAIL EMAIL EMAIL EMAIL NAME DFURST DSTRAUS ARICHARDSON LCASEY DATE 2/2/2017 2/1/2017 1/31/2017 2/1/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Assessment cc: (See page 3) cc: Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02  
 
Hartsville, South Carolina 29550  
 
Edward T. O'Neil, General Manager Nuclear Protective Services Duke Energy Corporation  
 
526 South Church Street, Phase II, EC5ZD  
 
Charlotte, NC 28202  
 
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS-PSB2 RII:DRS RII:EICS RII:EICS RII;DRS RII:ORA RII:ORA SIGNATURE JOB2 * BBD * MXK7 SAP1 VIA EMAIL * ATG * LXW1 CXH NAME JBROWN BDESAI MKOWAL SPRICE AGODY LWERT CHANEY DATE 1/25/2017 1/27/2017 2/3/2017 1/26/2017 1/30/2017 2/6/2017 2/6/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OE OGC NSIR NRR SIGNATURE DXF4 VIA EMAIL DDS1 VIA EMAIL AXR2 VIA EMAIL LRC1 VIA EMAIL NAME DFURST DSTRAUS ARICHARDSONLCASEY DATE 2/2/2017 2/1/2017 1/31/2017 2/1/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 07:42, 30 October 2019

Notice of Violation; NRC Inspection Report No. 05000261/2017405; and Investigation Report No. 2-2016-001 - OUO Information Removed
ML17039B022
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/06/2017
From: Catherine Haney
Region 2 Administrator
To: Kappopoulos E
Duke Energy Corp
References
2-2016-001, EA-16-227 IR 2017405
Download: ML17039B022 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 6, 2017 EA-16-227 Mr. Ernest J. Kapopoulos, Jr.

Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NOTICE OF VIOLATION; NRC INSPECTION REPORT NO. 05000261/2017405; AND INVESTIGATION REPORT NO. 2-2016-001

Dear Mr. Kapopoulos:

This refers to an investigation completed on September 30, 2016, by the Nuclear Regulatory Commissions (NRC) Office of Investigations (OI) concerning activities at Duke Energys H. B. Robinson Steam Electric Plant (Robinson). The purpose of the investigation was to review a security incident that was identified on September 23, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000261/2016404 dated December 27, 2016.

In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.

In a letter dated January 24, 2017, you provided a response to the apparent violation.

As documented in your written response, you accepted the violation and facts as described in the inspection report, acknowledged the significance of the issue and the need for lasting and effective corrective actions, and provided details of your corrective actions to preclude recurrence.

Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the circumstances surrounding it are described in detail in the subject NRC Inspection Report.

Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRCs conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000261/2017405.

Accordingly, the AV documented in NRC Inspection Report 05000261/2016404 is designated as VIO 05000261/2017405-001.

The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in Duke Energys written response dated January 24, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.

This cover letter will be made available for public inspection in the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this letter, please contact me at 404-997-4600.

Sincerely,

/RA/

Catherine Haney Regional Administrator Docket No. 50-261 License No. DPR-23 Enclosures:

1. Notice of Violation 2. Severity Level and Civil Penalty Assessment cc: (See page 3) cc:

Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550 Edward T. ONeil, General Manager Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS-PSB2 RII:DRS RII:EICS RII:EICS RII;DRS RII:ORA RII:ORA SIGNATURE JOB2 * BBD * MXK7 SAP1 VIA ATG * LXW1 CXH EMAIL *

NAME JBROWN BDESAI MKOWAL SPRICE AGODY LWERT CHANEY DATE 1/25/2017 1/27/2017 2/3/2017 1/26/2017 1/30/2017 2/6/2017 2/6/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OE OGC NSIR NRR SIGNATURE DXF4 VIA DDS1 VIA AXR2 VIA LRC1 VIA EMAIL EMAIL EMAIL EMAIL NAME DFURST DSTRAUS ARICHARDSON LCASEY DATE 2/2/2017 2/1/2017 1/31/2017 2/1/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO