IR 05000317/2016006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Dimitriadis A
| author name = Dimitriadis A
| author affiliation = NRC/RGN-I/DRP/PB1
| author affiliation = NRC/RGN-I/DRP/PB1
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:UNITED STATES rch 1, 2017
-2713 March 1, 2017 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2016 006 AND 05000318/2016 006)
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2016006 AND 05000318/2016006)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
The U.S. Nuclear Regulatory Commission (
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
NRC) has completed its end
-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2
, reviewing performance indicators (PIs)
, inspection results
, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


The NRC determined the performance at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
The NRC determined the performance at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program,"
because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


This inspection plan does not include the plan for security
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
-related inspections, which will be sent via separate, non
-publicly available correspondence.


In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, "Operation of an ISFSI at Operating Plants"
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants , Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, and Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, at your facility. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
, Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans," and Temporary Instruction 2515/192, "Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems
," at your facility. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice,
" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 610-337-6953 with any questions you have regarding this letter.
Please contact me at 610-337-6953 with any questions you have regarding this letter.


Sincerely,/RA/
Sincerely,
Anthony Dimitriadis, Chief Projects Branch 1 Division of Reactor Projects Docket Nos.
/RA/
Anthony Dimitriadis, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure:
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plan


50-317 and 50
ML17058A364 Non-Sensitive Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook ADimitriadis DATE 2/27/17 2/24/17
-318 License Nos.
 
DPR-53 and DPR
-69
 
===Enclosure:===
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plan SUBJECT: ANNUAL ASSESSMENT LETTTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2016006 AND 05000318/2016006)
DATED MARCH 1, 2017 DISTRIBUTION
: DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS ADimitriadis, DRP ARosebrook, DRP ASiwy, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RMcKinley, DRS WCook, DRS MGray, DRS GDentel, DRS DJackson, DRS DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1
-1 Resource ROPReports Resource ROPAssessment Resource RidsNrrDirslpabResources
 
DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-17 EOC Review
\Branch 1\Calvert Cliffs
\Calvert Cliffs 2016 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER: ML17058A364 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook ADimitriadis DATE 2/27/17 2/24/17 OFFICIAL RECORD CO PY
}}
}}

Latest revision as of 07:36, 30 October 2019

Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2016006 and 05000318/2016006)
ML17058A364
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/01/2017
From: Anthony Dimitriadis
Reactor Projects Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2016006
Download: ML17058A364 (5)


Text

UNITED STATES rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2016006 AND 05000318/2016006)

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants , Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, and Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, at your facility. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-6953 with any questions you have regarding this letter.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure:

Calvert Cliffs Nuclear Power Plant Inspection/Activity Plan

ML17058A364 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook ADimitriadis DATE 2/27/17 2/24/17