ML17244A291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/21/1978
| issue date = 12/21/1978
| title = Ack Receipt of 781115 Ltr from NRC Providing Rge W/Rev Standard Tech Specs Re Radiological Effluents.Due to Delay in Receipt of Ltr & to Provide Time for Reviews,Rge Plans to Submit Proposed Tech Specs by 780215(sic)
| title = Ack Receipt of 781115 Ltr from NRC Providing Rge W/Rev Standard Tech Specs Re Radiological Effluents.Due to Delay in Receipt of Ltr & to Provide Time for Reviews,Rge Plans to Submit Proposed Tech Specs by 780215(sic)
| author name = WHITE L D
| author name = White L
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = ZIEMANN D L
| addressee name = Ziemann D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:00BEGULATI))OINFOBMATIONDISTBIBUTION'TEM(BIDS)DOCKET¹05000244BECIPIENTIDCODE/NAMECOPIESLTTRENCLACCESSIONNBB:7812290090DOC.DATE-78/12/21NOTARIZED:NOFAC,IL:50-244GINNA,ROCHESTERGAS8,ELECTRICCOBPOBATI,ONAUTH.NAMEAUTHORAFFILIATIONWHITE.L.D.ROCHESTERGAS8ELECRECI,P'NAMEBECIPIF.NTAFFILIATI()NZIEMANN,D.L.***OPERATINGREACTORSBRANCH2
{{#Wiki_filter:BEGULATI))OINFOBMATI ON DISTBIBUTION 'TEM                     (BIDS) 0  ACCESS  I ON NBB: 7812290090          DOC. DATE- 78/12/21              NOTA RI ZED: NO          DOCKET  ¹ FAC,IL:50-244 GINNA, ROCHESTER GAS 8, ELECTRIC                    COBPOBATI,ON                05000244 AUTH. NAME            AUTHOR AFFILIATION 0  WHITE.L.D.             ROCHESTER GAS 8 ELEC RECI,P'NAME            BEC IP IF.NT AFF ILI ATI ()N ZIEMANN,D.L.           ***OPERATING REACTORS BRANCH 2


==SUBJECT:==
==SUBJECT:==
Ackreceiptof781115ltrfromNRCprovidingBGEw/revStandardTechSpecsreradiologicaleffluents.Duetodelayinreceiptofltr.8,toprovidetimeforreviews,BGEplanstosubmitproposedTechSpecshy780215(sic).DISTRIBUTIONCODE:C004ECOPIESRECEIVED:LTRgENCLQSIZE:~TITLE:CHANGEBEQUESTSFORENVIRON.TECHSPECS(APPENDB).NOTES:/Q+6<NITL~dNdN2'>+8~//RECIPIENTIDCODE/NAME-ACTION:05BCE~8~~INTERNAL~0.1REGFILE1013OFLD15QAB17ENVNSPECBRADSITEANALYSDIRECTORDSEEXTERNAL-03LPDB19NATLLABd/kI11302NRCPDR11I8E14EDO8,STAFF16EEB18BADASMTBBADSYS/PROJ04NSIC22ACRS11161l.k)"WEisa'HuT648~aBd.33GHANAdgBwgz$OECSS>>780~T()TALNUMBEROFCO.PIESREQUIRED-LTTB40ENCL 0iIt'1F4II~4hP4' December21,1978DirectorofNuclearReactorRegulationATTN:Mr.DennisL.Ziemann,ChiefOperatingReactorsBranchNo.2U.S.NuclearRegulatoryCommissionWashington,D.C.20555
Ack        receipt of 781115      ltr  from NRC providing BGE w/rev Standard Tech Specs re radiological effluents.Due to delay in receipt of ltr. 8, to provide time for reviews,BGE plans to submit proposed Tech Specs hy 780215(sic) .
DISTR I BUT ION    CODE: C004E TITLE:
COPIES RECEI VED: LTR CHANGE BEQUESTS FOR ENVIRON. TECH SPECS g  ENCL  Q    SIZE:  ~
(APPEND  B).
NOTES:   /   Q     +6< NITL ~d        N dN  2'>+8~//
RECIPIENT                                    BEC I PI ENT          COP I ES ID CODE/NAME-                               ID CODE/NAME          LTTR ENCL ACTION:       05  BC  E~8~ ~
I  NTERNAL~     0.1  REG  FILE                              02 NRC PDR 10                                          11  I8E 13 OFLD                                      14 EDO 8, STAFF 15 QAB                                      16 EEB 17 ENVN SPEC BR                              18 BAD ASMT BB AD SITE ANALYS                              AD SYS/PROJ DI RECTOR DSE EXTERNAL- 03 LPDB                      1      1          04 NS IC                    1      1 19 NATL LAB  d/kI      3                  22 ACRS                    16    1 l.k)"
W Eisa'HuT 648 ~a Bd.
3 3 GHANA dgBwgz $
OEC  SS>>78 0
T()TAL NUMBER OF CO.PIES REQUIRED- LTTB                  40
~                                                                  ENCL
 
0 iI
                        '1 t
F 4
II~
4 h
P 4'
 
December 21, 1978 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis L. Ziemann, Chief Operating Reactors Branch No. 2 U. S. Nuclear Regulatory Commission Washington, D. C. 20555


==Subject:==
==Subject:==
RadiologicalEffluentTechnicalSpecificationsR.E.GinnaNuclearPowerPlantDocketNo.50-244
Radiological Effluent Technical Specifications R. E. Ginna Nuclear Power Plant Docket No. 50-244


==DearMr.Ziemann:==
==Dear Mr. Ziemann:==
ThisletteracknowledgesreceiptonDecember19,1978ofyourletterdatedNovember15,1978.YourletterprovidesuswithrevisedStandardTechnicalSpecificationsforradiologicaleffluentsandwithguidanceonanalysisnecessarytosupporttheseTechnicalSpecifica-tions.ItasksustosubmitproposedTechnicalSpecificationswithin60daysofthedateofyourletter.BasedonconversationswithmembersoftheNRCStaff,itappearsthattheoriginalletterwaseithernotsenttousorwaslostinthemails,andanadditionalmailingwasmadeinmidDecember.Becauseofthedelayinreceiptofyourletter,andtoprovidetimeforcompany'eviewsrequiredbyTechnicalSpecifications,weplantosubmitourproposedTechnicalSpecificationsbyFebruary15,1978.Verytrulyyours,qgyp2900RoPEHHLAT08YBOCY<TF,'!.FCOPY.o<
 
t~~l'fJ'\  
This letter acknowledges receipt on December 19, 1978 of your letter dated November 15, 1978. Your letter provides us with revised Standard Technical Specifications for radiological effluents and with guidance on analysis necessary to support these Technical Specifica-tions. It asks us to submit proposed Technical Specifications within 60 days of the date of your letter.
}}
Based on conversations with members of the NRC Staff, it appears that the original letter was either not sent to us or was lost in the mails, and an additional mailing was made in mid December. Because of the delay in receipt of your letter, and to provide time for company'eviews required by Technical Specifications, we plan to submit our proposed Technical Specifications by February 15, 1978.
Very truly yours, PEHHLAT08Y BOCY<T F,'!.F COPY                  .o   <
q  gyp 2900Ro
 
t ~ ~
l'f J
            '\}}

Latest revision as of 21:13, 29 October 2019

Ack Receipt of 781115 Ltr from NRC Providing Rge W/Rev Standard Tech Specs Re Radiological Effluents.Due to Delay in Receipt of Ltr & to Provide Time for Reviews,Rge Plans to Submit Proposed Tech Specs by 780215(sic)
ML17244A291
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/21/1978
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7812290090
Download: ML17244A291 (4)


Text

BEGULATI))OINFOBMATI ON DISTBIBUTION 'TEM (BIDS) 0 ACCESS I ON NBB: 7812290090 DOC. DATE- 78/12/21 NOTA RI ZED: NO DOCKET ¹ FAC,IL:50-244 GINNA, ROCHESTER GAS 8, ELECTRIC COBPOBATI,ON 05000244 AUTH. NAME AUTHOR AFFILIATION 0 WHITE.L.D. ROCHESTER GAS 8 ELEC RECI,P'NAME BEC IP IF.NT AFF ILI ATI ()N ZIEMANN,D.L. ***OPERATING REACTORS BRANCH 2

SUBJECT:

Ack receipt of 781115 ltr from NRC providing BGE w/rev Standard Tech Specs re radiological effluents.Due to delay in receipt of ltr. 8, to provide time for reviews,BGE plans to submit proposed Tech Specs hy 780215(sic) .

DISTR I BUT ION CODE: C004E TITLE:

COPIES RECEI VED: LTR CHANGE BEQUESTS FOR ENVIRON. TECH SPECS g ENCL Q SIZE: ~

(APPEND B).

NOTES: / Q +6< NITL ~d N dN 2'>+8~//

RECIPIENT BEC I PI ENT COP I ES ID CODE/NAME- ID CODE/NAME LTTR ENCL ACTION: 05 BC E~8~ ~

I NTERNAL~ 0.1 REG FILE 02 NRC PDR 10 11 I8E 13 OFLD 14 EDO 8, STAFF 15 QAB 16 EEB 17 ENVN SPEC BR 18 BAD ASMT BB AD SITE ANALYS AD SYS/PROJ DI RECTOR DSE EXTERNAL- 03 LPDB 1 1 04 NS IC 1 1 19 NATL LAB d/kI 3 22 ACRS 16 1 l.k)"

W Eisa'HuT 648 ~a Bd.

3 3 GHANA dgBwgz $

OEC SS>>78 0

T()TAL NUMBER OF CO.PIES REQUIRED- LTTB 40

~ ENCL

0 iI

'1 t

F 4

II~

4 h

P 4'

December 21, 1978 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis L. Ziemann, Chief Operating Reactors Branch No. 2 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Radiological Effluent Technical Specifications R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

This letter acknowledges receipt on December 19, 1978 of your letter dated November 15, 1978. Your letter provides us with revised Standard Technical Specifications for radiological effluents and with guidance on analysis necessary to support these Technical Specifica-tions. It asks us to submit proposed Technical Specifications within 60 days of the date of your letter.

Based on conversations with members of the NRC Staff, it appears that the original letter was either not sent to us or was lost in the mails, and an additional mailing was made in mid December. Because of the delay in receipt of your letter, and to provide time for company'eviews required by Technical Specifications, we plan to submit our proposed Technical Specifications by February 15, 1978.

Very truly yours, PEHHLAT08Y BOCY<T F,'!.F COPY .o <

q gyp 2900Ro

t ~ ~

l'f J

'\