ML17244A750: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/07/1979
| issue date = 08/07/1979
| title = Forwards LER 79-015/01T-0
| title = Forwards LER 79-015/01T-0
| author name = WHITE L D
| author name = White L
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:gj,/i)ZW(P(~iiiPiluZARPl/"jfj/Nl/II///j1Z/(/IZ&#xc3;ill)7Id/t!l~(S!urn/!'!superi,nuROCHESTERGASANDELECTRICCORPORATIONtTO<<<<II<<'I<<~89EASTAVENUE,ROCHESTER,N.Y.14649LEOND.WHITE,JR.VICCPRESIDCNTTCL<<PHONEARCACODC7ld546-2700August7,1979Mr.BoyceH.Grier,DirectorU.S.NuclearRegulatoryCommissionOfficeofInspectionandEnforcementRegionI631ParkAvenueKingofPrussia,Pennsylvania19406
{{#Wiki_filter:gj,/i)ZW "jfj ARP (P(~iiiPiluZ l/
        /Nl/II///j1Z/(/IZ&#xc3;ill)7I t                      TO<<<<
II<<'I<<
d/t!l~(S!urn/ !'!superi,nu ROCHESTER GAS AND ELECTRIC CORPORATION                        ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.                                                                         TCL<<PHONE VICC PRESIDCNT                                                              ARCA CODC 7ld 546-2700 August 7, 1979 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania                  19406


==Subject:==
==Subject:==
LER79-015/01T-O,NonconformingPipeSupportsIdentifiedduringResponsetoIEBulletin79-14R.E.GinnaNuclearPowerPlant,UnitNo.1DocketNo.50-244
LER  79-015/01T-O, Nonconforming Pipe Supports Identified during Response to IE Bulletin 79-14 R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244


==DearMr.Grier:==
==Dear Mr. Grier:==
InaccordancewithTechnicalSpecifications,Article6.9.2.a(9)(discoveryduringplantlifeofconditionsnotspecificallyconsideredinthesafetyanalysisreportortechnicalspecificationsthatrequireremedialactionorcorrectivemeasurestopreventtheexistenceordevelopmentofanunsafecondition),LicenseeEventReportLER79-015/01T-0wassub-mittedinconjunctionwithour30dayresponsetoIEBulletin79-14,SeismicAnalysesforAs-builtSafetyRelatedPipingSystems.Thetworequiredaddi-tionalcopiesofthereportareattached.Verytrulyyours,L.D.Whe,Jr.Attachmentcc:Mr.VictorStello,Jr.(40)Mr.NormanR.Hailer(3) i'f,}}
 
In accordance with Technical Specifications, Article 6.9.2.a(9)
(discovery during plant life of conditions not specifically considered in the safety analysis report or technical specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition), Licensee Event Report LER 79-015/01T-0 was sub-mitted in conjunction with our 30 day response to IE Bulletin 79-14, Seismic Analyses for As-built Safety Related Piping Systems. The two required addi-tional copies of the report are attached.
Very truly yours, L. D. Wh e, Jr.
Attachment cc: Mr. Victor Stello, Jr. (40)
Mr. Norman R. Hailer         (3)
 
i'f,}}

Latest revision as of 21:09, 29 October 2019

Forwards LER 79-015/01T-0
ML17244A750
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/07/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A751 List:
References
NUDOCS 7908100471
Download: ML17244A750 (2)


Text

gj,/i)ZW "jfj ARP (P(~iiiPiluZ l/

/Nl/II///j1Z/(/IZÃill)7I t TO<<<<

II<<'I<<

d/t!l~(S!urn/ !'!superi,nu ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TCL<<PHONE VICC PRESIDCNT ARCA CODC 7ld 546-2700 August 7, 1979 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

LER 79-015/01T-O, Nonconforming Pipe Supports Identified during Response to IE Bulletin 79-14 R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. Grier:

In accordance with Technical Specifications, Article 6.9.2.a(9)

(discovery during plant life of conditions not specifically considered in the safety analysis report or technical specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition), Licensee Event Report LER 79-015/01T-0 was sub-mitted in conjunction with our 30 day response to IE Bulletin 79-14, Seismic Analyses for As-built Safety Related Piping Systems. The two required addi-tional copies of the report are attached.

Very truly yours, L. D. Wh e, Jr.

Attachment cc: Mr. Victor Stello, Jr. (40)

Mr. Norman R. Hailer (3)

i'f,