LER 79-015/01T-0 on 790724:discovered Pipe Supports Not Meeting Design Specs of IE Bulletin 79-14.Caused by Lack of Documented Approvals for Field Changes & Nonconformance During Plant Const.Supports Reworked
ML17261A134
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/01/1979
From: Hutton J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A751 List:
References
LER-79-015-01T, LER-79-15-1T, NUDOCS 7908100475
Download: ML17261A134 (4)


Text

I ENRC +ORM 366 U. S. NUCLEAR REGULATORY COMMISSION fl.77)

NSEE EVENT REPORT (CAR 1230)

.CONTROL BLOCK: {PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 8

N Y LICENSEE CODE 14 mpp15 I.ICENSE NUMBER 0>

26 LICENSE TYPE 30 Q4~57 CAT 58 QS T

I~e 7

s 8

REPORT

~Q 60 61 DOCKET NUMBER 68 7 0 69 EVENT DATE 74 8

75 08 pl REPORT DATE 7

80 Qg FVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO Durin i in s stem ins ections

,~s 3 several i e su orts we in accordance

~s 4 with desi n re uirem n s

,:~DS

,:.~D6

,'~O

foDs]

7 8 9 BD SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE g ~BB Q11 B QE2

~COPS 5 0 P 0 R T 04 ~BOER ~B QS 7 8 9 10 11 12 13 18 19 20 SEOUEN TIAL OCCURRENCE REPORT REVISION QTT LERIRO REPoRT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

~23 SHUTDOWN

~01 24 REPORT NO.

5 26

~M 27

~01 28 ATTACHMENT CODE 29 NPRDP TYPE

~T 30

~

31 PRIME COMP.

NO,

~0 32 COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q2 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER LJtIPES~BGS ~BOER LSIP>> 0 0 0 0 ~YP23 ~NQ24 ~AORS . B I 3 0 Q24 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Lack of documented a rovals for field chan es and nonconforma c s durin ori inal lant construction. Su orts hav or an engineerin evaluation erformed to establish acce tabilit

~O 8 9 80 FACILITY STATUS  % POWER OTHER STATUS Q METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32 CZ3 I S MO G 28 P P P 29 ~Q31 45 46 IE Bulletin 79-14 Xns ections 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Q 6 ~Z Q33 ~ZQ34 NA 7 8 9 10 44 45 80 PER SONNE L E XPOSUR ES NUMBER TYPE DESCRIPTION Q39 2 ~00 0 OET ~2Q33 NA 7 8 9 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 7 8 I0000 9 11 JQ43 12 NA 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION Q43 Z Q4. NA 7 8 9 ID BD ISSUED

~NQ44 PUBLICITY DESCRIPTION ~ NA NRC USE ONLY

~

7 8 9 10 69 80 Es

'8 NAME OF PREPARER J.C. Hutton PHoNE.716-546-2700,Ext EP+

25p2,'S08100$

Attachment LER 79-015 Au ust 1 1979 During the piping sytem inspections required by lE Bulletin No. 79-14, 10 pipe supports were determined to be, in nonconformance .

with design requirements. These supports were located on the containment spray (CS), residual heat removal (RHR), and service water {Sf) systems.

The following is a listing of the supports and nonconfozmances (NCR's G-79-88 through G-79-93 and G-79.-95 through G-79-97):

CS-53, one less support installed on lower containment spray ring than shown on drawing CS-235 pipe clamp not installed on lower containment spray zing at 235 location as shown on drawing CS-295 pipe clamp not installed on lower containment spray zing at 295 location as shown on drawing CS-12 U-bolt not installed as zequired by drawing RH-16 pipe clamp not installed as required by drawing 1

K7-3 pipe support not installed at location required by drawing SW-20 six U-bolts not installed as required by drawing SM-22 four U-bolts not installed as required by drawing K'I-23 pipe clamp not installed as required by drawing SH-29 pipe support not installed at location required by dramng Supports CS-235, CS-295, CS-12, IN-16, M-3, &7-22, SH-23, and SW-29 have been reworked in accordance with the drawing requirements. An engineering evaluation of the nonconformance identified on CS-53 determined that the existing installation was adequate to assure performance of its intended function. Rein-spection of support SH-20 showed that the nonconformance had been incorrectly reported; and it was in fact installed correctly.

The corrective actions described above have been completed.

Xt is our conclusion that the nonconformances are a result of a lack of documented approvals for field changes and nonconformances during original plant construction. Additional inspections as required by lE Bulletin No. 79-14 are being performed as described in our response dated August 1, 1979.

e I

s < ~ ~ 1

'I