{{#Wiki_filter:AC CELE RATED DlSIIBUTl ON DE M 04 STRPOA SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8903130193 DOC.DATE: 89/02/07 NOTARIZED:
{{#Wiki_filter:AC CELE RATED         DlSIIBUTl     ON     DE M 04 STRPOA           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION t MECREDY,R.C.
ACCESSION NBR:8903130193         DOC.DATE: 89/02/07     NOTARIZED: NO           DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester             G 05000244 AUTH. NAME           AUTHOR AFFILIATION                                 t MECREDY,R.C.         Rochester Gas 6 Electric Corp.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
RECIP.NAME           RECIPIENT AFFILIATION RUSSELL,W.T.         Region 1, Ofc of the Director
Region 1, Ofc of the Director  


==SUBJECT:==
==SUBJECT:==
Discusses addi requirements util placed on operability of turbine driven auxiliary feedwater pump,per request.DISTRIBUTION CODE: IE01D COPIES RECEIVED LTR ENCL SIZE: TITLE: General (50.Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Discusses addi requirements util placed on operability             of turbine driven auxiliary feedwater pump,per request.
DOCKET 05000244 05000244~RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN1 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME STAHLE,C AEOD/DEIIB E NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS ILRB12 0 N,J EG FILE 02 NRC PDR COPIES LTTR ENCL R I S A NOZK'lO ALL"RIES" RECIPIENIS PLEASE HELP US 1Q REDUCE WASTE!CDNI'ACr'THE DOCVMENZ CONSOL DESK BOOM P1-37 (EXT.20079)KO ELZMZNATE WAR NME FRY DZSTfUBUTIGN LXSTS FOR DOCUMENTS YOU DClN'T NEZDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL~
DISTRIBUTION CODE: IE01D COPIES RECEIVED LTR               ENCL     SIZE:
ROCHESTER GAS AND I gg~I vol~/700K sf+tc ELECTRIC CORPORATION
TITLE: General (50.Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).           05000244 ~
~89 EAST AVENUE, ROCHESTER, N.Y.14649.0001 f.g 1 kL C P H 0 N C Aec*coos vie 546-2700 February 7, 1989 Mr.William T, Russell Regional Administrator U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406  
RECIPIENT            COPIES            RECIPIENT         COPIES ID   CODE/NAME       LTTR ENCL         ID CODE/NAME       LTTR ENCL PD1-3 PD                              STAHLE,C INTERNAL: AEOD                                  AEOD/DEIIB       E DEDRO                                NRR SHANKMAN,S NRR/DEST DIR                          NRR/DLPQ/PEB 11 NRR/DLPQ/QAB 10                      NRR/DOEA DIR 11 NRR/DREP/EPB 10                      NRR/DREP/RPB 10 NRR/DRIS DIR 9A                      NRR/PMAS ILRB12 NUDOCS-ABSTRACT                      0             N,J OGC/HDS2                                EG FILE     02 RGN1    FILE    01 EXTERNAL: LPDR                                  NRC PDR NSIC R
I S
A NOZK 'lO ALL "RIES" RECIPIENIS PLEASE HELP US 1Q REDUCE WASTE! CDNI'ACr 'THE DOCVMENZ CONSOL DESK BOOM P1-37 (EXT. 20079) KO ELZMZNATE WAR NME FRY DZSTfUBUTIGN
                                                            ~
LXSTS FOR DOCUMENTS YOU DClN'T NEZDt TOTAL NUMBER OF COPIES REQUIRED: LTTR           23   ENCL
 
I gg ~
I vol ~
                                                                                      /             700K sf+tc ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001
: f. g 1 kL C P H 0 N C Aec* coos vie     546-2700 February 7, 1989 Mr. William T, Russell Regional Administrator U. S. Nuclear Regulatory Commission Region   I 475 Allendale Road King of Prussia, Pennsylvania 19406


==Subject:==
==Subject:==
Turbine Driven Auxiliary Feedwater Requirements R.E.Ginna Nuclear Power Plant Docket No.50-244 Pump Operability
Turbine Driven Auxiliary Feedwater               Pump      Operability Requirements R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Russell:==


==Dear Mr.Russell:==
This   letter responds to a request, from your Staff that we document the     additional requirements that we have placed on the operability of the Turbine Driven Auxiliary Feedwater Pump (TDAFP). Ginna Procedure A-52.4 has been revised to state:                                 "In accordance with Technical Specification 3.4.1(c) and 3 '.2(b'~,
This letter responds to a request, from your Staff that we document the additional requirements that we have placed on the operability of the Turbine Driven Auxiliary Feedwater Pump (TDAFP).Ginna Procedure A-52.4 has been revised to state: "In accordance with Technical Specification 3.4.1(c)and 3'.2(b'~, the following is provided as additional administrative requirements to clarify operability.
the following is provided as additional administrative requirements to clarify operability. In order for the TDAFWP to be considered operable, at least 1/2 feedwater flowpaths to either Steam Generator and 1/2 steam supply paths from either steam generator must be operable (including valves and piping). If the TDAFWP or both feedwater flowpaths or both steam supply paths are inoperable, restore within 7 days or be in HSD within the next 6 hours and at an RCS Temperature < 350 F within the following 6 hours".
In order for the TDAFWP to be considered operable, at least 1/2 feedwater flowpaths to either Steam Generator and 1/2 steam supply paths from either steam generator must be operable (including valves and piping).If the TDAFWP or both feedwater flowpaths or both steam supply paths are inoperable, restore within 7 days or be in HSD within the next 6 hours and at an RCS Temperature
In addition, the operators have been provided with the additional guidance that, for compliance with Technical Specifi-cation 3.4.2(c), both TDAFP steam supply systems and both TDAFP feedwater flowpaths must be operable.
<350 F within the following 6 hours".In addition, the operators have been provided with the additional guidance that, for compliance with Technical Specifi-cation 3.4.2(c), both TDAFP steam supply systems and both TDAFP feedwater flowpaths must be operable.We are preparing a proposed Technical Specification change to incorporate additional requirements for the TDAFP system.It should be noted that-the, proposed changes may differ from our current interim requirements.
We are preparing a proposed Technical Specification change to incorporate additional requirements for the TDAFP system. It should be noted that -the, proposed changes may differ from our current interim requirements.
Very truly yours, R.C.M ed General Manager Nuclear Production xc: Ginna Senior Resident Inspector 85'0 l80193 85"0207 PDR ADGCK 0 080244 F''DC i)p t~}}
Very   truly yours, R. C. M   ed General Manager Nuclear Production xc:   Ginna Senior Resident Inspector i)p F''DC 85'0 PDR l80193 85"0207 ADGCK 0 080244                                                                             t ~}}

Latest revision as of 18:52, 29 October 2019

Discusses Addl Requirements Util Placed on Operability of Turbine Driven Auxiliary Feedwater Pump,Per Request. Operators Provided W/Addl Guidance for Compliance W/Tech Spec 3.4.2(c)
ML17261A872
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/07/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8903130193
Download: ML17261A872 (2)


Text

AC CELE RATED DlSIIBUTl ON DE M 04 STRPOA SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903130193 DOC.DATE: 89/02/07 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION t MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T. Region 1, Ofc of the Director

SUBJECT:

Discusses addi requirements util placed on operability of turbine driven auxiliary feedwater pump,per request.

DISTRIBUTION CODE: IE01D COPIES RECEIVED LTR ENCL SIZE:

TITLE: General (50.Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD STAHLE,C INTERNAL: AEOD AEOD/DEIIB E DEDRO NRR SHANKMAN,S NRR/DEST DIR NRR/DLPQ/PEB 11 NRR/DLPQ/QAB 10 NRR/DOEA DIR 11 NRR/DREP/EPB 10 NRR/DREP/RPB 10 NRR/DRIS DIR 9A NRR/PMAS ILRB12 NUDOCS-ABSTRACT 0 N,J OGC/HDS2 EG FILE 02 RGN1 FILE 01 EXTERNAL: LPDR NRC PDR NSIC R

I S

A NOZK 'lO ALL "RIES" RECIPIENIS PLEASE HELP US 1Q REDUCE WASTE! CDNI'ACr 'THE DOCVMENZ CONSOL DESK BOOM P1-37 (EXT. 20079) KO ELZMZNATE WAR NME FRY DZSTfUBUTIGN

~

LXSTS FOR DOCUMENTS YOU DClN'T NEZDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL

I gg ~

I vol ~

/ 700K sf+tc ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001

f. g 1 kL C P H 0 N C Aec* coos vie 546-2700 February 7, 1989 Mr. William T, Russell Regional Administrator U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406

Subject:

Turbine Driven Auxiliary Feedwater Pump Operability Requirements R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Russell:

This letter responds to a request, from your Staff that we document the additional requirements that we have placed on the operability of the Turbine Driven Auxiliary Feedwater Pump (TDAFP). Ginna Procedure A-52.4 has been revised to state: "In accordance with Technical Specification 3.4.1(c) and 3 '.2(b'~,

the following is provided as additional administrative requirements to clarify operability. In order for the TDAFWP to be considered operable, at least 1/2 feedwater flowpaths to either Steam Generator and 1/2 steam supply paths from either steam generator must be operable (including valves and piping). If the TDAFWP or both feedwater flowpaths or both steam supply paths are inoperable, restore within 7 days or be in HSD within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at an RCS Temperature < 350 F within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />".

In addition, the operators have been provided with the additional guidance that, for compliance with Technical Specifi-cation 3.4.2(c), both TDAFP steam supply systems and both TDAFP feedwater flowpaths must be operable.

We are preparing a proposed Technical Specification change to incorporate additional requirements for the TDAFP system. It should be noted that -the, proposed changes may differ from our current interim requirements.

Very truly yours, R. C. M ed General Manager Nuclear Production xc: Ginna Senior Resident Inspector i)p FDC 85'0 PDR l80193 85"0207 ADGCK 0 080244 t ~