Discusses Addl Requirements Util Placed on Operability of Turbine Driven Auxiliary Feedwater Pump,Per Request. Operators Provided W/Addl Guidance for Compliance W/Tech Spec 3.4.2(c)
ML17261A872
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/07/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8903130193
Download: ML17261A872 (2)


Text

AC CELE RATED DlSIIBUTl ON DE M 04 STRPOA SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903130193 DOC.DATE: 89/02/07 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION t MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T. Region 1, Ofc of the Director

SUBJECT:

Discusses addi requirements util placed on operability of turbine driven auxiliary feedwater pump,per request.

DISTRIBUTION CODE: IE01D COPIES RECEIVED LTR ENCL SIZE:

TITLE: General (50.Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD STAHLE,C INTERNAL: AEOD AEOD/DEIIB E DEDRO NRR SHANKMAN,S NRR/DEST DIR NRR/DLPQ/PEB 11 NRR/DLPQ/QAB 10 NRR/DOEA DIR 11 NRR/DREP/EPB 10 NRR/DREP/RPB 10 NRR/DRIS DIR 9A NRR/PMAS ILRB12 NUDOCS-ABSTRACT 0 N,J OGC/HDS2 EG FILE 02 RGN1 FILE 01 EXTERNAL: LPDR NRC PDR NSIC R

I S

A NOZK 'lO ALL "RIES" RECIPIENIS PLEASE HELP US 1Q REDUCE WASTE! CDNI'ACr 'THE DOCVMENZ CONSOL DESK BOOM P1-37 (EXT. 20079) KO ELZMZNATE WAR NME FRY DZSTfUBUTIGN

~

LXSTS FOR DOCUMENTS YOU DClN'T NEZDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL

I gg ~

I vol ~

/ 700K sf+tc ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001

f. g 1 kL C P H 0 N C Aec* coos vie 546-2700 February 7, 1989 Mr. William T, Russell Regional Administrator U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406

Subject:

Turbine Driven Auxiliary Feedwater Pump Operability Requirements R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Russell:

This letter responds to a request, from your Staff that we document the additional requirements that we have placed on the operability of the Turbine Driven Auxiliary Feedwater Pump (TDAFP). Ginna Procedure A-52.4 has been revised to state: "In accordance with Technical Specification 3.4.1(c) and 3 '.2(b'~,

the following is provided as additional administrative requirements to clarify operability. In order for the TDAFWP to be considered operable, at least 1/2 feedwater flowpaths to either Steam Generator and 1/2 steam supply paths from either steam generator must be operable (including valves and piping). If the TDAFWP or both feedwater flowpaths or both steam supply paths are inoperable, restore within 7 days or be in HSD within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at an RCS Temperature < 350 F within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />".

In addition, the operators have been provided with the additional guidance that, for compliance with Technical Specifi-cation 3.4.2(c), both TDAFP steam supply systems and both TDAFP feedwater flowpaths must be operable.

We are preparing a proposed Technical Specification change to incorporate additional requirements for the TDAFP system. It should be noted that -the, proposed changes may differ from our current interim requirements.

Very truly yours, R. C. M ed General Manager Nuclear Production xc: Ginna Senior Resident Inspector i)p FDC 85'0 PDR l80193 85"0207 ADGCK 0 080244 t ~