AC CELE RATED DlSIIBUTl ON DE M04 STRPOA SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903130193 DOC.DATE: 89/02/07 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION t
MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
Region 1, Ofc of the Director
SUBJECT:
Discusses addi requirements util placed on operability of turbine driven auxiliary feedwater pump,per request.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED LTR ENCL SIZE:
TITLE: General (50.Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET 05000244 05000244
~
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN1 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME STAHLE,C AEOD/DEIIB E
NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS ILRB12 0
N,J EG FILE 02 NRC PDR COPIES LTTR ENCL R
I S
A NOZK 'lO ALL "RIES" RECIPIENIS PLEASE HELP US 1Q REDUCE WASTE!
CDNI'ACr 'THE DOCVMENZ CONSOL DESK BOOM P1-37 (EXT. 20079)
KO ELZMZNATE WAR NME FRY DZSTfUBUTIGN LXSTS FOR DOCUMENTS YOU DClN'T NEZDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL~
ROCHESTER GAS AND I
gg ~
I vol ~
/
700K sf+tc ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 f.
g 1 kLC P H0 N C Aec* coos vie 546-2700 February 7,
1989 Mr. William T, Russell Regional Administrator U.
S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406
Subject:
Turbine Driven Auxiliary Feedwater Requirements R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pump Operability
Dear Mr. Russell:
This letter responds to a
- request, from your Staff that we document the additional requirements that we have placed on the operability of the Turbine Driven Auxiliary Feedwater Pump (TDAFP).
Ginna Procedure A-52.4 has been revised to state:
"In accordance with Technical Specification 3.4.1(c) and 3 '.2(b'~,
the following is provided as additional administrative requirements to clarify operability.
In order for the TDAFWP to be considered
- operable, at least 1/2 feedwater flowpaths to either Steam Generator and 1/2 steam supply paths from either steam generator must be operable (including valves and piping). If the TDAFWP or both feedwater flowpaths or both steam supply paths are inoperable, restore within 7 days or be in HSD within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at an RCS Temperature
< 350 F within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />".
In addition, the operators have been provided with the additional guidance that, for compliance with Technical Specifi-cation 3.4.2(c),
both TDAFP steam supply systems and both TDAFP feedwater flowpaths must be operable.
We are preparing a proposed Technical Specification change to incorporate additional requirements for the TDAFP system.
It should be noted that -the, proposed changes may differ from our current interim requirements.
Very truly yours, R.
C.
M ed General Manager Nuclear Production xc:
Ginna Senior Resident Inspector 85'0 l80193 85"0207 PDR ADGCK 0 080244 FDC i)p t
~