| issue date = 10/31/1991
| issue date = 10/31/1991
| title = Monthly Operating Rept for Oct 1991 for Harris Unit 1.W/ 911112 Ltr
| title = Monthly Operating Rept for Oct 1991 for Harris Unit 1.W/ 911112 Ltr
| author name = CRENSHAW A, RICHEY R B
| author name = Crenshaw A, Richey R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9111200311 DOC.DATE: 91/10/31 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
ACCESSION NBR:9111200311             DOC.DATE:   91/10/31   NOTARIZED: NO       DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                 05000400 AUTH. NAME           AUTHOR AFFILIATION CRENSHAW,A.         Carolina Power       &   Light Co.
Carolina Power&Light Co.RICHEY,R.B.
RICHEY,R.B.         Carolina Power       6   Light Co.
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R
R RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Oct 1991 for Harris Unit 1.W/911112 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL~SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.D 05000400 A RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
Monthly operating rept           for Oct 1991   for Harris Unit 1.W/
INTERNAL: ACRS AEOD/DS P/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR DL LPEB10 LE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
911112   ltr.                                                                   D DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL   ~ SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR.24 ENCL 24 A D D A Carolina Power&Light Company NOV J o]99~File Number: SHF/10-15505 Letter Number: HO-913024 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.1 DOCKET NO.50-400 LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.                                       05000400 A
RECIPIENT                COPIES              RECIPIENT       COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL          D PD2-1 LA                     3    3      PD2-1 PD            1    1 MOZAFARI,B.                   1    1                                              D INTERNAL: ACRS                         10    10      AEOD/DOA              1    1 AEOD/DS P/TPAB               1    1      NRR DL    LPEB10    1    1 NRR/DOEA/OEAB                 1    1              LE      01    1    1 RGN2                         1    1 EXTERNAL: EGGG BRYCE,J.H                 1     1     NRC PDR NSIC                          1     1 D
A D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               . 24   ENCL   24


==Dear Sirs:==
A Carolina Power & Light Company NOV J o ]99~
In accordance with Technical Specification 6'.1.5 for the Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1991.Yours very truly, APC:svm Enclosure R.B.Richey Vice President Harris Nuclear Project cc: Mr.S.D.Ebneter (NRC-RII)Mr.R.G.Oehl (DOE)Mr.J.E.Tedrow (NRC-SHNPP) 23.0004 MEM/DATAREP/OS4.
File Number: SHF/10-15505 Letter Number: HO-913024 (0)
9ii1200311 9ii03i.PDR ADGCK 05000400 R-PDR DOCKET NO.: UNIT: DATE: COMPLETED BY: 050-400 Harris Unit 1 October 1991 Amanda Crenshaw OPERATIONS
Document Control Desk United States Nuclear Regulatory Commission Washington,  DC  20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
 
==Dear Sirs:==
 
In accordance with Technical Specification 6 '.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1991.
Yours very truly, R. B. Richey Vice President Harris Nuclear Project APC:svm Enclosure cc: Mr. S. D. Ebneter (NRC-RII)
Mr. R. G. Oehl (DOE)
Mr. J. E. Tedrow (NRC-SHNPP) 23.0004 MEM/DATAREP/OS4.
9ii1200311 9ii03i.
PDR R-ADGCK   05000400 PDR
 
DOCKET NO.:           050-400 UNIT:            Harris Unit 1 DATE:            October 1991 COMPLETED BY:  Amanda Crenshaw OPERATIONS  


==SUMMARY==
==SUMMARY==
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 99.07 percent Capacity Factor.There was one event.Details are provided on the Unit Shutdowns and Power Reduction Sheets.There are, 157 fuel assemblies in the reactor vessel, 647 spent fuel assemblies stored in the Spent Fuel Pools.413 of the spent fuel a'ssemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.70 of the spent fuel assemblies are from CP&L's Robinson Plant.MEM/DATAREP/1/OS4


CPhL CO RUN DATE 1</12/91 RUN TIME18: 22: 86 Pl NT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE RPD36-008 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2888 UNIT NAME: HARRIS UNIT 1 NOTES 2.REPORTING PERIOD: OCTOBER 91 I 3.LICENSED THERMAL POWER (MWT): 2775 i See Operations Summary.4.NAMEPLATE RATING (GROSS MWE): 950.9 I 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0)6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.8 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: none 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): none 38.REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL)3.REACTOR RESERVE SHUTDOWN HRS 34.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN.(MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS BCHED.OVER NEXT 6 MONTHS 745.00 745.00.00 745.00.00 2080843.82 676274.00 634727.00 388.88 108.88 99.87 94.66.00 (TYPE, DATEI 7296.80 5677.9f.00 5617.75.00 14978653.82 5813623.88 4670266.00 77.00 77.80 74.43 71 F 12.99 AND DURATION 39457.80 31524.00.80 31890.10.00 82033897.32 27265557.00 25347436.00 78.79 78.79 74.70 71.38 4.03 OF EACH): none 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 99.07 percent Capacity Factor. There was one event. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
FORECAST ACHIEVED INITIAL CRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREP/2/OS4 1.16-9 1'lr CPbL CO P~NT PERFORMANCE DATA SYSTEH'UN DATE 33/$2/9<APPE~B-AVERAGE DAILY POWER LEVE~RUN TINE10:22:03 HARRIS UNIT PAGE RPD39-000 OCTOBER 1991 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG.DAILY POWER LEVEL (AWE-NET)876 873 875 854 17 20 886 884 881 887 203 710 881 882 22 880 875 877 875 30 880 881 881 885 884 878 885 28 30 875 876 876 879 884 1.16-8 MEM/DATAREP/3/084 UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
There are, 157 fuel assemblies in the reactor vessel, 647 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel a'ssemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.        70 of the spent fuel assemblies are from CP&L's Robinson Plant.
Harris 11/05/94, i A.P.Crenshad (919)362-2808 REPORT MONTH: October 1991 No.Date T'P e Duration (Hours)R~e a s 0 n Method of Shutting Down Reactor'icensee Event Report&#xb9;System Code 4 Component Code 5 Cause 5 Corrective Action to Prevent Recurrence 91%17-.911004 S 0.0 N/A CB PUMPXX Reduced unit power to 21%to add oil to"B" Reactor Coolant Pump lower oil'eservoir.
MEM/DATAREP/1/OS4
Approximately 3 gallons of oil-were added.While power was reduced, various secondary plant maintenance and a turbine valve test were performed.
 
Unit returned to 100%power at approximately 1600 hours on,10-6-91.
CPhL CO                   Pl  NT PERFORMANCE DATA SYSTEM                      PAGE RUN DATE 1</12/91               OPERATING DATA REPORT                          RPD36-008 RUN TIME18: 22: 86                 HARRIS UNIT   1 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW OPERATING STATUS                                        TELEPHONE   (919)362-2888 UNIT NAME:   HARRIS UNIT 1                       NOTES
F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8r, License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG%161) 5 Exhibit 1-Same Source MEM/DATAREP/4/OS4 0 k~e~N~l~r~k}}
: 2. REPORTING PERIOD: OCTOBER     91               I
: 3. LICENSED THERMAL POWER (MWT): 2775               i See Operations Summary.
: 4. NAMEPLATE RATING (GROSS MWE): 950.9             I
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 )
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.8
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:   none
: 9. POWER LEVEL TO WHICH RESTRICTED     IF ANY (NET MWE):   none
: 38. REASONS FOR RESTRICTION   IF ANY:   N/A THIS         YR TO         CUMUL MONTH          DATE         ATIVE
: 11. HOURS IN REPORTING PERIOD                   745.00          7296.80        39457.80
: 12. NUMBER OF HOURS REACTOR CRITICAL             745.00        5677.9f        31524.00
)3. REACTOR RESERVE SHUTDOWN HRS                     .00              .00            .80
: 34. HOURS GENERATOR ON LINE                     745.00        5617.75        31890.10
: 15. UNIT RESERVE SHUTDOWN HOURS                     .00              .00            .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)         2080843.82    14978653.82    82033897.32
: 17. GROSS ELEC. ENERGY GEN. (MWH)             676274.00      5813623.88    27265557.00
: 18. NET ELEC. ENERGY GENERATED (MWH)         634727.00      4670266.00    25347436.00
: 19. UNIT SERVICE FACTOR                         388.88            77.00          78.79
: 20. UNIT AVAILABILITYFACTOR                      108.88            77.80          78.79
: 21. UNIT CAP. FACTOR (USING MDC NET)             99.87            74.43          74.70
: 22. UNIT CAP. FACTOR (USING DER NET)             94.66            71 F 12        71.38
: 23. UNIT FORCED OUTAGE RATE                         .00              .99            4.03
: 24. SHUTDOWNS BCHED. OVER NEXT 6 MONTHS     (TYPE, DATEI AND DURATION     OF EACH):
none
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16  9 MEM/DATAREP/2/OS4
 
1' lr
 
CPbL CO                   P~NT PERFORMANCE DATA SYSTEH               PAGE
'UN DATE 33/$ 2/9<   APPE~   B AVERAGE DAILY POWER LEVE~         RPD39-000 RUN TINE10:22:03               HARRIS UNIT DOCKET NO. 050-400 COMPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 OCTOBER        1991 DAY  AVG. DAILY POWER LEVEL        DAY AVG. DAILY POWER LEVEL (MWE-NET)                          (AWE-NET) 876                 17            886 873                               884 875                               881 854                 20           887 203 710                 22           880 881                                875 877 882                                875 30             880                               875 881                               876 881                 28            876 885                               879 884                  30            884 878 885 1.16 8 MEM/DATAREP/3/084
 
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:                                 Harris DATE:                       11/05/94, i COMPLETED BY:          A. P. Crenshad TELEPHONE:            (919) 362-2808 REPORT MONTH: October 1991 T'                      R~    Method                                                        Cause  5 Corrective No.       Date           Duration        e       of                      System    Component                      Action to (Hours)         a    Shutting      Event      Code 4    Code 5                    Prevent Recurrence P
e                       s Reactor'icensee Down        Report &#xb9; 0
n 91%17-. 911004     S       0.0                                 N/A         CB       PUMPXX       Reduced unit power to 21% to add oil to "B" Reactor Coolant Pump lower oil Approximately 3 gallons of oil-
                                                                                                                                            'eservoir.
were added. While power was reduced, various secondary plant maintenance and a turbine valve test were performed. Unit returned to 100% power at approximately 1600 hours on,10-6-91.
F: Forced           Reason:                                                Method:                Exhibit G-Instructions S: Scheduled       A-Equipment Failure (Explain)                         1-Manual                for Preparation of Data B-Maintenance or Test                                 2-Manual Scram          Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram      Event Report (LER) File D-Regulatory Restriction                               4-Continued            (NUREG%161)
E-Operator Training 8r, License Examination           5-Reduced Load F-Administrative                                       6-Other                5 G-Operational Error (Explain)                                                 Exhibit 1  - Same Source H-Other (Explain)
MEM/DATAREP/4/OS4
 
0     e  ~
k ~
N ~l
        ~ r~
k}}

Latest revision as of 06:29, 22 October 2019

Monthly Operating Rept for Oct 1991 for Harris Unit 1.W/ 911112 Ltr
ML18010A443
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1991
From: Crenshaw A, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913024-(O), NUDOCS 9111200311
Download: ML18010A443 (9)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9111200311 DOC.DATE: 91/10/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAW,A. Carolina Power & Light Co.

RICHEY,R.B. Carolina Power 6 Light Co.

R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1991 for Harris Unit 1.W/

911112 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL ~ SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 3 3 PD2-1 PD 1 1 MOZAFARI,B. 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR DL LPEB10 1 1 NRR/DOEA/OEAB 1 1 LE 01 1 1 RGN2 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR NSIC 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR . 24 ENCL 24

A Carolina Power & Light Company NOV J o ]99~

File Number: SHF/10-15505 Letter Number: HO-913024 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6 '.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1991.

Yours very truly, R. B. Richey Vice President Harris Nuclear Project APC:svm Enclosure cc: Mr. S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP) 23.0004 MEM/DATAREP/OS4.

9ii1200311 9ii03i.

PDR R-ADGCK 05000400 PDR

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: October 1991 COMPLETED BY: Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 99.07 percent Capacity Factor. There was one event. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are, 157 fuel assemblies in the reactor vessel, 647 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel a'ssemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. 70 of the spent fuel assemblies are from CP&L's Robinson Plant.

MEM/DATAREP/1/OS4

CPhL CO Pl NT PERFORMANCE DATA SYSTEM PAGE RUN DATE 1</12/91 OPERATING DATA REPORT RPD36-008 RUN TIME18: 22: 86 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW OPERATING STATUS TELEPHONE (919)362-2888 UNIT NAME: HARRIS UNIT 1 NOTES

2. REPORTING PERIOD: OCTOBER 91 I
3. LICENSED THERMAL POWER (MWT): 2775 i See Operations Summary.
4. NAMEPLATE RATING (GROSS MWE): 950.9 I
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 )
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.8
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: none
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): none
38. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 745.00 7296.80 39457.80
12. NUMBER OF HOURS REACTOR CRITICAL 745.00 5677.9f 31524.00

)3. REACTOR RESERVE SHUTDOWN HRS .00 .00 .80

34. HOURS GENERATOR ON LINE 745.00 5617.75 31890.10
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2080843.82 14978653.82 82033897.32
17. GROSS ELEC. ENERGY GEN. (MWH) 676274.00 5813623.88 27265557.00
18. NET ELEC. ENERGY GENERATED (MWH) 634727.00 4670266.00 25347436.00
19. UNIT SERVICE FACTOR 388.88 77.00 78.79
20. UNIT AVAILABILITYFACTOR 108.88 77.80 78.79
21. UNIT CAP. FACTOR (USING MDC NET) 99.87 74.43 74.70
22. UNIT CAP. FACTOR (USING DER NET) 94.66 71 F 12 71.38
23. UNIT FORCED OUTAGE RATE .00 .99 4.03
24. SHUTDOWNS BCHED. OVER NEXT 6 MONTHS (TYPE, DATEI AND DURATION OF EACH):

none

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MEM/DATAREP/2/OS4

1' lr

CPbL CO P~NT PERFORMANCE DATA SYSTEH PAGE

'UN DATE 33/$ 2/9< APPE~ B AVERAGE DAILY POWER LEVE~ RPD39-000 RUN TINE10:22:03 HARRIS UNIT DOCKET NO. 050-400 COMPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 OCTOBER 1991 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (AWE-NET) 876 17 886 873 884 875 881 854 20 887 203 710 22 880 881 875 877 882 875 30 880 875 881 876 881 28 876 885 879 884 30 884 878 885 1.16 8 MEM/DATAREP/3/084

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 11/05/94, i COMPLETED BY: A. P. Crenshad TELEPHONE: (919) 362-2808 REPORT MONTH: October 1991 T' R~ Method Cause 5 Corrective No. Date Duration e of System Component Action to (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence P

e s Reactor'icensee Down Report ¹ 0

n 91%17-. 911004 S 0.0 N/A CB PUMPXX Reduced unit power to 21% to add oil to "B" Reactor Coolant Pump lower oil Approximately 3 gallons of oil-

'eservoir.

were added. While power was reduced, various secondary plant maintenance and a turbine valve test were performed. Unit returned to 100% power at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on,10-6-91.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG%161)

E-Operator Training 8r, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

MEM/DATAREP/4/OS4

0 e ~

k ~

N ~l

~ r~

k