ML18030A115: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/16/1980
| issue date = 06/16/1980
| title = Forwards Final Rept of Deficiency on Limitorque Motor Operated Valve Stem Nut Staking
| title = Forwards Final Rept of Deficiency on Limitorque Motor Operated Valve Stem Nut Staking
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:fREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:8006200171DOC~DATE:80/06/16NOTARIZED;NOFACIL:M.sauehannaSteamElectricStation~Unit1gPennsylva50388sauehannaSteamElectricStationgUnit2zPennsylvaAUTHORAFFILIATIONCRTIS>N.6.PennsylvaniaPower5LightCo~RECIP.NAWERFCIPIENTAFFILIATIONGRIERg8~H~RegioniiPhiladelphia~OfficeoftheDirector
{{#Wiki_filter:f REGULATORY INFORMATION DISTRIBUTION SYSTEM (R IDS)
ACCESSION NBR:8006200171              DOC ~ DATE:   80/06/16    NOTARIZED;     NO        DOCKET FACIL: M.             sauehanna  Steam    Electric Station~ Unit        1g  Pennsylva  05000387 50 388        sauehanna  Steam    Electric Stationg Unit        2z  Pennsylva  05000388 AUTHOR  AFFILIATION C  RTIS>N.6.             Pennsylvania Power      5  Light Co  ~
REC IP. NAWE            RFCIPIENT AFFILIATION GRIERg 8  ~ H ~             Region ii Philadelphia~ Office of the Director


==SUBJECT:==
==SUBJECT:==
Forwardsfinalreptofdeficiencyonlimotorquemotoroperatedvalvestemnutstaking,DISTRIBUTIO~CODE:801eSCOPIESRECEIVED:LTRJENCL9SIZE:TITLE:ConstructionDeficiencyReport(10CFR50.55E)DOCKET0500038705000388RECIPIENTIOCODE/NAMEADI.IC8'uSt&Q-21LARA<A'gg004420NOTES:S~ED~v.E~~NCOPIESLTTRENCLACTION:1111RECIPIENTIOCODE/NAMEBCqOunlG&CNb15PMs'rHRK,P.10COPIESI.TTRENCL1INTERNAL:AD/RCI/IEEDO8STAFF07FIELDCOOR/IE13HYD/GEOBR22HPA08OELD'3QABR10STANDRDSDEV1111111111111111AEOOEQUIPQUALBR16HANAUERgS~IEE05-NRCPDR020BR17+REGFILE011~111122111111EXTERNAL:ACRSNSIC1611LPDR0311July231SBOTOTALNUBBEROFCOPIESREQUIRED:LTTR38ENCL38 TWONORTHNINTHSTREET,ALLENTOWN,PA.18101PHONE:(21S)821.5181NORMANW.CURTISVicePresident.Engineering8Construction82'I-5381June16,1980Mr.BoyceH.GrierDirector,RegionIU.S.NuclearRegulatoryCommission631ParkAvenueKingofPrussia,Pennsylvania19406SUSQUEHANNASTEAMELECTRICSTATIONFINALREPORTOFADEFICIENCYONLIMITORQUEMOTOROPERATEDVALVESTEMNUTSTAKING-,MCARG-1ERs100450/100508FILE840-4PLA-497
Forwards final rept of deficiency on limotorque motor operated valve stem nut staking, DISTRIBUTIO~ CODE: 801eS            COPIES RECEIVED:LTR JENCL 9                SIZE:
TITLE: Construction Deficiency Report (10CFR50.55E)
NOTES:   S~ED     ~v. E~~N RECIPIENT          COPIES              RECIPIENT              COPIES IO CODE/NAME          LTTR ENCL          IO CODE/NAME          I.TTR ENCL ACTION:       AD I.IC 8'uSt&Q- 21        1      1      BC qOunlG&C Nb15          1 LA RA<A'gg004420          1      1      PMs'r HRK, P. 10 INTERNAL: AD/RC I/IE                    1      1      AEOO                      1  ~  1 EDO 8 STAFF      07      1              EQUIP QUAL BR 16                  1 F IELD COOR/IE13                          HANAUERgS ~
                            '3 1      1                                  1      1 HYD/GEO BR        22      1      1      IEE              05-       2      2 HPA              08      1      1      NRC PDR          02        1      1 OELD                      1      1      0            BR 17        1      1 QA BR            10              1    +REG  F ILE      01        1      1 STANDRDS DEV 11            1      1 EXTERNAL: ACRS                          16              LPDR            03        1      1 NSIC                      1      1 July 23  1SBO TOTAL NUBBER OF COPIES          REQUIRED: LTTR        38  ENCL    38
 
TWO NORTH NINTH STREET,       ALLENTOWN, PA. 18101  PHONE: (21S) 821.5181 NORMAN W. CURTIS Vice President. Engineering 8 Construction 82'I-5381 June 16, 1980 Mr. Boyce H. Grier Director, Region              I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION FINAL REPORT OF A DEFICIENCY ON LIMITORQUE MOTOR OPERATED VALVE STEM NUT STAKING -,MCAR G-1 ERs    100450/100508                  FILE 840-4 PLA-497


==References:==
==References:==
PLA-475datedApril25,1980PLA-403datedSeptember26,1979PLA-329datedMarch2,1978
PLA-475 dated April 25, 1980 PLA-403 dated September 26, 1979 PLA-329 dated March 2, 1978
 
==Dear Mr.        Grier:==
 
This supplements the above referenced correspondence and provides a final report regarding stem nut staking on Limitorque motor operated valves. The report has been prepared by Bechtel Power Corporation and concurred with by PP&L, All Limitorque              motor operated valves    installed in Units 1 & 2 have been inspected/staked.                Those valves  that have not yet been installed are considered indeterminate and              are being controlled via Bechtel nonconformance and condition reports.
Please advise should you require                further information.
N. W.      Curtis Vice President-Engineering              &  Construction-Nuclear Attachment JRB:mcb
                                                                                                      $ 0/7 ii)
PENNSYLVANIA POWER    8, LIGHT COMPANY 8 {) 062 000          lpga


==DearMr.Grier:==
Mr. Boyce H. Grier                                        June 16, 1980 cc: Mr. Victor Stello    (15)
ThissupplementstheabovereferencedcorrespondenceandprovidesafinalreportregardingstemnutstakingonLimitorquemotoroperatedvalves.ThereporthasbeenpreparedbyBechtelPowerCorporationandconcurredwithbyPP&L,AllLimitorquemotoroperatedvalvesinstalledinUnits1&2havebeeninspected/staked.ThosevalvesthathavenotyetbeeninstalledareconsideredindeterminateandarebeingcontrolledviaBechtelnonconformanceandconditionreports.Pleaseadviseshouldyourequirefurtherinformation.N.W.CurtisVicePresident-Engineering&Construction-NuclearAttachmentJRB:mcb$0/7ii)8{)0620PENNSYLVANIAPOWER8,LIGHTCOMPANY00lpga Mr.BoyceH.GrierJune16,1980cc:Mr.VictorStello(15)Director-OfficeofInspectionaEnforcementU.S.NuclearRegulatoryCommissionWashington,D.C.20555Mr.G.McDonald,DirectorOfficeofManagementInformationaProgramControlU.S.NuclearRegulatoryCommissionWashington,D.C.20555Mr.RobertM.GalloU.S.NuclearRegulatoryCommissionP.O.Box52Shickshinny,Pennsylvania18655
Director-Office of Inspection  a Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information a Program  Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny, Pennsylvania    18655}}
}}

Latest revision as of 01:47, 22 October 2019

Forwards Final Rept of Deficiency on Limitorque Motor Operated Valve Stem Nut Staking
ML18030A115
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/16/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18030A116 List:
References
PLA-497, NUDOCS 8006200171
Download: ML18030A115 (3)


Text

f REGULATORY INFORMATION DISTRIBUTION SYSTEM (R IDS)

ACCESSION NBR:8006200171 DOC ~ DATE: 80/06/16 NOTARIZED; NO DOCKET FACIL: M. sauehanna Steam Electric Station~ Unit 1g Pennsylva 05000387 50 388 sauehanna Steam Electric Stationg Unit 2z Pennsylva 05000388 AUTHOR AFFILIATION C RTIS>N.6. Pennsylvania Power 5 Light Co ~

REC IP. NAWE RFCIPIENT AFFILIATION GRIERg 8 ~ H ~ Region ii Philadelphia~ Office of the Director

SUBJECT:

Forwards final rept of deficiency on limotorque motor operated valve stem nut staking, DISTRIBUTIO~ CODE: 801eS COPIES RECEIVED:LTR JENCL 9 SIZE:

TITLE: Construction Deficiency Report (10CFR50.55E)

NOTES: S~ED ~v. E~~N RECIPIENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR ENCL IO CODE/NAME I.TTR ENCL ACTION: AD I.IC 8'uSt&Q- 21 1 1 BC qOunlG&C Nb15 1 LA RA<A'gg004420 1 1 PMs'r HRK, P. 10 INTERNAL: AD/RC I/IE 1 1 AEOO 1 ~ 1 EDO 8 STAFF 07 1 EQUIP QUAL BR 16 1 F IELD COOR/IE13 HANAUERgS ~

'3 1 1 1 1 HYD/GEO BR 22 1 1 IEE 05- 2 2 HPA 08 1 1 NRC PDR 02 1 1 OELD 1 1 0 BR 17 1 1 QA BR 10 1 +REG F ILE 01 1 1 STANDRDS DEV 11 1 1 EXTERNAL: ACRS 16 LPDR 03 1 1 NSIC 1 1 July 23 1SBO TOTAL NUBBER OF COPIES REQUIRED: LTTR 38 ENCL 38

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (21S) 821.5181 NORMAN W. CURTIS Vice President. Engineering 8 Construction 82'I-5381 June 16, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION FINAL REPORT OF A DEFICIENCY ON LIMITORQUE MOTOR OPERATED VALVE STEM NUT STAKING -,MCAR G-1 ERs 100450/100508 FILE 840-4 PLA-497

References:

PLA-475 dated April 25, 1980 PLA-403 dated September 26, 1979 PLA-329 dated March 2, 1978

Dear Mr. Grier:

This supplements the above referenced correspondence and provides a final report regarding stem nut staking on Limitorque motor operated valves. The report has been prepared by Bechtel Power Corporation and concurred with by PP&L, All Limitorque motor operated valves installed in Units 1 & 2 have been inspected/staked. Those valves that have not yet been installed are considered indeterminate and are being controlled via Bechtel nonconformance and condition reports.

Please advise should you require further information.

N. W. Curtis Vice President-Engineering & Construction-Nuclear Attachment JRB:mcb

$ 0/7 ii)

PENNSYLVANIA POWER 8, LIGHT COMPANY 8 {) 062 000 lpga

Mr. Boyce H. Grier June 16, 1980 cc: Mr. Victor Stello (15)

Director-Office of Inspection a Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny, Pennsylvania 18655