ML18031A206: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1979
| issue date = 07/31/1979
| title = Discusses Status of Plans to Perform Full Scale Test to Confirm Oscillation Load Specs.Requests Witnessing of Test Runs During Week of 791112.Test Matrix & Plan Will Be Forwarded in Sept
| title = Discusses Status of Plans to Perform Full Scale Test to Confirm Oscillation Load Specs.Requests Witnessing of Test Runs During Week of 791112.Test Matrix & Plan Will Be Forwarded in Sept
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = PARR O D
| addressee name = Parr O
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:~
REGULA TL      INFORMATION DISTRIBUTION
                                                                    ~        )STEM  (AIDS)
SEDATE:
ACCESSION NBR:7908060256                OQC          79/07/31      NOTARIZED: '40              DOCKET FACIL'uehanna 50 388    S    quehanna Steam Steam Electric Station> Unit Electric StationR Unit 1<
2R Pennsylva Pennsylva 05000387 05000388
              'ight U                      AUTHOR  AFFILIATION CVRTISEN,A.              Pennsylvania Power R Light Co.
C IP ~ NAME          RECIP IEN1'FFILIATION PARRRO F 0                          'tater Reactors Branch        3
==SUBJECT:==
Discusses    status of plans to perform full scale test to confirm oscillati'on load specs, Requests witness test runs during week of 791112.Test matrix            8, plan will be forwarded in Sept.
DISTRIBUTION CODE: BOOIB            COPIES RECEIVED:LTR g ENCL 5                  SIZE:
TITLE: PSAR/FSAR        AMDTS ANO RFLATED CORRESPONDENCE ~
NOTES:  5'E~~ 2      <  E', ~ Qg ~+I'+          B g~      /~2>Ti5    . l. 8.
                                                                              ~
g~  E'G'E'+$ 7///LD'Cr RECIPIENT            COPIES                REC IP IENT              COPIES IO CODE/NAME          LTTR ENCL            ID CODE/NAME            LTTR EN L ACTION;      05 PM Pf/4'Eg                1            AO BC                          1            LA    LEER  4f/              ]    I INTERNAL: 01                                            02 NRC PDR 0  I  8  E                              08 OPERA LIC BR 09 GEOSCIEN BR                            10  GAB 11 MECH ENG BH                            12  STRUC ENG BR 13 MATL ENG BR                            15  REAC SYS BR 16 ANALYSIS BR                            17  CORE PERF BR 18 AUX SYS BR.                            19  CONTAIN SYS 20 I 8 C ANALYSIS SYS BH                      21  PQSvER  sYs    BR 22 AD SITE TECrl                          26 ACCONT ANLYS 27 EFFL TRT SYS                          28 RAO ASMT BR 29 KIRKAOOO                              AD FOR    ENG AO PLANT SYS                              AO REAC    SAFETY AO  SITE                                  DIRECTOR NRR HYDRO METEOR BR                          MPA OELD EXTFRNAL: 03 LPOR                          1            Oa  NSIC 30 ACRS                    10    1 LQ rrleo'RE E/6'A        HC AUG    8 1979                              cEEQ,H gag ~w        L/9 C7 TOTAL NUMBER OF COPIES          REQUIRED: LTTR        5 & E'kCL
Op                                    ~e PPaL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101  PHONE( (2 I5) 821-5151 July 31,  1979 Director of Nuclear Reactor Regulation U. S. Nuclear    Regulatory Commission Washington,  DC    20555                        gggg~~
ATTN:    Mr. Olan D. Parr, Chief                                        8/(g Light Water Reactors Branch No. 3 p((
L'gpss SUSQUEHANNA STEAM ELECTRIC STATION CONDENSATZON OSCILLATION TESTING SCHEDULE ER 100450            FILE 840-2, 172 PLA-386
==Dear Mr. Parr:==
Zn our March 23, 1979 and July 16, 1979 meetings with you, we outlined our plans to perform a full scale test to confirm the condensation oscillation load specification to be used on the Susquehanna SES Plant. This test is bei.ng planned by Kraftwerk Union and will be run at the GKM facility in Mannheim, Federal Republic of Germany.
We  plan to forward the test matrix and plan to you during the second week of  September.
We also invite you to view the performance of some of the test runs.                At the present time, the week of November 12, 1979 appears to be the optimum time to witness the tests.
We  will keep  you informed  of any changes  to our plans  and schedule        for the GKM-ZIM testing    program.
Very  truly yours, Qvv$
N. W. Curtis Vice President    Engineering a  Construction A@1 DFR: dah PENNSYLVANIA POWER    8 LIGHT    COPAPANY              7908    060+}}

Latest revision as of 00:26, 22 October 2019

Discusses Status of Plans to Perform Full Scale Test to Confirm Oscillation Load Specs.Requests Witnessing of Test Runs During Week of 791112.Test Matrix & Plan Will Be Forwarded in Sept
ML18031A206
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-386, NUDOCS 7908060256
Download: ML18031A206 (2)


Text

~

REGULA TL INFORMATION DISTRIBUTION

~ )STEM (AIDS)

SEDATE:

ACCESSION NBR:7908060256 OQC 79/07/31 NOTARIZED: '40 DOCKET FACIL'uehanna 50 388 S quehanna Steam Steam Electric Station> Unit Electric StationR Unit 1<

2R Pennsylva Pennsylva 05000387 05000388

'ight U AUTHOR AFFILIATION CVRTISEN,A. Pennsylvania Power R Light Co.

C IP ~ NAME RECIP IEN1'FFILIATION PARRRO F 0 'tater Reactors Branch 3

SUBJECT:

Discusses status of plans to perform full scale test to confirm oscillati'on load specs, Requests witness test runs during week of 791112.Test matrix 8, plan will be forwarded in Sept.

DISTRIBUTION CODE: BOOIB COPIES RECEIVED:LTR g ENCL 5 SIZE:

TITLE: PSAR/FSAR AMDTS ANO RFLATED CORRESPONDENCE ~

NOTES: 5'E~~ 2 < E', ~ Qg ~+I'+ B g~ /~2>Ti5 . l. 8.

~

g~ E'G'E'+$ 7///LD'Cr RECIPIENT COPIES REC IP IENT COPIES IO CODE/NAME LTTR ENCL ID CODE/NAME LTTR EN L ACTION; 05 PM Pf/4'Eg 1 AO BC 1 LA LEER 4f/ ] I INTERNAL: 01 02 NRC PDR 0 I 8 E 08 OPERA LIC BR 09 GEOSCIEN BR 10 GAB 11 MECH ENG BH 12 STRUC ENG BR 13 MATL ENG BR 15 REAC SYS BR 16 ANALYSIS BR 17 CORE PERF BR 18 AUX SYS BR. 19 CONTAIN SYS 20 I 8 C ANALYSIS SYS BH 21 PQSvER sYs BR 22 AD SITE TECrl 26 ACCONT ANLYS 27 EFFL TRT SYS 28 RAO ASMT BR 29 KIRKAOOO AD FOR ENG AO PLANT SYS AO REAC SAFETY AO SITE DIRECTOR NRR HYDRO METEOR BR MPA OELD EXTFRNAL: 03 LPOR 1 Oa NSIC 30 ACRS 10 1 LQ rrleo'RE E/6'A HC AUG 8 1979 cEEQ,H gag ~w L/9 C7 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 & E'kCL

Op ~e PPaL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE( (2 I5) 821-5151 July 31, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 gggg~~

ATTN: Mr. Olan D. Parr, Chief 8/(g Light Water Reactors Branch No. 3 p((

L'gpss SUSQUEHANNA STEAM ELECTRIC STATION CONDENSATZON OSCILLATION TESTING SCHEDULE ER 100450 FILE 840-2, 172 PLA-386

Dear Mr. Parr:

Zn our March 23, 1979 and July 16, 1979 meetings with you, we outlined our plans to perform a full scale test to confirm the condensation oscillation load specification to be used on the Susquehanna SES Plant. This test is bei.ng planned by Kraftwerk Union and will be run at the GKM facility in Mannheim, Federal Republic of Germany.

We plan to forward the test matrix and plan to you during the second week of September.

We also invite you to view the performance of some of the test runs. At the present time, the week of November 12, 1979 appears to be the optimum time to witness the tests.

We will keep you informed of any changes to our plans and schedule for the GKM-ZIM testing program.

Very truly yours, Qvv$

N. W. Curtis Vice President Engineering a Construction A@1 DFR: dah PENNSYLVANIA POWER 8 LIGHT COPAPANY 7908 060+