IR 05000254/2018005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Stoedert K
| author name = Stoedert K
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000254, 05000265, 07200053
| docket = 05000254, 05000265, 07200053
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 28, 2018
{{#Wiki_filter:ust 28, 2018


==SUBJECT:==
==SUBJECT:==
UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION , UNITS 1 AND 2 (REPORT 05000254/2018005 AND 05000265/2018005
UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2018005 AND 05000265/2018005)
)  


Dear Mr. Hanson
==Dear Mr. Hanson:==
: The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Quad Cities Nuclear Power Station, Units 1 and The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In addition to the baseline inspections, an inspection of TI-191, "Inspection of The Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders And Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans,"
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Quad Cities Nuclear Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
and T I-193, "Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions," are planned for the week of April 26, 201 B. Hanson -2- This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Please contact me at 630-829-9731 with any questions you have regarding this lette
In addition to the baseline inspections, an inspection of TI-191, Inspection of The Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders And Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, and TI-193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, are planned for the week of April 26, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Please contact me at 630-829-9731 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30 Enclosure:
/RA/
Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30 Enclosure:
Inspection Plan cc: Distribution via LISTSERV
Inspection Plan cc: Distribution via LISTSERV
}}
}}

Latest revision as of 15:51, 20 October 2019

Updated Inspection Plan for Quad Cities Nuclear Power Station -Quad Nuclear Power Station, Units 1 and 2 (Report 05000254/2018005 and 05000265/2018005)
ML18240A354
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/28/2018
From: Stoedert K
NRC/RGN-III/DRP/B1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018005
Download: ML18240A354 (6)


Text

ust 28, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (REPORT 05000254/2018005 AND 05000265/2018005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Quad Cities Nuclear Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the baseline inspections, an inspection of TI-191, Inspection of The Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders And Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, and TI-193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, are planned for the week of April 26, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9731 with any questions you have regarding this letter.

Sincerely,

/RA/

Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265;72-053 License Nos. DPR-29; DPR-30 Enclosure:

Inspection Plan cc: Distribution via LISTSERV