| {{#Wiki_filter:<scE&G. May 2, 2019 A SCANA COMPANY U. S. Nuclear Regulatory Commission Attention: | | {{#Wiki_filter:< scE&G. A SCANA COMPANY May 2, 2019 U. S. Nuclear Regulatory Commission Serial No.: 19-206 Attention: Document Control Desk VCS LIC/WCM: Rev 0 Washington, DC 20555-0001 Docket No.: 50-395 License No.: NPF-12 SOUTH CAROLINA ELECTRIC & GAS (SCE&G) COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 ANNUAL COMMITMENT CHANGE |
| Document Control Desk Washington, DC 20555-0001 Serial No.: VCS LIC/WCM: Docket No.: License No.: SOUTH CAROLINA ELECTRIC & GAS (SCE&G) COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 ANNUAL COMMITMENT CHANGE | |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| REPORT 19-206 Rev 0 50-395 NPF-12 Please find attached the 2018 Annual Commitment Change Summary Report. The commitment changes were performed in accordance with VCSNS's Regulatory Commitment Management Program, which was developed following guidance from NEI 99-04 "Guidelines for Managing NRC Commitment Changes." Should you have any questions or require additional information, please contact Mr. Michael S. Moore at (803) 345-4752. George Lippard Site Vice President V.C. Summer Nuclear Station V. C. Summer Nuclear Station, P. 0. Box 88, Jenkinsville, South Carolina, 29065, F (803) 941-9776 | | REPORT Please find attached the 2018 Annual Commitment Change Summary Report. The commitment changes were performed in accordance with VCSNS's Regulatory Commitment Management Program, which was developed following guidance from NEI 99-04 "Guidelines for Managing NRC Commitment Changes." |
| * www.sceg.com Commitments contained in this letter: None | | Should you have any questions or require additional information, please contact Mr. |
| | Michael S. Moore at (803) 345-4752. |
| | ~~ |
| | George Lippard Site Vice President V.C. Summer Nuclear Station V. C. Summer Nuclear Station, P. 0. Box 88, Jenkinsville, South Carolina, 29065, F(803) 941-9776 |
| | * www.sceg.com |
| | |
| | Serial No. 19-206 Docket No. 50-395 Page 2 of 2 Commitments contained in this letter: None |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| | Summary of Commitment Changes cc: G. J. Lindamood Nuclear Coordinator Santee CooperNCSNS Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 S. A. Williams Senior Project Manager - VCSNS U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1 A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector VCSNS |
| | |
| | ATTACHMENT Summary of Commitment Changes Virgil C. Summer Nuclear Station - Unit 1 South Carolina Electric and Gas |
| | |
| | Serial No. 19-206 Docket No. 50-395 Page 1 of 3 The following commitment changes, with a brief justification, were performed during 2018 in accordance with Virgil C. Summer Nuclear Station's (VCSNS) Regulatory Commitment Management Program, which was developed following NEI 99-04, "Guidelines for Managing NRG Commitment Changes." The changes are documented in the station's corrective action program condition reports (CRs): |
| | CR-18-02427 Commitment - SCE&G committed to submit a license amendment request (LAR) identifying doors DRIB/105A&B as doors that were evaluated to have variances from NFPA-80 requirements . Changes were applied to the doors but an LAR was required to address cited violation 05000395/2016007-01 received for the door variances and to update the current license basis. The commitment was to submit the LAR by June 30, 2018. |
| | Change - The commitment date to submit the LAR for doors DRIB/105A&B doors was changed from June 30, 2018 to August 31, 2018. |
| | Justification for Change/Deletion - Changes in the scope of the LAR and additional time needed to review information necessary to support the LAR were in progress (CR-16-05919). |
| | In the station's original NFPA-805 LAR submittal, SCE&G did not identify doors DRIB/105A&B as fire doors that did not meet the self-closing requirements in accordance with NFPA-80. The oversight resulted in SCE&G receiving an NRG violation. In response to the violation, SCE&G initially committed to update the station's licensing design basis through a revision to the NFPA-805 LAR by April 28, 2017. Due to additional time being needed to complete the analysis and review the information ) |
| | necessary to support the LAR's resubmittal , SCE&G submitted a revised commitment I date for the LAR's resubmittal from April 28, 2017 to November 30, 2017. Due to the changes in the scope of the LAR to address (1) update of the Fire Probabilistic Risk ( |
| | Assessment (Table 'W') to correct modeling errors; (2) address de-scoped plant modifications; (3) identify DRIB/105A&B as doors that have been evaluated for variances from NFPA-80 requirements; and (4) revision of documentation impacted by the noted changes, additional time was required to support the LAR resubmittal. The additional effort and subsequent reviews required to support changes in scope of the LAR necessitated a change in the resubmittal date from November 30, 2017 to June 30, 2018 . |
| | SCE&G identified the need for additional time to complete preparation of the LAR submittal and submitted a change in commitment date to the NRG (Reference RC 0074, dated June 18, 2018) updating the LAR submittal date from June 30 , 2018 to August 31, 2018. |
|
| |
|
| Summary of Commitment Changes cc: G. J. Lindamood Nuclear Coordinator Santee CooperNCSNS Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 S. A. Williams Senior Project Manager -VCSNS U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1 A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector VCSNS Serial No. 19-206 Docket No. 50-395 Page 2 of 2 ATTACHMENT Summary of Commitment Changes Virgil C. Summer Nuclear Station -Unit 1 South Carolina Electric and Gas Serial No. 19-206 Docket No. 50-395 Page 1 of 3 The following commitment changes, with a brief justification, were performed during 2018 in accordance with Virgil C. Summer Nuclear Station's (VCSNS) Regulatory Commitment Management Program, which was developed following NEI 99-04, "Guidelines for Managing NRG Commitment Changes." The changes are documented in the station's corrective action program condition reports (CRs): CR-18-02427 Commitment
| | Serial No. 19-206 Docket No. 50-395 Page 2 of 3 CR-18-01018 Commitment - The station committed to verify the Spent Fuel Pool Level Indication (SFPLI) function (transmitters ILT09780-FX and ILT09781-FX), verify battery capability, and replace Lithium C-cell batteries every 6 months. |
| -SCE&G committed to submit a license amendment request (LAR) identifying doors DRIB/105A&B as doors that were evaluated to have variances from NFPA-80 requirements. Changes were applied to the doors but an LAR was required to address cited violation 05000395/2016007-01 received for the door variances and to update the current license basis. The commitment was to submit the LAR by June 30, 2018. Change -The commitment date to submit the LAR for doors DRIB/105A&B doors was changed from June 30, 2018 to August 31, 2018. Justification for Change/Deletion
| | Change - The replacement schedule for the Lithium C-cell batteries was extended from every 6 months to every 18 months. |
| -Changes in the scope of the LAR and additional time needed to review information necessary to support the LAR were in progress (CR-16-05919).
| | Justification For Change/Deletion - The history of performance and function of the new SFPLI equipment revealed the calibration frequency supported a replacement frequency from 6 months to 18 months. Preventative Maintenance (PM) feedback after several performances found the indicators worked properly and that the station had been unnecessarily replacing the batteries. Engineers agreed to the frequency extension based on equipment performance and the as-found conditions. |
| In the station's original NFPA-805 LAR submittal, SCE&G did not identify doors DRIB/105A&B as fire doors that did not meet the self-closing requirements in accordance with NFPA-80. The oversight resulted in SCE&G receiving an NRG violation.
| | CR-13-04375 Commitment - SCE&G committed to full implementation of the Open Phase Isolation System (OPIS) in the letter from Thomas D. Gatlin, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System [ML14035A455]. Full implementation of the OPIS was based on the below schedule: |
| In response to the violation, SCE&G initially committed to update the station's licensing design basis through a revision to the NFPA-805 LAR by April 28, 2017. Due to additional time being needed to complete the analysis and review the information necessary to support the LAR's resubmittal , SCE&G submitted a revised commitment date for the LAR's resubmittal from April 28, 2017 to November 30, 2017. Due to the changes in the scope of the LAR to address (1) update of the Fire Probabilistic Risk Assessment (Table 'W') to correct modeling errors; (2) address de-scoped plant modifications
| | : 1. Installation of the OPIS system on engineered safeguards feature (ESF) transformer XTF-4 by RF-23 (July 2017). |
| ; (3) identify DRIB/105A&B as doors that have been evaluated for variances from NFPA-80 requirements; and (4) revision of documentation impacted by the noted changes, additional time was required to support the LAR resubmittal.
| | : 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018. |
| The additional effort and subsequent reviews required to support changes in scope of the LAR necessitated a change in the resubmittal date from November 30, 2017 to June 30, 2018. SCE&G identified the need for additional time to complete preparation of the LAR submittal and submitted a change in commitment date to the NRG (Reference RC-18-0074 , dated June 18 , 2018) updating the LAR submittal date from June 30 , 2018 to August 31, 2018. ) I (
| | : 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by December 31, 2018 . |
| CR-18-01018 Serial No. 19-206 Docket No. 50-395 Page 2 of 3 Commitment | | : 4. Full implementation of the OPIS by December 31, 2018. |
| -The station committed to verify the Spent Fuel Pool Level Indication (SFPLI) function (transmitters IL T09780-FX and IL T09781-FX), verify battery capability, and replace Lithium C-cell batteries every 6 months. Change -The replacement schedule for the Lithium C-cell batteries was extended from every 6 months to every 18 months. Justification For Change/Deletion | | On December 11, 2017 (ML17346A577), SCE&G submitted a commitment change revising the OPIS installation schedule as follows: |
| -The history of performance and function of the new SFPLI equipment revealed the calibration frequency supported a replacement frequency from 6 months to 18 months. Preventative Maintenance (PM) feedback after several performances found the indicators worked properly and that the station had been unnecessarily replacing the batteries. Engineers agreed to the frequency extension based on equipment performance and the as-found conditions. | | : 1. Installation of the OPIS system on transformer XTF-4 will be in the Fall 2018 during refueling outage 24 (RF-24). |
| CR-13-04375 Commitment | | : 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018. |
| -SCE&G committed to full implementation of the Open Phase Isolation System (OPIS) in the letter from Thomas D. Gatlin, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System [ML14035A455]. | | : 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by June 30, 2020. |
| Full implementation of the OPIS was based on the below schedule: | | : 4. Full implementation of the OPIS by June 30 , 2020. |
| : 1. Installation of the OPIS system on engineered safeguards feature (ESF) transformer XTF-4 by RF-23 (July 2017). 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018. 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by December 31, 2018. 4. Full implementation of the OPIS by December 31, 2018. On December 11, 2017 (ML17346A577), SCE&G submitted a commitment change revising the OPIS installation schedule as follows: 1. Installation of the OPIS system on transformer XTF-4 will be in the Fall 2018 during refueling outage 24 (RF-24). 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018. 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by June 30, 2020. 4. Full implementation of the OPIS by June 30 , 2020. Change -Perform the OPIS installations according to the revised schedule. | | Change - Perform the OPIS installations according to the revised schedule. |
| : 1. Install the OPIS Trip Function on ESF Transformer XTF-31 by October 31, 2020. | | : 1. Install the OPIS Trip Function on ESF Transformer XTF-31 by October 31, 2020. |
| Serial No. 19-206 Docket No. 50-395 Page 3 of 3 2. Install the OPIS Trip Function on ESF Transformers XTF-4 and XTF-5 by October 31, 2020. 3. Full implementation of the OPIS by October 31,2020. Justification for Change/Deletion | | |
| -On December 11, 2017 , SCE&G submitted a commitment date change as a result of an RF-23 outage emergent issue requiring the delay of installation of the OPIS system on XTF-4. By letter dated September 20, 2018 , NEI communicated to the NRC a revision to the NEI Open Phase Condition Industry Initiative. | | Serial No. 19-206 Docket No. 50-395 Page 3 of 3 |
| This revision provided an extension of the open phase monitoring period into 2020 for plants that had not accumulated the full 24 months of monitoring. VCSNS subsequently changed the commitment date for full implementation of the OPIS from June 30, 2020 to October 31, 2020. VCSNS will also enable the trip function on transformers XTF-4 , XTF-5, and XTF-31 by the end of October 2020. These commitment date changes were proposed in accordance with the 24-month monitoring period extension detailed in the NEI Open Phase Condition Industry Initiative | | : 2. Install the OPIS Trip Function on ESF Transformers XTF-4 and XTF-5 by October 31, 2020. |
| | : 3. Full implementation of the OPIS by October 31,2020. |
| | Justification for Change/Deletion - On December 11, 2017, SCE&G submitted a commitment date change as a result of an RF-23 outage emergent issue requiring the delay of installation of the OPIS system on XTF-4 . By letter dated September 20, 2018, NEI communicated to the NRC a revision to the NEI Open Phase Condition Industry Initiative. This revision provided an extension of the open phase monitoring period into 2020 for plants that had not accumulated the full 24 months of monitoring . |
| | VCSNS subsequently changed the commitment date for full implementation of the OPIS from June 30, 2020 to October 31, 2020. VCSNS will also enable the trip function on transformers XTF-4 , XTF-5, and XTF-31 by the end of October 2020 . These commitment date changes were proposed in accordance with the 24-month monitoring period extension detailed in the NEI Open Phase Condition Industry Initiative |
| [ML18268A114].}} | | [ML18268A114].}} |
|
---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:Report
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML23024A1542023-01-23023 January 2023 Proposed Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Potential Subsequent License Renewal Activity ML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22279A9892022-09-23023 September 2022 Restoration Project - Final Status Survey Release Record North Protected Area Yard Survey Unit 12201C - Revision 2 ML22069B1172022-03-10010 March 2022 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20296A7082020-10-22022 October 2020 (VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19204A1172019-07-17017 July 2019 Vigil C. Summer, Unit 1, Proposed Alternative Request RR-4-20 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML19056A4122019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Baseline Biological Characterization Data ML19056A4132019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water System Data ML19056A4112019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water Intake Structure Data ML19056A4142019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Entrainment Performance Studies ML19056A4102019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Physical Data RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0089, Focused Evaluation for External Flooding2017-06-30030 June 2017 Focused Evaluation for External Flooding RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report ML19056A4152017-02-28028 February 2017 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Appendix B, Entrainment Study, 2016 and Revised 2017 RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design...2016-10-31031 October 2016 (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design... RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident RC-14-0048, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-03-26026 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML19056A4082014-02-28028 February 2014 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation, Addendum: Additional Modeling Cases for Revised Reservoir Ambient and Discharge Temperatures ML14034A3392014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A2282014-02-21021 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Virgil C. Summer Nuclear Station, Unit 1, TAC MF2338 ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds.2013-08-31031 August 2013 WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. RC-13-0038, Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task.2013-03-12012 March 2013 Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task. RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment2013-03-0101 March 2013 Permanent ILRT Interval Extension Risk Impact Assessment ML13072A0832013-01-31031 January 2013 12-4116.IPEC.V002, Revision 1, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 2024-01-16
[Table view] Category:Miscellaneous
MONTHYEARML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-12-0104, Submittal of ECCS Evaluation Model Revisions 30-Day Report2012-10-16016 October 2012 Submittal of ECCS Evaluation Model Revisions 30-Day Report RC-15-0020, Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements2012-07-31031 July 2012 Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements RC-11-0178, Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes2011-11-0404 November 2011 Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes RC-11-0119, 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak2011-08-0303 August 2011 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak ML1019304172010-05-0606 May 2010 Tritium Database Report ML0921001332009-07-24024 July 2009 Submittal of Special Report (Spr) 09-0001 RC-09-0050, Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report2009-05-14014 May 2009 Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report ML0810701772008-04-11011 April 2008 Submittal of Special Report 2008-001, Pursuant to Requirements of Technical Specification 3.3.3.10.a RC-08-0019, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment2008-02-19019 February 2008 Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment RC-08-0006, Application to Use Weighting Factors for External Exposure2008-02-19019 February 2008 Application to Use Weighting Factors for External Exposure RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 20072007-11-0606 November 2007 Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 RC-07-0081, ECCS Evaluation Model Revisions Annual Report2007-06-0101 June 2007 ECCS Evaluation Model Revisions Annual Report RC-06-0216, License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency2006-12-13013 December 2006 License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency RC-06-0205, ECCS Evaluation Model Revisions Report2006-12-0404 December 2006 ECCS Evaluation Model Revisions Report RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum2006-11-15015 November 2006 V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum RC-06-0196, Special Report (Spr) 2006-0052006-10-27027 October 2006 Special Report (Spr) 2006-005 RC-05-0076, Operating License, Special Report (Spr 2005-001)2005-05-19019 May 2005 Operating License, Special Report (Spr 2005-001) ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0406307712004-02-25025 February 2004 Transmittal of Semi-Annual Fitness-for-Duty Report for Period Ending December 31, 2003 2022-02-18
[Table view] |
Text
< scE&G. A SCANA COMPANY May 2, 2019 U. S. Nuclear Regulatory Commission Serial No.: 19-206 Attention: Document Control Desk VCS LIC/WCM: Rev 0 Washington, DC 20555-0001 Docket No.: 50-395 License No.: NPF-12 SOUTH CAROLINA ELECTRIC & GAS (SCE&G) COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 ANNUAL COMMITMENT CHANGE
SUMMARY
REPORT Please find attached the 2018 Annual Commitment Change Summary Report. The commitment changes were performed in accordance with VCSNS's Regulatory Commitment Management Program, which was developed following guidance from NEI 99-04 "Guidelines for Managing NRC Commitment Changes."
Should you have any questions or require additional information, please contact Mr.
Michael S. Moore at (803) 345-4752.
~~
George Lippard Site Vice President V.C. Summer Nuclear Station V. C. Summer Nuclear Station, P. 0. Box 88, Jenkinsville, South Carolina, 29065, F(803) 941-9776
Serial No.19-206 Docket No. 50-395 Page 2 of 2 Commitments contained in this letter: None
Attachment:
Summary of Commitment Changes cc: G. J. Lindamood Nuclear Coordinator Santee CooperNCSNS Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 S. A. Williams Senior Project Manager - VCSNS U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1 A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector VCSNS
ATTACHMENT Summary of Commitment Changes Virgil C. Summer Nuclear Station - Unit 1 South Carolina Electric and Gas
Serial No.19-206 Docket No. 50-395 Page 1 of 3 The following commitment changes, with a brief justification, were performed during 2018 in accordance with Virgil C. Summer Nuclear Station's (VCSNS) Regulatory Commitment Management Program, which was developed following NEI 99-04, "Guidelines for Managing NRG Commitment Changes." The changes are documented in the station's corrective action program condition reports (CRs):
CR-18-02427 Commitment - SCE&G committed to submit a license amendment request (LAR) identifying doors DRIB/105A&B as doors that were evaluated to have variances from NFPA-80 requirements . Changes were applied to the doors but an LAR was required to address cited violation 05000395/2016007-01 received for the door variances and to update the current license basis. The commitment was to submit the LAR by June 30, 2018.
Change - The commitment date to submit the LAR for doors DRIB/105A&B doors was changed from June 30, 2018 to August 31, 2018.
Justification for Change/Deletion - Changes in the scope of the LAR and additional time needed to review information necessary to support the LAR were in progress (CR-16-05919).
In the station's original NFPA-805 LAR submittal, SCE&G did not identify doors DRIB/105A&B as fire doors that did not meet the self-closing requirements in accordance with NFPA-80. The oversight resulted in SCE&G receiving an NRG violation. In response to the violation, SCE&G initially committed to update the station's licensing design basis through a revision to the NFPA-805 LAR by April 28, 2017. Due to additional time being needed to complete the analysis and review the information )
necessary to support the LAR's resubmittal , SCE&G submitted a revised commitment I date for the LAR's resubmittal from April 28, 2017 to November 30, 2017. Due to the changes in the scope of the LAR to address (1) update of the Fire Probabilistic Risk (
Assessment (Table 'W') to correct modeling errors; (2) address de-scoped plant modifications; (3) identify DRIB/105A&B as doors that have been evaluated for variances from NFPA-80 requirements; and (4) revision of documentation impacted by the noted changes, additional time was required to support the LAR resubmittal. The additional effort and subsequent reviews required to support changes in scope of the LAR necessitated a change in the resubmittal date from November 30, 2017 to June 30, 2018 .
SCE&G identified the need for additional time to complete preparation of the LAR submittal and submitted a change in commitment date to the NRG (Reference RC 0074, dated June 18, 2018) updating the LAR submittal date from June 30 , 2018 to August 31, 2018.
Serial No.19-206 Docket No. 50-395 Page 2 of 3 CR-18-01018 Commitment - The station committed to verify the Spent Fuel Pool Level Indication (SFPLI) function (transmitters ILT09780-FX and ILT09781-FX), verify battery capability, and replace Lithium C-cell batteries every 6 months.
Change - The replacement schedule for the Lithium C-cell batteries was extended from every 6 months to every 18 months.
Justification For Change/Deletion - The history of performance and function of the new SFPLI equipment revealed the calibration frequency supported a replacement frequency from 6 months to 18 months. Preventative Maintenance (PM) feedback after several performances found the indicators worked properly and that the station had been unnecessarily replacing the batteries. Engineers agreed to the frequency extension based on equipment performance and the as-found conditions.
CR-13-04375 Commitment - SCE&G committed to full implementation of the Open Phase Isolation System (OPIS) in the letter from Thomas D. Gatlin, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System [ML14035A455]. Full implementation of the OPIS was based on the below schedule:
- 1. Installation of the OPIS system on engineered safeguards feature (ESF) transformer XTF-4 by RF-23 (July 2017).
- 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018.
- 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by December 31, 2018 .
- 4. Full implementation of the OPIS by December 31, 2018.
On December 11, 2017 (ML17346A577), SCE&G submitted a commitment change revising the OPIS installation schedule as follows:
- 1. Installation of the OPIS system on transformer XTF-4 will be in the Fall 2018 during refueling outage 24 (RF-24).
- 2. Enabling of trip function on ESF transformer XTF-31 by December 31, 2018.
- 3. Enabling of the trip function on ESF transformers XTF-4 and XTF-5 by June 30, 2020.
- 4. Full implementation of the OPIS by June 30 , 2020.
Change - Perform the OPIS installations according to the revised schedule.
- 1. Install the OPIS Trip Function on ESF Transformer XTF-31 by October 31, 2020.
Serial No.19-206 Docket No. 50-395 Page 3 of 3
- 2. Install the OPIS Trip Function on ESF Transformers XTF-4 and XTF-5 by October 31, 2020.
- 3. Full implementation of the OPIS by October 31,2020.
Justification for Change/Deletion - On December 11, 2017, SCE&G submitted a commitment date change as a result of an RF-23 outage emergent issue requiring the delay of installation of the OPIS system on XTF-4 . By letter dated September 20, 2018, NEI communicated to the NRC a revision to the NEI Open Phase Condition Industry Initiative. This revision provided an extension of the open phase monitoring period into 2020 for plants that had not accumulated the full 24 months of monitoring .
VCSNS subsequently changed the commitment date for full implementation of the OPIS from June 30, 2020 to October 31, 2020. VCSNS will also enable the trip function on transformers XTF-4 , XTF-5, and XTF-31 by the end of October 2020 . These commitment date changes were proposed in accordance with the 24-month monitoring period extension detailed in the NEI Open Phase Condition Industry Initiative