Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23325A20216 January 2024CFR Part 52 Construction Lessons-Learned Report
ML23024A15423 January 2023Proposed Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Potential Subsequent License Renewal ActivityIncorporated by reference
ML22286A13913 October 2022Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel
ML22279A98923 September 2022Restoration Project - Final Status Survey Release Record North Protected Area Yard Survey Unit 12201C - Revision 2
ML22069B11710 March 2022Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination)Weld Overlay
Dissimilar Metal Weld
DM weld
ML22049B02418 February 20222021 Q4 Summary Page
IR 05000395/202100524 August 2021Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005)Cyber Security
License Renewal
Exemption Request
COVID-19
ML21175A24724 June 20212020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....-
ML20296A70822 October 2020(VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI IntervalFinite Element Analysis
Weak link
ML20247J6163 September 2020Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML20212L57630 July 2020Annual Commitment Change Summary Report
ML20203M16020 July 2020VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & StatusAnchor Darling
ML19204A11717 July 2019Vigil C. Summer, Unit 1, Proposed Alternative Request RR-4-20 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyNondestructive Examination
Dissimilar Metal Weld
ML19122A5172 May 2019Annual Commitment Change Summary ReportOpen Phase Condition
ML19056A41231 January 2019Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Baseline Biological Characterization DataLicense Renewal
ML19056A41331 January 2019Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water System Data
ML19056A41131 January 2019Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water Intake Structure Data
ML19056A41431 January 2019Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Entrainment Performance StudiesLicense Renewal
ML19056A41031 January 2019Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Physical DataGrab sample
License Renewal
RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment28 September 2018(Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk AssessmentSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
ML18179A41628 June 2018ECCS Evaluation Model Revisions ReportBackfit
RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report18 May 2018(Vcsns), Unit 1 - Annual Commitment Change Summary ReportProbabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
ML17206A45926 September 2017Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications AssessmentFLEX
Fukushima Dai-Ichi
RC-17-0089, Focused Evaluation for External Flooding30 June 2017Focused Evaluation for External FloodingUltimate heat sink
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report15 May 2017Emergency Core Cooling System Evaluation Model Revisions Annual ReportBackfit
ML19056A41528 February 2017Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Appendix B, Entrainment Study, 2016 and Revised 2017
RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal22 December 2016Mitigating Strategies Assessment (MSA) Report SubmittalUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design...31 October 2016(VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design...Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Time Critical Operator Action
B.5.b Mitigating Strategies
Earthquake
RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report22 June 2016Submittal of 2015 Annual Commitment Change Summary Report
RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability9 June 2016Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of InoperabilityFire Barrier
Fire Protection Program
Fire Watch
RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 128 January 2016Transmittal of Expedited Seismic Evaluation Process Report, Revision 1Boric Acid
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Finite Element Analysis
FLEX
Fukushima Dai-Ichi
B.5.b Mitigating Strategies
Earthquake
Power-Operated Valves
Power Operated Valves
ML15296A3773 November 2015Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism ReevaluationUltimate heat sink
Fukushima Dai-Ichi
RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report7 October 2015Submittal of 10 CFR 50.59 Biennial Report
ML15194A05520 July 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-IchiSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 225 February 2015Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2
ML15061A03325 February 2015Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2
ML14314A0335 November 2014Submittal Special Report (Spr) 2014-006Nondestructive Examination
ML14261A27618 September 2014Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support CenterSafe Shutdown
Emergency Lighting
Fuel cladding
ML14141A4616 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Scaffolding
RC-14-0048, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident26 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML14051A3635 March 2014Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722)Fuel cladding
ML19056A40828 February 2014Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation, Addendum: Additional Modeling Cases for Revised Reservoir Ambient and Discharge Temperatures
ML14034A33921 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML14037A22821 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Virgil C. Summer Nuclear Station, Unit 1, TAC MF2338Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML14010A41530 January 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13309B0534 November 2013ECCS Evaluation Model Revisions 30-Day ReportBackfit
RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds.31 August 2013WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds.Operating Basis Earthquake
Finite Element Analysis
RC-13-0038, Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task.12 March 2013Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task.Ultimate heat sink
Hydrostatic
Fukushima Dai-Ichi
RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment1 March 2013Permanent ILRT Interval Extension Risk Impact AssessmentSafe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML13072A08331 January 201312-4116.IPEC.V002, Revision 1, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051Boric Acid
High Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation