Issue date | Title | Topic | |
---|---|---|---|
ML23325A202 | 16 January 2024 | CFR Part 52 Construction Lessons-Learned Report | |
ML23024A154 | 23 January 2023 | Proposed Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Potential Subsequent License Renewal Activity | Incorporated by reference |
ML22286A139 | 13 October 2022 | Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel | |
ML22279A989 | 23 September 2022 | Restoration Project - Final Status Survey Release Record North Protected Area Yard Survey Unit 12201C - Revision 2 | |
ML22069B117 | 10 March 2022 | Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) | Weld Overlay Dissimilar Metal Weld DM weld |
ML22049B024 | 18 February 2022 | 2021 Q4 Summary Page | |
IR 05000395/2021005 | 24 August 2021 | Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) | Cyber Security License Renewal Exemption Request COVID-19 |
ML21175A247 | 24 June 2021 | 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- | |
ML20296A708 | 22 October 2020 | (VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval | Finite Element Analysis Weak link |
ML20247J616 | 3 September 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20212L576 | 30 July 2020 | Annual Commitment Change Summary Report | |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML19204A117 | 17 July 2019 | Vigil C. Summer, Unit 1, Proposed Alternative Request RR-4-20 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Nondestructive Examination Dissimilar Metal Weld |
ML19122A517 | 2 May 2019 | Annual Commitment Change Summary Report | Open Phase Condition |
ML19056A412 | 31 January 2019 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Baseline Biological Characterization Data | License Renewal |
ML19056A413 | 31 January 2019 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water System Data | |
ML19056A411 | 31 January 2019 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water Intake Structure Data | |
ML19056A414 | 31 January 2019 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Entrainment Performance Studies | License Renewal |
ML19056A410 | 31 January 2019 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Physical Data | Grab sample License Renewal |
RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment | 28 September 2018 | (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake FLEX Fukushima Dai-Ichi Large early release frequency Earthquake |
ML18179A416 | 28 June 2018 | ECCS Evaluation Model Revisions Report | Backfit |
RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report | 18 May 2018 | (Vcsns), Unit 1 - Annual Commitment Change Summary Report | Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi |
ML17206A459 | 26 September 2017 | Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment | FLEX Fukushima Dai-Ichi |
RC-17-0089, Focused Evaluation for External Flooding | 30 June 2017 | Focused Evaluation for External Flooding | Ultimate heat sink FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report | 15 May 2017 | Emergency Core Cooling System Evaluation Model Revisions Annual Report | Backfit |
ML19056A415 | 28 February 2017 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Appendix B, Entrainment Study, 2016 and Revised 2017 | |
RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal | 22 December 2016 | Mitigating Strategies Assessment (MSA) Report Submittal | Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi |
RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design... | 31 October 2016 | (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design... | Boric Acid High winds Shutdown Margin Ultimate heat sink Time to boil Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Time Critical Operator Action B.5.b Mitigating Strategies Earthquake |
RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report | 22 June 2016 | Submittal of 2015 Annual Commitment Change Summary Report | |
RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability | 9 June 2016 | Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability | Fire Barrier Fire Protection Program Fire Watch |
RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 | 28 January 2016 | Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 | Boric Acid Safe Shutdown Earthquake Probabilistic Risk Assessment Finite Element Analysis FLEX Fukushima Dai-Ichi B.5.b Mitigating Strategies Earthquake Power-Operated Valves Power Operated Valves |
ML15296A377 | 3 November 2015 | Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation | Ultimate heat sink Fukushima Dai-Ichi |
RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report | 7 October 2015 | Submittal of 10 CFR 50.59 Biennial Report | |
ML15194A055 | 20 July 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 | 25 February 2015 | Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 | |
ML15061A033 | 25 February 2015 | Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 | |
ML14314A033 | 5 November 2014 | Submittal Special Report (Spr) 2014-006 | Nondestructive Examination |
ML14261A276 | 18 September 2014 | Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center | Safe Shutdown Emergency Lighting Fuel cladding |
ML14141A461 | 6 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | Unanalyzed Condition Fukushima Dai-Ichi Earthquake Scaffolding |
RC-14-0048, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 26 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML14051A363 | 5 March 2014 | Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) | Fuel cladding |
ML19056A408 | 28 February 2014 | Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation, Addendum: Additional Modeling Cases for Revised Reservoir Ambient and Discharge Temperatures | |
ML14034A339 | 21 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML14037A228 | 21 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Virgil C. Summer Nuclear Station, Unit 1, TAC MF2338 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML14010A415 | 30 January 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13309B053 | 4 November 2013 | ECCS Evaluation Model Revisions 30-Day Report | Backfit |
RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. | 31 August 2013 | WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. | Operating Basis Earthquake Finite Element Analysis |
RC-13-0038, Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task. | 12 March 2013 | Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task. | Ultimate heat sink Hydrostatic Fukushima Dai-Ichi |
RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment | 1 March 2013 | Permanent ILRT Interval Extension Risk Impact Assessment | Safe Shutdown High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Earthquake |
ML13072A083 | 31 January 2013 | 12-4116.IPEC.V002, Revision 1, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 | Boric Acid High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |