Category:Report
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML23024A1542023-01-23023 January 2023 Proposed Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Potential Subsequent License Renewal Activity ML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22279A9892022-09-23023 September 2022 Restoration Project - Final Status Survey Release Record North Protected Area Yard Survey Unit 12201C - Revision 2 ML22069B1172022-03-10010 March 2022 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20296A7082020-10-22022 October 2020 (VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19204A1172019-07-17017 July 2019 Vigil C. Summer, Unit 1, Proposed Alternative Request RR-4-20 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML19056A4122019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Baseline Biological Characterization Data ML19056A4132019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water System Data ML19056A4112019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water Intake Structure Data ML19056A4142019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Entrainment Performance Studies ML19056A4102019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Physical Data RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0089, Focused Evaluation for External Flooding2017-06-30030 June 2017 Focused Evaluation for External Flooding RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report ML19056A4152017-02-28028 February 2017 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Appendix B, Entrainment Study, 2016 and Revised 2017 RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design...2016-10-31031 October 2016 (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design... RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident RC-14-0048, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-03-26026 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML19056A4082014-02-28028 February 2014 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation, Addendum: Additional Modeling Cases for Revised Reservoir Ambient and Discharge Temperatures ML14034A3392014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A2282014-02-21021 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Virgil C. Summer Nuclear Station, Unit 1, TAC MF2338 ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds.2013-08-31031 August 2013 WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. RC-13-0038, Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task.2013-03-12012 March 2013 Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task. RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment2013-03-0101 March 2013 Permanent ILRT Interval Extension Risk Impact Assessment ML13072A0832013-01-31031 January 2013 12-4116.IPEC.V002, Revision 1, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 2024-01-16
[Table view] Category:Miscellaneous
MONTHYEARML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-12-0104, Submittal of ECCS Evaluation Model Revisions 30-Day Report2012-10-16016 October 2012 Submittal of ECCS Evaluation Model Revisions 30-Day Report RC-15-0020, Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements2012-07-31031 July 2012 Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements RC-11-0178, Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes2011-11-0404 November 2011 Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes RC-11-0119, 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak2011-08-0303 August 2011 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak ML1019304172010-05-0606 May 2010 Tritium Database Report ML0921001332009-07-24024 July 2009 Submittal of Special Report (Spr) 09-0001 RC-09-0050, Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report2009-05-14014 May 2009 Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report ML0810701772008-04-11011 April 2008 Submittal of Special Report 2008-001, Pursuant to Requirements of Technical Specification 3.3.3.10.a RC-08-0019, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment2008-02-19019 February 2008 Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment RC-08-0006, Application to Use Weighting Factors for External Exposure2008-02-19019 February 2008 Application to Use Weighting Factors for External Exposure RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 20072007-11-0606 November 2007 Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 RC-07-0081, ECCS Evaluation Model Revisions Annual Report2007-06-0101 June 2007 ECCS Evaluation Model Revisions Annual Report RC-06-0216, License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency2006-12-13013 December 2006 License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency RC-06-0205, ECCS Evaluation Model Revisions Report2006-12-0404 December 2006 ECCS Evaluation Model Revisions Report RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum2006-11-15015 November 2006 V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum RC-06-0196, Special Report (Spr) 2006-0052006-10-27027 October 2006 Special Report (Spr) 2006-005 RC-05-0076, Operating License, Special Report (Spr 2005-001)2005-05-19019 May 2005 Operating License, Special Report (Spr 2005-001) ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0406307712004-02-25025 February 2004 Transmittal of Semi-Annual Fitness-for-Duty Report for Period Ending December 31, 2003 2022-02-18
[Table view] |