IR 05000395/2019005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations /RA/
{{#Wiki_filter:ust 28, 2019
 
==SUBJECT:==
UPDATED INSPECTION PLAN FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - (REPORT 05000395/2019005)
 
==Dear Mr. Stoddard:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2021 for Virgil C. Summer Nuclear Station, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
 
You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.
 
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
The NRC plans to conduct the following non-routine inspection in 2019; Temporary Instruction (TI) 2515/194, Inspection of the Licensee's Implementation of Industry Initiative Associated With The Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4603 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure:
Summer Inspection/Activity Plan (09/01/2019 - 06/30/2021)
cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - (REPORT 05000395/2019005)
DISTRIBUTION:
M. Kowal, RII R. Musser, BC L. Pressley, SPE R. Taylor, SPE OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROPAssessment Resource ROPReports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML19240A446 OFFICE RII:DRP RII:DRP NAME  LPressley RMusser DATE  8/22/2019 8/22/2019 OFFICIAL AGENCY RECORD
 
Enclosure 2
}}
}}

Latest revision as of 22:55, 7 October 2019

Updated Inspection Plan for Virgil C. Summer Nuclear Station, Unit 1 - (Report 05000395/2019005)
ML19240A446
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/28/2019
From: Randy Musser
NRC/RGN-II, Division Reactor Projects II
To: Stoddard D
South Carolina Electric & Gas Co
Reeder D
References
IR 2019005
Download: ML19240A446 (5)


Text

ust 28, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - (REPORT 05000395/2019005)

Dear Mr. Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021 for Virgil C. Summer Nuclear Station, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.

You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC plans to conduct the following non-routine inspection in 2019; Temporary Instruction (TI) 2515/194, Inspection of the Licensee's Implementation of Industry Initiative Associated With The Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4603 with any questions you have regarding this letter.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure:

Summer Inspection/Activity Plan (09/01/2019 - 06/30/2021)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - (REPORT 05000395/2019005)

DISTRIBUTION:

M. Kowal, RII R. Musser, BC L. Pressley, SPE R. Taylor, SPE OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROPAssessment Resource ROPReports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML19240A446 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 8/22/2019 8/22/2019 OFFICIAL AGENCY RECORD

Enclosure 2