ML061320465: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML061320465
| number = ML061320465
| issue date = 03/15/2006
| issue date = 03/15/2006
| title = E-mail from G. Bowman of Usnrc to S. Smith of Usnrc, Regarding Daily Statue Update 2-27-06
| title = E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Daily Statue Update 2-27-06
| author name = Bowman G
| author name = Bowman G
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Smith S M
| addressee name = Smith S
| addressee affiliation = NRC/FSME
| addressee affiliation = NRC/FSME
| docket = 05000003, 05000247, 05000286
| docket = 05000003, 05000247, 05000286

Revision as of 19:15, 13 July 2019

E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Daily Statue Update 2-27-06
ML061320465
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320465 (9)


Text

V FW: Daily Status Update 2-27-06---I -I .---711- I I - 11 I -.- I i -I 1 111z- i y ---111 -- tfPage 1 1 1, Stacy Smith -FW: Daily Status Update 2-27-06 Page 1 :1 From: "Bowman, Greg " <GBowm9O@entergy.com>

To: "'sms4 © nrc.gov"'

<sms4@ nrc.gov>Date: 3/15/06 8:39AM

Subject:

FW: Daily Status Update 2-27-06 From: Croulet, Donald Sent: Tuesday, February 28, 2006 6:29 AM To: Conroy, Pat; Cox, Mark R; Bowman, Greg; 'Timothy Rice'; 'James Noggle'; Janicki, John; Robert Oliveira (boliveira amnucins.com)

<mailto:boliveira~amnucins.com)>;

PRICE, ERNEST JR

Subject:

FW: Daily Status Update 2-27-06 From: Lavera, Ron Sent: Monday, February 27, 2006 5:21 PM To: Bob Evers; Christopher English; Daniel Wilson; David Smith; Dennis Quinn; Don Mayer; Donald Croulet; dquinn @ daq-inc.com

<mailto:dquinn©daq-inc.com>;

Dragos Nuta; dwinslow gza.com<mailto:dwinslow~gza.com>;

ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Jay Reynolds; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; mbarvenik gza.com<mailto:mbarvenik~gza.com>;

Michael Durfee; Michael Rutkoske; Nelson Azevedo; Paul Deeds;Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; Sam Petrosi; T. R. Jones; Thomas Burns

Subject:

Daily Status Update 2-27-06<<022706A MONITORING WELL STATUS.doc>>

RLaVera@entergy.com

<mailto:RLaVera

@ entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 I c. tep\W 0001 T (,, Pag~e 1AA c:\temp\GW}OOOO1 .TMP. .....Pacie- .... .. .. ...1.. .Mail Envelope Properties (441818F2.141:

8: 57665)

Subject:

FW: Daily Status Update 2-27-06 Creation Date: 3/15/06 8:38AM From: "Bowman, Greg " <GBowm9O@entergy.com>

Created By: GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)Post Office Route kpl-po.KPDO nrc.gov Files Size Date & Time MESSAGE 1445 03/15/06 08:38AM TEXT.htm 3841 022706A MONITORING WELL STATUS.doc 64512 Mime.822 96193 Options Expiration Date: None Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard Sta9y Smith -MONITORING WELL STATUS.doc Pacie 1 listac Smth-0276A MONITORI NG WELL STTUS.doc Page I MONITORING WELL STATUS (Feb 27, 2006- hours)Well Number MW-111 MW-30 MW-31 MW-32 MW-33 MW-34 MW-35 MW-36 Location Transformer Yard>U-2 SFB)p MOB side walk-C-2 SFB Alley Way;p Transformer Yard Transformer Yard Transformer Yard U-2 Turbine Bldg Status Baseline Sample PT In service In service In service In service In service In service In service Next Step Sampled (02/16/06)

Continue to sample Install permanent Packer Most recent sample Sampled 02/07/06 Sampled 02/07/06 Sampled 02/16/06 Sampled 02/16/06 Sampled 02/16/06 Sampled 02/07/06 Sampled 02/10/06 Sampled 02/10/06 Current Results (Highest Historical Value)261,000 pCi/L 302,000 pCi/L (11/10/05)

Raw Water (no Packer) 399,000 pCi/L (11/18/05)

Highest Packer Water: 601,000 pCi/L (11/22/05)

Low Flow Samples: 511,000 pCi/L (02/07/06) 33,100 pCi/L 33,100 pCi/L (02/07/06) 17,700 pCi/L 17,700 pCi/L (02/07/06) 261.OOOpCi/L 261,000 pCi/L (02/16/06) 199.000 pCi/L 212,000 pCi/L) (01/27/06) 90.500 pCi/L 104,000 pCi/1 (01/27/06) 26' =20,000 pCi/L 41'=47,500 pCi/L 47,500 pCi/L (02/10/06) 53'=22,400 pCi/L Stacy Smith -022706A MONITORING WELL STATUS.doc Page 2-.v= ...X-_ I Ae,.,t -^ .. a; .= -M-- ,,.< .-t ... .A1e I I .-1 .1 9^ a> I'l1i. ..",-,,~,-tt., -- ^ .- .-Z-~seiE~S i- -w;.MW-37 U-2 Turbine Bldg MW-38 South U-3 Boundary NY State Result: 701 pCiA (12/08/05)

In Service Continue periodic sampling 10,700 pCi/l @ -3' to -7' (2/17/06)16,800 pCi/I @ -13' to -17' (2/17/06)16,000pCi/l

@ -23' to -25.5' (2/17/06)30,010 pCi/l @ -37' to -42' (2/17/06)Split Sample MW-38 Results: In service Continue periodic sampling Fitzpatrick Result: 985 pCiA (12/08/05)

Teledyne ND (<346 pCiA) (2/8/06)Non Split- Fitzpatrick Results only Fitzpatrick Result: N.D. (12/30/05)

Fitzpatrick Result: 1008 pCiA (01/10/06)

Fitzpatrick Result: 758 pCiIL (01/19/06)

Fitzpatrick Result: 1,444 pCiIL( 01/25/06)MW-48

  • South Prop. Boundary In Service ND [<342 pCi/li (2/8/06)250 pCi/I (2/8/06) NYSDEC

-022706A MONITORING WELL STAtUS;doc Pag 3 Well Number Location Status Next Step Current Results (Highest Historical Value)MW40 MW-39 MW-46 MW-42 MW-47 MW-41 MW-45 MW43 MW44 MW-51 MW-52 Lot above Sewer Plant Well developed UI SFB /U3 RWSo Well completed U-3 Transformer Yard Drilling completed 1t- CTMTIU-2 Diesel Ar) Needs to be relocated West side of U-I Vacuumed to 7'South of U-3 RWST Drilled 35' of 65'between Aux and SFB Needs to be relocated Mouth U-3 Tank Pit /RWSReady to drill OfU3 North of SFB } Vacuumed to 7'South, upgradient to MW40 Vacuuming in progress North property boundary Determine drill area Count samples Take Samples Take Samples Relocate well Begin drilling Complete well Relocate well Drill well Drill well Drill well Vacuum evacuate ta ith -022706A MONITORING WELL STATUS.doc 4 CURRENT WELL STATUS Phase I Wells Status MW-30 Completed MW-31 Completed MW-32 Completed (Packer TestinR in progress)MW-33 Completed MW-34 Completed MW-35 Completed MW-36 Completed MW-37 Completed (Re-developing, will be ready for sampling Thursday)(in progressl MW-38 Completed Phase II Wells Sequence (see note belowl Status (Feb 22. 2006)MW-39 * %outh of Unit 1 Fuel Storage Buildinh (Developed and ready to sample)MW-40

  • Parking Lot above Sewerage Plant (Rock cave in at 27'. WaitinR to rim well with drill rik )HOLD.MW-42* (West of Unit 2 RWST_3 (needs relocation, pilot wire interference)

MW-46

  • West of Unit 3 PAB Sump Rdeveloped and ready to sample)MW-41 South of Unit 3 RWST) (Re-drilled well in new location, 35' of MW-43 outh of Unit 3 Tank Pit and RWST (Drilled casing to47' out of 65")( in MW-44 Noah of Unit 3 Fuel Storage Building (vacuumed-ready to drill)MW-45 Between Unit 3 Fuel Storage Building/P B (ready for vacuum truck) c MW-47 West of Unit I Fuel Storage Buildin (Vacuum completed)

MW-49 est side of Unit 3 Discharge Canal (Needs EngineerinR OK)MW-50 East side of Unit 3 Discharge Canal (Needs Engineering OK)MW-51 Southern property hill north of MW-40 (vacuumed-ready to drill)MW-52 Northern property boundary (Needs Engineering OK)*Note: Wells numbering 39,40, 48,42, 46 are priority wells at this time and may be drilled, developed, and sampled in a changing sequence within this subset based on depth of well considerations, equipment setup options, engineering paperwork delivery, and development status.RECENT INFORMATION:

,- K ---11-1111-1--

---I ---I --1 I- --" -

-,- -I -I --I Stacv Smith -022706A MONITORING WELL STATUS.doc Paqe 5 Ns Stacy Smith--;;~

7~,- , -022706A MONITORING WELL11,1.11-- -STA-TUS ----- ---- doc Pa"--- -I, .-ie 5 11--I-(Activity in pCi/L)MOST RECENT RESULTS (in pCi/L)MW-30 511,000 (02/07/06)

Algonquin ND (02/04/06)

MW-31 33,100 (02/07/06)

Gypsum ND (02/04/06)

MW-32 17,700 (02/07/06)

Trap Rock ND (02/04/06)

MW-33 214,000 (02/07/06)

MW-34 174,000 (02/07/06)

MW-35 84,500 (02/0706)MW-36 47,500 (at 41') (02/10/06)

MW-lll 238,000 (02/07/06)

TREND INFORMATION DATE: 11/22/05 12/13-16 12/19/05 12/30/05 01/06/06 01/13/06 01/20/06 01/27/06 02/01/06 MW-30: 464,000-601,000 119,000-319,000 (1/30/06)MW-31: 4,061 4,030 656-2,160 7910 22,100 MW-32: 3,720 7,110-11,110 well not available MW-33: 142,000 199,000 220,000 189,000 232,000 226,000 242,000 250,000 MW-34: 63,900 121,000 147,000 159,000 131,000 211,000 212,000 224,000 MW-35: 42,300 76,000 80,500 95,400 97,800 104,000 38,700 51,300 MW-ill: 296,000 192,000 212,000 113,000 199,000 119,000 Recounting 295,000 MW-38: Most recent Split Sample results: 985 (Fitzpatrick 12/08/05))

701 State of New York (12/08/05)

Most recent Fitzpatrick results: Not detected (Fitzpatrick 12/30/05)1,008 (Fitzpatrick 01/10/06)758 (Fitzpatrick 01/19/06)1,440 (Fitzpatrick 01/25/06)

E Stcv Sith- 02706A MONITORINGWELL TAfOS~.d-c-Stacy-Smih---0227-MONITORNG-WELL -A-US-cPage 6 Unit 2 Storm Drain Jan 19,2006 (pCi/1) Jan 24, 2006 Jan 30.2006 Feb 16, 2006 MHI (U-2 riverfront)

ND MH2 (U-2 riverfront)

ND ND ND ND MH3 (North end of U-2 Turbine) 2,240 2,190 1700 MH4 (Entrance to U2 Transformer Yard) 3,780 1,180 3030 MH5 (Aux Feed Bldg)- 3,570 1,070 4040 MH6 (U2 Transformer Yard) 18,600 50,500 8770 MH7(U2 Transformer Yard) 3,840 7,300 ND MH8 (U2 Transfonner Yard) 3,210 9,580 ND MH12 (U2 Riverfront)

ND ND ND MH14 (U2 Riverfront)

ND ND ND CB 15 (U2 Riverfront)

ND ND ND Unit 3 Storm Drain Manholes taken Jan 19, 2006 (WCi/I): A2 (Near U-3 Si ND A4 (Near U-4WST) 1,190 A6 (Near U-3WWST) 686 B5 (Entrance to 3 Transformer Yard) 3,320 El (Unit 3 Roadway t Security Post) ND E2 (Unit 3 Roadway tof ecurity Post) ND E2B (Unit 3 Roadway Security Post) ND 0s E3 (Unit 3 Roadway to ;ecurity Post) ND E3A (Unit 3 Roadway t4crity Post) ND Stacy S 00A MONTOR WELLPage71 TREND COMPARISON Unit 3 Storm Drain Locations 01/19/06 01/17/06 01/12/06 A2 UWST ND A4 U RWST 1,190 A6 U RWST 686 B 1 U-3 Transformer Yard 5010 4530 B3 U-3 Transformer Yard 4650 6280 B4 U-3 Transformer Yard 3600 3180 B5 U-3 Transformer Yard 3,320 B6 U-3 Transformer Yard ND B7 U-3 Transformer Yard 2690 2510 B8 U-3 Transformer Yard ND Cl U-3 North of Service Bldg 867 997 D2 U-3 South of Service Bldg ND ND E4 U-3 Access Road to Command Post ND El U3 Access Road to Command Post ND E2 U3 Access Road to Command Post ND E2B U3 Access Road to Command Post ND E3 U3 Access Road to Command Post ND E3A U3 Access Road to Command Post ND E4A U-3 Access Road to Command Post ND E5 U-3 Access Road to U3 Command Post ND ESA U-3 Access Road to U3 Command Post ND E6 U-3 Access Road to U3 Command Post ND E7 U-3 Access Road to U3 Command Post ND