| author name = Ford B
| author name = Ford B
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Buckberg P H
| addressee name = Buckberg P
| addressee affiliation = NRC/NRR/ADRO/DLR
| addressee affiliation = NRC/NRR/ADRO/DLR
| docket = 05000293
| docket = 05000293

Revision as of 03:12, 13 July 2019

E-MAIL: (PD) Draft Program Detail Pilgrim ACRS Subcommitte Presentation.Ppt
ML071020296
Person / Time
Site: Pilgrim
Issue date: 03/28/2007
From: Ford B
Entergy Nuclear Operations
To: Perry Buckberg
NRC/NRR/ADRO/DLR
References
TAC MD3698
Download: ML071020296 (7)


Text

Per begDafi Pilgrim ACRS Subcommittee presentation.ppt Pagel1 From: To: Date:

Subject:

"Ford, Bryan" <BFord@entergy.com>"Perry Buckberg" <PHB1 @nrc.gov>3/28/2007 12:49:13 PM Draft Program Detail Pilgrim ACRS Subcommittee presentation.ppt FYI<<ENI Slides for Pilgrim ACRS Subcommittee presentation.ppt>>

§At~p\GW }00004.TM P Page i7j Mail Envelope Properties (460A9C7A.160:

12 : 45408)

Subject:

Creation Date From: Created By: Draft Program Detail Pilgrim ACRS Subcommittee presentation.ppt 3/28/2007 12:48:53 PM"Ford, Bryan" <BFord@entergy.com>

BFord@entergy.com Recipients nrc.gov OWGWPO01 .HQGWDO01 PHB 1 (Perry Buckberg)Post Office OWGWPO01.HQGWD01 Files MESSAGE ENI Slides for Pilgrim ACRS Mime.822 Route nrc.gov Size Date & Time 72 3/28/2007 12:48:53 PM Subcommittee presentation.ppt 78848 110620 Options Expiration Date: Priority: ReplyRequested:

Return Notification:

Concealed

Subject:

Security: None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled Pilgrim LR Project 14 Programs in Place w/o Enhancement Boraflex Monitoring Program BWR Penetrations Program Containment Leak Rate Program Fatigue Monitoring Program In-service Inspection Program Masonry Wall Program Water Chemistry Control -BWR Program BWR Feedwater Nozzle Program BWR Vessel ID Attachment Welds Program Environmental Qualification of Electric Components Program Flow-Accelerated Corrosion Program Reactor Head Closure Studs Program Water Chemistry Control -Auxiliary Systems Program Water Chemistry Control -Closed Cooling Water Program-Entergy Pilgrim LR Project 16 Programs Require Enhancement" Enhancements for 4 Programs Planned by 12/31/08-Fire Protection Program Enhancements

-Oil Analysis Program Enhancements

-Service Water Integrity Program Enhancements

-System Walkdown Program Enhancements" Enhancements for 7 Programs Planned by 12/31/09-Bolting Integrity Program Enhancements

-BWR Stress Corrosion Cracking Program Enhancements

-Diesel Fuel Monitoring Program enhancements

-Instrument Air Quality Program Enhancements

-Reactor Vessel Surveillance Program Enhancements

-Structures Monitoring Program Enhancements

-Water Control Structures Monitoring Program Enhancements

-Ente-gy Pilgrim LR Project 16 Programs Require Enhancement (Cont.)Enhancements for 2 Programs Planned by 12/31/10-Fire Water System Program Enhancements

-Containment In-service Inspection Program Enhancements

  • Enhancements for 3 Programs Planned by 12/31/11-BWR CRD Return Line Nozzle Program Enhancements

-BWR Vessel Internals Program Enhancements

-Periodic Surveillance and Preventive Maintenance Program Enhancements

-. Entergy Pilgrim LR Project 10 New Programs 4 New Programs Planned Implementation by 12/31/09-Buried Piping and Tanks Inspection Program-Heat Exchanger Monitoring Program-Metal-Enclosed Bus Inspection Program-Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) Program* 3 New Programs Planned Implementation by 12/31/10-Non-EQ Inaccessible Medium-Voltage Cable Program-One-Time Inspection Program-Selective Leaching Program-Entergy Pilgrim LR Project 10 New Programs (Cont.)* 3 New Programs Planned Implementation by 12/31/11-Non-EQ Instrumentation Circuits Test Review Program-Non-EQ Insulated Cables and Connections Program-Non-EQ Bolted Cable Connections Program-Entergy