IR 05000454/2013503: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 12/19/2013 | | issue date = 12/19/2013 | ||
| title = IR 05000454-13-503; 05000455-13-503; 11/18/2013 - 11/22/2013; Byron Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection | | title = IR 05000454-13-503; 05000455-13-503; 11/18/2013 - 11/22/2013; Byron Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection | ||
| author name = Skokowski R | | author name = Skokowski R | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000454, 05000455 | | docket = 05000454, 05000455 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:December 19, 2013 | ||
== | ==SUBJECT:== | ||
BYRON STATION, UNITS 1 AND 2, NRC BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000 454/20 13 503; 05000 455/20 13503 | |||
==Dear M r. Pacil io:== | ==Dear M r. Pacil io:== | ||
Line 33: | Line 32: | ||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50 | /RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 | ||
-454; 50-455 License Nos. NPF | |||
-37; NPF-66 | |||
===Enclosure:=== | |||
==Inspection Report== | ==Inspection Report== | ||
05000 454/20 13503; 05000455/2 0 13503 w/Attachment: Supplemental Information | 05000 454/20 13503; 05000455/2 0 13503 w/Attachment: Supplemental Information | ||
REGION III== | |||
Docket No s: 50-454; 50-455 License Nos: NPF-37; NPF-66 Report No: 05000 454/2013 503; 05000 455/2013 503 Licensee: Exelon Generation Company, LLC Facility: Byron Station, Units 1 and 2 Location: Byron, IL Dates: November 18 | Docket No s: 50-454; 50-455 License Nos: NPF-37; NPF-66 Report No: 05000 454/2013 503; 05000 455/2013 503 Licensee: Exelon Generation Company, LLC Facility: Byron Station, Units 1 and 2 Location: Byron, IL Dates: November 18 | ||
- 22, 2013 Inspectors: | - 22, 2013 Inspectors: |
Revision as of 18:29, 21 June 2019
ML13354B662 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 12/19/2013 |
From: | Richard Skokowski Plant Support Branch II |
To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
Robert Jickling | |
References | |
IR-13-503 | |
Download: ML13354B662 (12) | |
Text
December 19, 2013
SUBJECT:
BYRON STATION, UNITS 1 AND 2, NRC BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000 454/20 13 503; 05000 455/20 13503
Dear M r. Pacil io:
On November 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Byron Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 22, 2013, with Mr. B. Youman and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
Inspection Report
05000 454/20 13503; 05000455/2 0 13503 w/Attachment: Supplemental Information
REGION III==
Docket No s: 50-454; 50-455 License Nos: NPF-37; NPF-66 Report No: 05000 454/2013 503; 05000 455/2013 503 Licensee: Exelon Generation Company, LLC Facility: Byron Station, Units 1 and 2 Location: Byron, IL Dates: November 18
- 22, 2013 Inspectors:
R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector J. McGhee, Senior Resident Inspector N. Valos, Senior Reactor Analyst Approved by:
R. Skokowski, Chief Plant Support Branch Division of Reactor Safety 1 Enclosure
SUMMARY OF FINDINGS
IR 05000454/2013 503; 05000455/20 13503; 11/18/2013 - 11/22/2013; Byron Station, Units and 2; Baseline Emergency Preparedness Biennial Exercise Inspection.
This report covers a one-week period of announced baseline inspection by three regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
A. NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
B. Licensee-Identified Violations
None
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation (71114.01)
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the November 20, 2013, biennial emergency preparedness exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills' scenarios were sufficiently different from the scenario used in the November 20, 2013, exercise.
The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
Control Room Simulator (CRS);
Technical Support Center (TSC);
and Emergency Operations Facility (EOF)
. The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.
The inspectors attended post
-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self
-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self
-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01
-06.
b. Findings
No findings were identified.
3 Enclosure
1EP 8 Exercise Evaluation
- Scenario Review (71114.08)
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in
-office review of the exercise objectives and scenario s submitted to the NRC using IP 71114.08, "Exercise Evaluation
- Scenario Review," to determine if the exercise would test major elements of the Emergency Plan , as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
The inspectors reviewed various documents
, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08
-06.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
(71151)
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the third quarter 201 3. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre
-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one Drill/Exercise Performance sample as defined i n IP 71151-05.
b. Findings
No findings were identified.
4 Enclosure
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the third quarter 201 3. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2012 through the third quarter 201 3. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151-05.
b. Findings
No findings were identified.
5 Enclosure
4OA6 Management Meetings
.1 Exit Meeting Summary
On November 22, 2013, the inspectors presented the biennial exercise inspection results to Mr. B. Youman and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Attachment
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
T Licensee
- B. Youman, Plant Manager
- G. Armstrong, Security Manager
- B. Barton, Radiation Protection Manager
- T. Chalmers, Operations Director
- A. Daniels, Corporate Emergency Preparedness Manager
- S. Gackstetter, Regulatory Assurance Manager
- B. Jacobs, Project Management Manager
- R. Kartheiser, Emergency Preparedness Coordinator
- R. Lloyd, Emergency Preparedness Manager
- L. Wehner, Nuclear Oversight Manager
- L. Zurawski, Compliance Engineer
Nuclear Regulatory Commission
- J. McGhee, Senior Resident Inspector
- J. Robbins, Resident Inspector LIST OF ITEMS OPENED, CLOSED, AND DISCUS
SED Opened, Closed, and Discussed
None
Attachment
LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector
s reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
1EP1 Exercise Evaluation
- EP-AA-1000; Exelon Standardized Radiological Emergency Plan; Revision 24
- EP-AA-1002; Radiological Emergency Plan Annex for Byron Station; Revision 32
- EP-AA-110; Assessment of Emergencies; Revision 9
- EP-AA-110-200; Dose Assessment; Revision 6
- EP-AA-111; Emergency Classification and Protective Action Recommendations; Revision 18
- EP-AA-112; Emergency Response Organization (ERO)/Emergency Response Facility Activation and Operation; Revision 16
- EP-AA-113; Personnel Protective Actions; Revision 11
- EP-AA-114; Notifications; Revision 11
- Two Years of Drill and Exercise ARs; July 2011
- November 2013
- Two Years of Drill and Exercise Scenario Timelines; July 2011
- November 2013
- AR 01588554; Exercise
-EOF Communicator Delayed Notification of Change in Classification to NRC; November 21, 2013
- AR 01588547; Exercise
-OSC Team Priorities and Delayed Dispatch; November 21, 2013
- AR 01588546; Exercise
-TSC Emergency HVAC Mode Initiation Delayed; November 21, 2013
- AR 01588541; Exercise
-TSC Briefings/Updates Inconsistent and Omitted Some Detail
- November 21, 2013
- AR 01588535; Exercise
-Simulator Site Accountability/Assembly Was Delayed; November 21, 2013 - AR 01582733; Pre
-Exercise-TSC Delayed Accountability/Assembly, Dose Projection Problems, and Ventilation
Emergency Mode
Delayed; November 8, 2013
1EP8 Exercise Evaluation
- Scenario Review
- Byron Station 2013 NRC Graded Exercise Manual
- September 20, 2013 4OA1 Performance Indicator Verification
- LS-AA-2110; Monthly Data Elements for
NRC Emergency Response Organization (ERO) Drill Participation; Revision 6
- LS-AA-2120; Monthly Data Elements for NRC Drill/Exercise Performance; Revision 4
- LS-AA-2130; Monthly Data Elements for NRC Alert and Notification System (ANS) Reliability; Revision 5 - ERO Drill Participation; June 2012 - September 2013
- DEP Opportunities; April 2012
- September 2013
- ANS Reliability; April 2012
- September 2013
Attachment
LIST OF ACRONYMS USE
D ADAMS Agencywide Documents Access and Management System
ANS Alert and Notification System
CFR Code of Federal Regulations
CRS Control Room Simulator
DRS Division of Reactor Safety
EOF Emergency Operations Facility
ERO Emergency Response Organization
IP Inspection Procedure
IR Inspection Report
NEI Nuclear Energy Institute
NRC U.S. Nuclear Regulatory Commission
PARS Publicly Available Records System
PI Performance Indicator
SDP Significance Determination Process
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Co., LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Road
WARRENVILLE, IL 605
SUBJECT: BYRON STATION, UNITS
AND 2, NRC
BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2013503; 05000455/2013503
Dear Mr. Pacilio:
On November 22, 2013, the
- U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Byron Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 22, 2013, with Mr. B. Youman and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this
letter and its
Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/
Richard
- A. Skokowski, Chief
Plant Support Branch
Division of Reactor Safety
Docket Nos. 50
-454; 50-455 License Nos. NPF
-37; NPF-66 Enclosure:
Inspection Report 05000454/2013503; 05000455/2013503
w/Attachment: Supplemental Information
cc w/encl:
Distribution via ListServŽ
Distribution:
See next page
DOCUMENT NAME: Byron 2013 503 EP RDJ.docx
Publicly Available
Non-Publicly Available
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII NAME RJickling:
bl DFunk RSkokowski
DATE 12/18/20 13 12/18/20 13 12/19/20 13 OFFICIAL RECORD COPY
Letter to Michael Pacilio
from Richard
SUBJECT: BYRON STATION, UNITS 1 AND
2, NRC BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000 454/20 13503; 05000 455/20 13503 DISTRIBUTION
RidsNrrDorlLpl3
-2 Resource
RidsNrrPMByron Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Anne Boland
DRPIII DRSIII Tammy Tomczak
Patricia Buckley
ROPreports.Resource@nrc.gov