IR 05000445/2015301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/02/2015
| issue date = 04/02/2015
| title = Examination Report 05000445/2015301; 05000446/2015301
| title = Examination Report 05000445/2015301; 05000446/2015301
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Flores R
| addressee name = Flores R
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter: April 2, 2015  
{{#Wiki_filter:April 2, 2015


Mr. Rafael Flores, Senior Vice President
==SUBJECT:==
 
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301
and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant
 
P.O. Box 1002
 
Glen Rose, TX 76043 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301


==Dear Mr. Flores:==
==Dear Mr. Flores:==

Revision as of 01:39, 21 June 2019

Examination Report 05000445/2015301; 05000446/2015301
ML15093A110
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/02/2015
From: Vincent Gaddy
Operations Branch IV
To: Flores R
Luminant Generation Co
S. Hedger
References
50-445/15-301, 50-446/15-301
Download: ML15093A110 (4)


Text

April 2, 2015

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301

Dear Mr. Flores:

On March 9, 2015, Garry Struble, Simulator and Licensing Examination Manager, notified the U.S. Nuclear Regulatory Commission's (NRC) Region IV's staff via electronic mail that the initial retake examination scheduled at Comanche Peak Nuclear Power Plant for the week of March 23, 2015, was no longer needed. This retake examination included a written examination for two reactor operator applicants.

Mr. Kenneth Peters of your staff formally cancelled the examination by letter to Marc Dapas, Regional Administrator, dated March 12, 2015. Per the request, applications for the two reactor operator applicants have been withdrawn. The examination development process was cancelled after the completion of the draft examination review process at your request; however, the portions of the examination that were reviewed with comments provided to your staff will be included in the NRC's Agencywide Documents Access and Management System (ADAMS).

No findings were identified during this examination.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety

Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

cc: Electronic Distribution to Comanche Peak Nuclear Power Plant In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety

Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 cc: Electronic Distribution to Comanche Peak Nuclear Power Plant

Distribution See next page

CP-201503 Exam Report-sdh.docx ADAMS Accession Number: ML15093A110 SUNSI Review By: VGG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB OE:OB NAME SHedger VGaddy SIGNATURE /RA/ /RA/ DATE 4/1/15 4/2/15 OFFICIAL RECORD COPY

Letter to Rafael Flores from Vincent G. Gaddy, dated April 2, 2015

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301

DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) Senior Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant (Rhonda.Smith@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Project Engineer, DRP/A (Margaret.Tobin@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)