| issue date = 09/30/1994
| issue date = 09/30/1994
| title = LER 94-005-00:on 940901,TS Surveillance Violation Occurred. Caused by Personnel Error During Sample Analysis Process. Individuals Involved in Incident Counseled & Event Reviewed W/Applicable E&C personnel.W/940930 Ltr
| title = LER 94-005-00:on 940901,TS Surveillance Violation Occurred. Caused by Personnel Error During Sample Analysis Process. Individuals Involved in Incident Counseled & Event Reviewed W/Applicable E&C personnel.W/940930 Ltr
| author name = DONAHUE J W, VERRILLI M
| author name = Donahue J, Verrilli M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:16, 18 June 2019

LER 94-005-00:on 940901,TS Surveillance Violation Occurred. Caused by Personnel Error During Sample Analysis Process. Individuals Involved in Incident Counseled & Event Reviewed W/Applicable E&C personnel.W/940930 Ltr
ML18011A601
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1994
From: Donahue J, Verrilli M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-941071, LER-94-005-02, LER-94-5-2, NUDOCS 9410070254
Download: ML18011A601 (6)


Text

(ACCELER:KTED RIDS Pl<OCI'.SSli'G'EGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9410070254 DOC.DATE: 94/09/30 NOTARIZED-NO FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VERRILLI,M.

Carolina Power&Light Co.DONAHUE,J.W.

Carolina Power&Light Co.RECIP.NAME RECXPIENT AFFILIATION

SUBJECT:

LER 94-005-00:on 940901,TS surveillance violation occurred.Caused by personnel error during sample analysis process.Individuals involved in incident counseled&event reviewed w/applicable E&C personnel.W/940930 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR t ENCL SIZE-TITLE: 50.73/50.9 Licensee Event Report (LER), Knciden Rpt, etc.DOCKET 05000400 P R NOTES:Application for permit renewal filed.05000400 RECIPXENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSXR/EIB

EXTERNAL EG&G BRYCE I J~H NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD~OAB/ESP ILE'ENTER 2 HR/D MEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPLB NRR/PMAS/IRCB-E RGN2 FILE 01 L ST LOBBY WARD NOAC POORE,W.NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2,2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Y p 0~C U, N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI TIRE DOCl'MENT CONTROL DESK, ROOM PI-37 (EXT.504-2083)TO ELI NIINATE YOUR NAif E FROif DISTRIBUTION LISTS I:OR DOCL'MEN'I'S YOU DON"I'LED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 27 Carolina Power&Light Company Harris Nvdear Plant PO Box 165 New Hill NC 27562 gyp q 0 19%Letter Number: HO-941071 U.S.Nuclear Regulatory Commission ATI'N: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 LICENSEE EVENT REP RT 4-Gentlemen:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted.

This report fulfills the requirement for a written report within thirty (30)days of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September 1983.Sincerely, J.W.nahue General Manager Harris Plant MV Enclosure CC: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRC-PM/NRR)Mr.J.E.Tedrow (NRC-SHNPP)Mr.W.R.Robinson 94100702S4 940930 PDR ADDCK 05000400 PDR State Road 1134 New Hill NC ggt NRC FOBH 366 (5-92)U.S.NUCLEAR REGULATORY CQBIISSION LICENSEE EVENT REPORT (LER)(See reverse for required nunber of digits/characters for each block)APPROVED BY (NB NO.3150-0104 EXPIRES 5/3'I/95 ESTIMATED BURDEN PER RESPONSE To COMPLY IJITH THIS IMFORHATIOH COLLECTIOH REQUEST: 50.0 HRS.FORMARD CQNEHTS REGARDING BURDEN ESTIHATE To THE INFORHATIOH AMD RECORDS HAMAGEHENT BRANCH (HMBB 7714), U.S.NUCLEAR REGULATORY COMMISSIONS

'MASHINGTOH, DC 20555-0001 AND To THE PAPERlJORK REDUCTIOH PROJECT (3140-0104), OFFICE OF HANAGEMEMT AMD BUDGET llASHINGTOM DC 20503.FACILITY NAME (1)Shearon Harris Nuclear Plant-Unit

¹1 DOCKET IkMBER (2)05000/400 PAGE (3)1 OF 3 TITLE (4)Technical Specification surveillance violation due to failure to perform an analysis of a batch release prior to the release.MONTH DAY YEAR EVENT DATE (5)YEAR LER NWBER (6)SEQUENTIAL NUMBER REVISION NUMBER HOMTH DAY YEAR REPORT DATE (7 DOCKET NUHBER 05000 FACILITY NAHE OTHER FACILITIES INVOLVED (8)9 01 94 94-005 00 30 FACILITY MAHE DOCKET NUMBER 05000 OPERATING INX)E (9)P(NER LEVEL (10)100K 20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v)

X THIS REPORT IS SUBMITTED PINSUANT 20.402(b)20.405(a)(1)(i).20.405(a)(1)(ii) 20.405(c)50.36(c)(1)50.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2)(iii) 50.73(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 73 71(b)73.71(c)OTHER (specify in Abstl'act beloM and in Text, MRC Form 366A)To THE REOUIRBKNTS OF 10 CFR Check one or more 11 MAHE LICENSEE CONTACT FOR THIS LER (12 Michael Verrilli Sr.Specialist

-Licensing TELEPHOHE NUMBER (Include Area Code)(919)362-2303 GNPLETE ONE LINE FOR EACH CQIPONENT FAILURE DESCRIBED IN THIS REPORT 13)CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE TO HPRDS CAUSE SYSTEH COMPONENT HANUFACTURER REPORTABLE To HPRDS SUPPLEMENTAL REPORT EXPECTED (14 YES (If yes, complete EXPECTED SUBHISSIOM DATE).EXPECTED SNN ISSIQI DATE (15)MONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten Lines)(16)On September 1, 1994, it was discovered that the contents of the Treated Laundry&Hot Shower Tank (TL&HS)"A" had been released prior to an analysis being performed as required by Technical Specification (TS)Surveillance Reouirement 4.11.1.1.1.

This constitutes a violation of the TS surveillance requirement and is being reported in accordance with 10CFR50.73.

The cause of this event was personnel error during the sample analysis process.A grab sample of the TL&HS Tank"A" was obtained in preparation for the release and was placed into detector¹2 of a multiple channel analyzer.However, data acquisition (sample analysis)was performed on detector¹1, which was empty at the time.The analysis results of the empty detector were then used to complete the release permit for the TL&HS Tank"A" and to establish the alarm setpoints for, the release path radiation monitor.Immediate corrective actions were to correctly reanalyze the sample and revise the release permit to indicate the actual activity that was released from the tank.The personnel directly involved were counseled.

The event was also reviewed with other applicable E&C personnel to reemphasize the need for good self-checking techniques and to stress attention to detail.Additional corrective actions will include an evaluation to determine if human factor enhancements can be made to alleviate this problem in the future.There were no adverse safety consequences as a result of this event.The analysis of the TL&HS grab sample indicated no abnormal radioactivity levels.Additionally, the TL&HS radiation monitor alarm setpoints were set at a value more conservatively than had they been set using the correct sample results.Also, the radiation monitor operated for the duration of the release and indicated no adverse levels of radioactivity.

MRC FORM A (-92)

NRC FC'RH 366A (5-92)U.S.NUCLEAR REGULATORY CQIII SSION LICENSEE EVENT REPORT (LER)t APPROVED BY (NB NO.3150-0104 EXPIRES 5/31/95 EST IHATED BURDEN PER RESPONSE TO COHPLY WITH THIS IHFORHATIOH COLLECTION REQUEST: 50.0 HRS.FORWARD COHHEHTS REGARDIHG BURDEN ESTIHATE TO THE IHFORHATIOH AHD RECORDS NAHAGEHENT BRANCH (HHBB 7714), U.S.NUCLEAR REGULATORY CONHISSIOH, WASHINGTON, DC 20555-0001 AHD TO THE PAPERWORK REDUCTION PROJECT (3140-0104), OFFICE OF NANAGEHEHT AHD BUDGET WASHINGTON DC 20503.FACILITY NAHE (1)Shearon Harris Nuclear Plant-Unit¹1 DOCKET lANBER 2)05000/400 94 LER NINBER 6)SEQUEHTIAL REVI SIOH PAGE 3)2 OF 3 TEXT If more s ace is r ulred use additional co les of HRC Form 366A (17)EVENT D CRIPTION: On August 28, 1994, Environmental

&Chemistry (E&C)personnel were requested to sample the Treated Laundry&Hot Shower (TL&HS)Tank"A" for pH in preparation for a release of its contents.The sample was collected and at 0800 Radwaste personnel were notified of the results.Following pH adjustments, the TL&HS Tank"A" was again sampled at 1300.The sample was then prepared for analysis in accordance with RCP-660 (Sample Preparation for Determination of Radioactivity).

The E&C Technician.

performing this activity placed the sample in detector¹2 of a multiple channel analyzer, however, when he logged into the Data Acquisition System to begin the analysis, he mistakenly logged into detector¹1 instead-of detector¹2.Detector¹1 was empty during the analysis process.The analysis results (from the empty detector)were used to complete the release permit at 1630 and to establish the alarm setpoints for the radiation monitor on the release pathway.Release of the TL&HS Tank"A" started at 2017 and ended at 0635 the next morning.On August 29, 1994, at 0700, a print-out was obtained of Radiation Monitor 3540 (TL&HS Tank Pump Monitor)response for the previous twenty-four hours to review'hourly'trends.

Routinely, the expected monitor response is calculated for each batch liquid release that is discharged and compared to actual monitor response recorded during the release.This is a new trending program that has been recently implemented to verify proper monitor response.An E&C Specialist updated the database for the calculated monitor response versus actual monitor response.He then observed a significant difference between the two responses and requested the TL&HS Tank"A" sample be reanalyzed.

The results of the reanalysis indicated that the initial analysis was incorrect.

Further evaluation revealed that the counting room submittal form with the initial analysis indicated the sample had been counted on Detector¹2.The computer printout of the sample results also showed that detector¹1 was used instead of detector¹2.The posted release data was subsequently revised using the correct analysis results.On August 30, 1994, the E&C Specialist began an evaluation of the Technical Specifications to determine compliance.

Since the setpoint used for the radiation monitor was proven conservative, it was determined at that time that no compliance issue existed.However, upon additional investigation, it was determined that this condition constituted a TS surveillance requirement violation and would be reported in accordance with 10CFR50.73.

~CA J~E'he cause of this event was personnel error during the sample analysis process.Proper self-checking techniques were not used to ensure that the Data Acquisition System was aligned to the correct detector.NRC FORN 3 A (5-92)

NRC FORH 366A (5-92)LICENSEE EVENT REPORT (LER)t APPROVED BY QNI NO.3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY MITH THIS INFORHATIOH COLLECTION REQUEST: 50.0 BR'ORMARD COHHEHTS~REGARDIHG BURDEN ESTIMATE TO THE IHFORNATION AHD RECORDS HANAGEHENT BRANCH (HHBB 7714), U.S.NUCLEAR REGULATORY COHHISSIONi MASHIHGTON, DC 20555-0001 AHD TO THE PAPERMORK REDUCTION PROJECT (3140 0104), OFFICE'OF HANAGENENT AND BUDGET MASHINGTOH DC 20503.FACILITY NAHE (1)Shearon Harris Nuclear Plant-Unit//1 DOCKET NUBBER (2 05000/400 YEAR 94 LER HINBER 6)SEQUENTIAL REVI SIOH PAGE (3)3 OF 3 TEXT tf more s ce is r ired use additional co ies of HRC Form 366A (17)AFETY IGNIFICAN E: There were no adverse safety consequences as a result of this event.This is based on the fact that the analysis of the TL&HS grab sample indicated no abnormal radioactivity levels and that the TL&HS radiation monitor functioned as required through the duration of the release (with a conservative alarm setpoint installed) and indicated no abnormal levels of radioactivity.

RRECTIVE A TI N: 1.The E&C individuals involved in this incident were counseled.

The event was also reviewed with other applicable E&C personnel to reemphasize the need for good self-checking techniques and to stress attention to detail.2.An evaluation of the sample analysis process will be performed to identify possible human factors enhancements to prevent recurrence of this type event.EII INFORMATI N.NRC FORH A (-92)