ML18011A605: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/30/1994
| issue date = 09/30/1994
| title = Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant.W/941011 Ltr
| title = Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant.W/941011 Ltr
| author name = ROBINSON W R, ROGERS S
| author name = Robinson W, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:16, 18 June 2019

Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant.W/941011 Ltr
ML18011A605
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-079, HNP-94-79, NUDOCS 9410200096
Download: ML18011A605 (7)


Text

P RI(DURITY (ACCELERATED RIDS PROCESSIiC REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION'NBR:9410200096 DOC-DATE'3'4+9gg'0 NOTARXZED-NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.ROBINSON,W.R.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 P

SUBJECT:

Monthly operating rept ept 1994 for Shearon Harris Nuclear Power Plant.W 941011 ltr.DXSTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SXZE: TITLE: Monthly Operating Report: (per Tech Specs)NOTES:Application for permit renewal filed.05000400 R RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS FXLK~C NTER EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DORS/OEAB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT TI IE DOC!'ifENT CONTROL DESK, ROONI Pl-37<EXT.504-2083)TO ELI Nfl%ATE YOUR N'AifE FROXI DIS FR!II U nON LISTS I OR DOC!.'@EN I'S YOI: Doi"I'L'I'.I)!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant QGT 11 196 File: H0-941083 Serial HNP-94-079 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power&Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1994.Sincerely, W.R.Robi son SGR:syh Enclosure c:, Mr.S.D.Ebneter (NRC-RII)Mr.S.A.Elrod (NRC-SHNPP)

Mr.N.B.Le (NRR)ry~EBUO3i ct'41020006 940930 PDR ADOCK 05000400 PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 91936-6950

~v I United States Nuclear Re ulatory Commission Page 2 bc: Mr.T.A.Baxter, Esq.Ms.C.M.Brown Mr.R.K.Buckles (LIS)'r.W.R.Campbell Mr.H.W.Habermeyer, Jr.Ms.T.A.Head (GLS File)Mr.M.,D.Hill Mr.W.J.Hindman Mr.R.D.Martin Admiral K.R.McKee Mr.W.S.Orser Mr.G.A.Rolfson Mr.R.S.Stancil Nuclear Records File: HI/A-2D

~'I e P~sT CP4L,CO RUN DATE 10/03/94 RUN TIME.15:46s51 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 Enclosure to Serial HNP-94-079 Sheet I of 2 OPERATING STATUS DOCKET NO.050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362 2573 l.UNIT NAKE: HARRIS UNIT 1 2.REPORTING PERIOD: SEPTEMBER 94 3.LICENSED THERMAL POWER (MWT)t 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE)c 900.0 I NOTES 6'AX DEPENDABLE CAPACITY (GROSS MWE)(920'0 I 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE MASONS'.POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE)i 10.REASONS FOR RESTRICTION IF ANYc THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OP HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LZNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17~CROSS ELEC.ENERGY GENe (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVZCE FACTOR 20.UNIT AVAILABILITY PACTOR 21 o UNIT CAP FACTOR (USING MDC NET)22.UNIT CAP.PACTOR (USING DER NET)23m UNIT FORCED OUTAGE PJ'.TE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 720.00.00 720 F 00.00 1993684.32 659618.00 620065.00 100.00 100.00 100.14 95.69.00 (TYPEp DATE, 6551.00 65016.00 5286'0 53589.01 F 00 ,00 5245.13 53022.76 F 00.00 14258413.98 141517067.

944720230.00 47154451 F 00 4404159 F 00 43937556.00 80.07 81.55 80.07 81.55 78.17 78.58 74.70 75.09~00 3.02 AND DURATION OF EACH)s 25'P SHUTDOWN AT END OF REPORT PERIODS ESTIMATED DATE OP START UPs 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)(FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 MZS/MTH-OPR.RPT/3/OS4

~~V CPCL CO RUN DATE 10/03/94 RUN TIME 15:46:51 PLANT PERFORMANCE DATA SYSTEM APPENDIX B" AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 Enclosure to Serial HNP-94-079 Sheet 2 of 2 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1994 DAY AVG.DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)852 17 854 2 863 18 819 866 19 866'67 20 867 868 21 868 863 22 867 861 23 866 863 24 865 860 25 862 10 860 26 857 861 27 861 12 864 28 864 13 862 29 867 14 860 30 870 859 16 856 1.16-8 NOTE: There were no significant power reductions during the month of September.

HIS/MTH-OPR.RPT/4/084