Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant.W/941011 Ltr
ML18011A605
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-079, HNP-94-79, NUDOCS 9410200096
Download: ML18011A605 (7)


Text

P RI(DURITY (ACCELERATED RIDS PROCESSIiC REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION 'NBR:9410200096 DOC-DATE '3'4+9gg'0 NOTARXZED- NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co. P ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept ept 1994 for Shearon Harris Nuclear Power Plant.W 941011 ltr.

DXSTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SXZE:

TITLE: Monthly Operating Report: (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1 FXLK~C NTER 1 1 NRR/DORS/OEAB 1 1 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT TI IE DOC! 'ifENTCONTROL DESK, ROONI Pl-37 <EXT. 504-2083 ) TO ELI Nfl%ATE YOUR N'AifE FROXI DIS FR!IIU nON LISTS I OR DOC!.'@EN I'S YOI: Doi "I'L'I'.I)!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant QGT 11 196 File: H0-941083 Serial HNP-94-079 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1994.

Sincerely, W. R. Robi son SGR:syh Enclosure c:, Mr. S. D. Ebneter (NRC-RII)

Mr. S. A. Elrod (NRC-SHNPP)

Mr. N. B. Le (NRR)

EBUO3i ct'41020006 940930 PDR ADOCK 05000400 ry~

PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 91936 -6950

~v I

United States Nuclear Re ulatory Commission Page 2 bc: Mr. T. A. Baxter, Esq.

Ms. C. M. Brown Mr. R. K. Buckles (LIS)

W. R. Campbell

'r.

Mr. H. W. Habermeyer, Jr.

Ms. T. A. Head (GLS File)

Mr. M.,D. Hill Mr. W. J. Hindman Mr. R. D. Martin Admiral K. R. McKee Mr. W. S. Orser Mr. G. A. Rolfson Mr. R. S. Stancil Nuclear Records File: HI/A-2D

~ 'I e

P~ sT

Enclosure to Serial HNP-94-079 CP4L,CO PLANT PERFORMANCE DATA SYSTEM Sheet I of 2 RUN DATE 10/03/94 OPERATING DATA REPORT RUN TIME .15:46s51 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919) 362 2573

l. UNIT NAKE: HARRIS UNIT 1 I NOTES
2. REPORTING PERIOD: SEPTEMBER 94
3. LICENSED THERMAL POWER (MWT) t 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE) c 900.0 6'AX DEPENDABLE CAPACITY (GROSS MWE) ( 920'0 I
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE MASONS'.

POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE) i

10. REASONS FOR RESTRICTION IF ANYc THIS YR TO CUMUL MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 720.00 6551. 00 65016. 00
12. NUMBER OP HOURS REACTOR CRITICAL 720.00 5286 '0 53589.01
13. REACTOR RESERVE SHUTDOWN HRS .00 F 00 ,00
14. HOURS GENERATOR ON LZNE 720 00 F 5245.13 53022.76
15. UNIT RESERVE SHUTDOWN HOURS .00 F 00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1993684.32 14258413. 98 141517067. 94 17 ~ CROSS ELEC. ENERGY GENe (MWH) 659618. 00 4720230.00 47154451 00 F
18. NET ELEC. ENERGY GENERATED (MWH) 620065.00 4404159 00 F 43937556.00
19. UNIT SERVZCE FACTOR 100.00 80.07 81.55
20. UNIT AVAILABILITYPACTOR 100.00 80.07 81.55 21 o UNIT CAP FACTOR (USING MDC NET) 100.14 78.17 78.58
22. UNIT CAP. PACTOR (USING DER NET) 95.69 74.70 75.09 23m UNIT FORCED OUTAGE PJ'.TE .00 ~ 00 3.02
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPEp DATE, AND DURATION OF EACH)s 25 'P SHUTDOWN AT END OF REPORT PERIODS ESTIMATED DATE OP START UPs
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)( FORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 1.16 - 9 MZS/MTH-OPR.RPT/3/OS4

~ ~ V Enclosure to Serial HNP-94-079 CPCL CO PLANT PERFORMANCE DATA SYSTEM Sheet 2 of 2 RUN DATE 10/03/94 APPENDIX B " AVERAGE DAILY POWER LEVEL RUN TIME 15:46:51 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1994 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 852 17 854 2 863 18 819 866 19 866'67 20 867 868 21 868 863 22 867 861 23 866 863 24 865 860 25 862 10 860 26 857 861 27 861 12 864 28 864 13 862 29 867 14 860 30 870 859 16 856 1.16 - 8 NOTE: There were no significant power reductions during the month of September.

HIS/MTH-OPR.RPT/4/084