Category:Letter
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML22223A1412022-09-0101 September 2022 Issuance of Amendment No. 353 Adoption of TSTF - 505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation ML22126A1962022-05-27027 May 2022 Issuance of Amendment No. 350 Adoption of TSTF-264, Revision 0 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21364A0432022-02-28028 February 2022 Issuance of Amendment No. 348 Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21300A3552021-11-16016 November 2021 Issuance of Amendment No. 345 Adoption of TSTF-582 ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21049A3552021-04-28028 April 2021 Issuance of Amendment No. 341 Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20169A5102020-08-20020 August 2020 Issuance of Amendment No. 339 Changes to Technical Specifications Related to Primary Containment Hydrodynamic Loads ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19204A0632019-09-13013 September 2019 Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19189A0842019-08-19019 August 2019 Issuance of Amendment No. 326 Adoption of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18289A4322018-11-28028 November 2018 Issuance of Amendment No. 323 Revision to the Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML18324A6852018-11-26026 November 2018 Correction to Amendment No. 321 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values ML18194A8822018-08-24024 August 2018 Issuance of Amendment No. 321 Re: Revision to Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Revision 2, "Reactor Pressure Vessel Water Inventory Control (EPID L-2017-LLA-0311) ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18180A3722018-07-19019 July 2018 Issuance of Amendment No. 319, Revise Technical Specification Surveillance Requirement 3.6.4.1.3 to Allow Opening of Inner and Outer Secondary Containment Access Openings (CAC MG0239; EPID L-2017-LLA-0298) ML17289A1752018-03-26026 March 2018 Issuance of Amendment No. 318, Revise Emergency Plan for Emergency Response Organization Requalification Training Frequency Consistent with Exelon Fleet (CAC MG0026; EPID L-2017-LLA-0273) ML17313A0772017-11-30030 November 2017 Issuance of Amendment Application for Order Approving Direct Transfer of Renewed Facility Operating License & Independent Spent Fuel Storage Installation General License & Conforming Amendment (CAC No. MG0014; EPID L-2017-LLM-0004) ML17240A0692017-11-0707 November 2017 Nonproprietary LTR with Order Approving Direct Transfer of Renewed Facility Operating License & Independent Spent Fuel Storage Installation General License & Conforming Amendment (CAC MG0014; EPID L-2017-LLM-0004) ML17235A5402017-09-29029 September 2017 Issuance of Amendment Cyber Security Plan Implementation Schedule ML17153A0182017-06-30030 June 2017 Issuance of Amendment Emergency Plan Emergency Action Level HU1.5 ML17082A2832017-03-31031 March 2017 Issuance of Amendment Application for Order to Transfer Renewed Facility Operating License, Independent Spent Fuel Storage Installation General License, and Conforming Amendment from Entergy Nuclear to Exelon Generation CAC No. MF8293) ML17025A2882017-01-30030 January 2017 Issuance of Amendments Application for Order to Transfer Master Decommissioning Trust from PASNY to Entergy 2024-09-04
[Table view] Category:Safety Evaluation
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22223A1412022-09-0101 September 2022 Issuance of Amendment No. 353 Adoption of TSTF - 505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation ML22126A1962022-05-27027 May 2022 Issuance of Amendment No. 350 Adoption of TSTF-264, Revision 0 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21364A0432022-02-28028 February 2022 Issuance of Amendment No. 348 Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21300A3552021-11-16016 November 2021 Issuance of Amendment No. 345 Adoption of TSTF-582 ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21049A3552021-04-28028 April 2021 Issuance of Amendment No. 341 Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20169A5102020-08-20020 August 2020 Issuance of Amendment No. 339 Changes to Technical Specifications Related to Primary Containment Hydrodynamic Loads ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19189A0842019-08-19019 August 2019 Issuance of Amendment No. 326 Adoption of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance ML19135A4442019-06-21021 June 2019 Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME Code ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18360A6352019-02-25025 February 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4464; EPID No. L-2014-JLD-0049) ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18289A4322018-11-28028 November 2018 Issuance of Amendment No. 323 Revision to the Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18180A3722018-07-19019 July 2018 Issuance of Amendment No. 319, Revise Technical Specification Surveillance Requirement 3.6.4.1.3 to Allow Opening of Inner and Outer Secondary Containment Access Openings (CAC MG0239; EPID L-2017-LLA-0298) ML18039A8542018-05-30030 May 2018 Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085) ML18044A9932018-04-13013 April 2018 Request for Alternatives PRR-01, PRR-02, PRR-04, VRR-02, VRR-03, and VRR-04 from ASME OM Code Requirements for Various Pumps and Valves, Fifth 10-Year Inservice Testing Interval (CAC MG0052-MG0061; EPID L-2017-LLR-0067 to L-2017-LLR-0074) 2024-09-04
[Table view] Category:Technical Specification
MONTHYEARJAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML23095A3742023-04-0505 April 2023 Enclosure 2: Technical Specification (TS) Bases Revision 58 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21095A2972021-04-0505 April 2021 Revised Technical Specifications Bases JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-10-0202 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17104A0122017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-17-0030, Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes2017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2015-04-0808 April 2015 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal JAFP-11-0102, Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers2011-08-16016 August 2011 Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers JAFP-10-0079, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter2010-06-25025 June 2010 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2010-04-21021 April 2010 Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function2009-07-31031 July 2009 Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function JAFP-09-0087, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-07-31031 July 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...2008-09-24024 September 2008 Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... ML0816900942008-08-0707 August 2008 Technical Specification JAFP-08-0011, License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP)2008-02-0707 February 2008 License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP) JAFP-08-0006, Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-3742008-01-22022 January 2008 Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-374 JAFP-07-0091, Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-25025 July 2007 Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-07-0088, James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-07-17017 July 2007 James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)2005-05-31031 May 2005 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-04-0083, Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio2004-06-0404 June 2004 Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension2003-07-28028 July 2003 Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension ML0235000102002-12-0606 December 2002 Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) ML0222606432002-08-13013 August 2002 Technical Specifications for Amendment No. 275, Changes to the Technical Specification Leakage Limit for the Main Steam Isolation Valves from an Individual to an Aggregate Limit (Tac No. MB3333) JAFP-02-0146, Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling...2002-07-17017 July 2002 Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling... ML0219700922002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B. 3.4 Reactor Coolant System (RCS) ML0219700282002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment Table a - Administrative Changes Matrix ML0219700712002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment 4, Table L - Less Restrictive Changes Matrix ML0219700842002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219700952002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), 3.6 Containment Systems ML0219701022002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.7 Plant Systems ML0219701382002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents 2024-09-20
[Table view] Category:Amendment
MONTHYEARJAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-10-0079, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter2010-06-25025 June 2010 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2010-04-21021 April 2010 Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function2009-07-31031 July 2009 Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function JAFP-09-0087, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-07-31031 July 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...2008-09-24024 September 2008 Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... ML0816900942008-08-0707 August 2008 Technical Specification JAFP-08-0011, License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP)2008-02-0707 February 2008 License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP) JAFP-07-0091, Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-25025 July 2007 Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)2005-05-31031 May 2005 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension2003-07-28028 July 2003 Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension ML0235000102002-12-0606 December 2002 Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) ML0222606432002-08-13013 August 2002 Technical Specifications for Amendment No. 275, Changes to the Technical Specification Leakage Limit for the Main Steam Isolation Valves from an Individual to an Aggregate Limit (Tac No. MB3333) ML0219700842002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219700712002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment 4, Table L - Less Restrictive Changes Matrix ML0219700282002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment Table a - Administrative Changes Matrix ML0219700952002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), 3.6 Containment Systems ML0219701022002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.7 Plant Systems ML0219701382002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219701422002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.3 Instrumentation ML0219700922002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B. 3.4 Reactor Coolant System (RCS) JPN-02-016, Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences2002-06-0707 June 2002 Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences ML18031A0412000-04-14014 April 2000 Issuance of Amendment 261 Changes to the Technical Specifications Regarding the Allowed Containment Leakage Rate JAFP-01-0133, ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation1995-04-0707 April 1995 ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation ML17037C4561975-08-11011 August 1975 Letter Transmitting Application for Amendment to Technical Specifications to Provide Reporting Intervals and Organizational Information Consistent with Appendix a of License Nos. DPR-63 and DPR-59 2024-09-20
[Table view] |
Text
- -* .......... . .. .. . . .
- UNITED STATES . . . .. NUCLEAR REGULATORY COMMISSION . WASHINGTOl~.-0.C.
20555*0001 1/('f/l;f Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601 April 14, 2000
SUBJECT:
JAMES-A. FITZPATRICK NUCLEAR POWER PLANT-ISSUANCE OF AMENDMENT RE: CHANGES TO THE TECHNICAL SPECIFICATIONS REGARDING THE ALLOWED CONTAINMENT LEAKAGE RATE (TAC NO. MA1136)
Dear Mr. Knubel:
The Commission has issued the enclosed Amendment No. 261 to Facility Operating License No; DPR-59 for the James A. FitzPatrick Nuclear Power Plant*(JAFNPP).
The amendment consists of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated February 26, 1998, as supplemented October 14, 1999. The amendment changes the TS by changing the value of the allowable containment leakage rate to 1.5 percent per day and correcting conflicting information in TS Section 4.6.C, "Coolant Chemistry." However, the acceptance of this amendment does not relieve you from responding to the U.S. Nuclear Regulatory Commission (NRC) Generic Letter 99-02 or regulatory actions that may be proposed in the future as the NRG-Nuclear Energy Institute task force resolves the control room habitability generic issues . . A copy of the related safety evaluation is enclosed.
A Notice of Issuance wilf be included in the I Commission's next regular biweekly Federal Register notice. *-** Docket No. 50-333 Sincerely,
- I?~~ -4:;7 Guy S. Vissing, Sr. Project anager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 261 to DPR-59 2. _Safety Evaluation cc w/encls: See next page e ATTACHMENT TO LICENSE AMENDMENT NO. 261 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
- Remove Pages 139 140 191 193 ~58e 285 285a Insert Pages 139 140 191 193 258e 285 285a Replace the following pages of the Appendix B Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change Remove Page 1 Insert Page 1
- JAFNPP 3.6 (cont'd) 8. Deleted C. Coolant Chemistry
- 1. The reactor coolant system radioactivity concentration in water shall not exceed the equilibrium value of 0.2 µCl/gm of dose equivalent i-131. This limit may be exceeded, following a power transient, for a maximum of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. During this iodine activity transient the iodine concentrations shall not exceed the equilibrium limits by more than a factor of 10 whenever the main steamline isolation
- valves are open. The reactor shall not be operated more than 5
- percent of its annual power operation under this exception to the equilibrium limits. If the iodine concentration exceeds the equilibrium limit by more than a factor of 10, the reactor shall be placed in a cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, Amendment No. *179, 190, 199, ~39, 261 4.6 (cont'd) 8. Deleted C. Coolant Chemistry
- 1. a. b. C. d. 139 A sample of reactor coolant shall be taken at least every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> and analyzed for gross gamma activity.
Isotopic analysis of a sample of reactor coolant shall be made al least once/month.
A sample of reactor coolant shall be taken prior to startup and at 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> intervals during startup and analyzed for gross gamma activi:y.
During plant steady slate operation and following an offgas activity .increase (at the Steam Jet Air Ejectors) of 10,000 µCi/sec within a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period or a power level change of ::ie20 percent of full rated power/hr reactor coolant samples shall be taken and analy;ed for gross gamma activity.
At least three samples will be taken at 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> intervals.
These sampling requirements may be omitted whenever the . equilibrium 1-131 concentration in the reactor coolant is less than 0.002 µCi/ml.
- JAFNPP I 4.6 fcont'd) 2. The reactor coolant water shall not exceed the following limits with steaming rates less than 100,000 lb/hr except as specified in 3.6.C.3:
- Conductivity 2 µmho/cm Chloride ion 0. 1 ppm 3. For reactor startups the maximum value for conductivity shall not exceed 10 µmho/cm and the maximum value for chloride ion concentration shall not exceed O. 1 ppm, for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after placing the reactor in the power operating condition.
During reactor shutdowns, specification 3.6.C.4 will apply. Amendment No. 17, 190, 261 140 e. If the gross activity counts made in accordance with a, c, and d above indicate a total iodine concentration in exces!3 of 0.002 µCi/ml, a quantative determination shall be made for 1-131 and 1-133. 2. During startups and at steaming rates below 100,000 lb/hr, and when the conductivity of the reactor coolant exceeds 2 µmhos/cm, a sample of reactor coolant shall be taken .every 4 hr and analyzed for conductivity and chloride content. 3. a. With steaming rates greater than or equal to 100,000 lb/hr, a reactor coolant sample shall be taken at least every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> and whenever the continuous conductivity monitors indicate abnormal conductivity father than short-term spikes), and analyzed for conductivity and chloride ion *content.
- b. When the continuous conductivity monitor is inoperable, a reactor coolant sample shall be taken at least _daily and analyzed for conductivity and chloride ion content. j
The Standby Gas Treatment System is designed to filter* and exhaust the reactor building atmosphere to the main stack during secondary containment isolation conditions with a minimum , release of radioactive materials from the reactor building to the environs.
Both standby gas treatment fans are designed to automatically start upon containment isolation; however, only one fan is required to maintain the reactor building pressure at approximately a negative 1/4 in. water gage pressure; all leakage should be in-leakage.
Each of the two fans has 100 percent capacity.
If one Standby Gas Treatment System circuit is inoperable, the other circuit must be verified operable daily. This substantiates the availability of the .operable circuit and results in no added risk; thus, reactor operation or refueling operation can continue.
If neither circuit is operable, the Plant is brought to a condition where the system is not required.
While only a small amount of particulates is released from the Pressure Suppression Chamber System as a result of the loss-of-coolant accident, high-efficiency particulate fillers are specified to minimize potential particulate release to the environment and to prevent clogging of the iodine filter. The high-efficiency filters have an efficiency greater than 99 percent for particulate matter larger than 0.3 micron. The minimum iodine removal efficiency is _99 percent. Filter banks will
- Amendment No. 154, 19Q, 261 D. 191
- be replaced whenever significant changes in filter efficiency occur. Tests (11) of impregnated charcoal identical to that used in the filters indicated that shelf life up to 5 yr leads to only minor decreases in methyl iodine removal efficiency._
The analysis of the design basis loss-of-coolant i!Ccident assumed a charcoal filter efficiency of 90% for the SBGT system and a source t.;,rm provided by GE based on NED0-10871.
The assumed 90% is sufficient to prevent exceeding 10CFR100 guidelines for accidents analyzed.
The charcoal and particulate fillers are tested to an acceptance criteria of 99% efficiency with 1 % penetration.
A heater maintains rel.alive humidity below 70% in order to assure the efficient removal of methyl iodine on the impregnated charcoal filters. Regulatory Guide 1.52 assigns a charcoal filter efficiency of 95% for 2 inch beds (as used in the SBGT system), thus assuming 90% efficiency in dose calculations and testing to 99% efficiency provide additional conservatism in analysis and opuation.
The operability_of the Standby Gas Treatment System (SGTS) must be assured if a design basis loss of coolant accident (LOCA) occurs while the containment is being purged*or vented through the SGTS. Flow from containment to the SGTS is via 6 inch Valve Number 27MOV-121.
Since the maximum flow through the 6 inch line following a design basis LOCA is within the design capabilities of the SGTS, use of the 6 inch line assures the operability of the SGTS. Primary Containment Isolation Valves Double isolation valves are_provided on lines penetrating the primary containment and* open to the free space
- 4.7 BASES A. Primary Containment The water in the suppression chamber is used only for cooling in the event of an accident; i.e., it is not used for normal operation; therefore, a daily check of the temperature and volume*is adequate to assure that adequate heat removal capability is present. The primary containment preoperational test pressures are based upon the calculated primary containment pressure response corresponding to the design basis loss-of-coolant accident.
The peak drywell pressure would be about .45 psig which would rapidly reduce to 27 psig within 30 sec. following the pipe break. Following the pipe break, the suppression chamber pressure rises to 26 psig within 30 sec, equalizes with drywall pressure and thereafter rapidly decays with the drywell pressure decay (14J. Thft design pressure of the drywell and suppression chamber is 56 psig(15J.
The design basis accident leakage rate is 1.5 percent/day at a pressure of 45 psig. As pointed out above, the drywell and suppression chamber pressure following an accident"would equalize fairly rapidly. Based on the primary containment pressure response and the fact that the drywell and suppression chamber function as a unit, the primary containment will be tested as a unit rather than the individual components separately.
Amendment No. -239. 261
- Design basis accidents were evaluated as discussed in Section 14.6 of the FSAR and the power uprate safety evaluation, Reference
- 18. The whole body and thyroid doses in *the control room, low population zone (LPZI and site boundary meet the*requirements of 10 CFR Parts 50 and 100. The technical support center (TSCI, not designed to these licensing bases, was also analyzed.
The whole body and thyroid dose acceptance crlteria used for the main control room are met for the TSC when initial access to the TSC and occupancy of certain areas in the TSC is restricted by administrative control. The LOCA dose evaluations, References 19, 20, and 21, assumed: the primary containment leak rate was 1.5 volume percent per day; source term releases were in accordance with TID-14844 and Regulatory Guide 1.3, and were consistent with the Standard Review Plan; and the standby gas treatment system filter efficiency was 90% for halogens.
These doses are also based on the e I -JAFNPP §.::J9 *PQST~CCID~NT SAMPLING PROGRAM .,,. . :.*,. . . . . ,. A program shall be established, implemented, and maintained
- which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere samples under accident conditions.
The program shall include lhe following:
A) Training*
of personnel, B) Procedures for sampling and analysis, C) Provisions.
for maintenance of sampling and analysis 6.20 PRIMARY CONTAINMENT LEAKAGE RATE TESTING PROGRAM A proijram shall be established to implement the leakage rate testing of the Primary . Containment as required by 10 CFR 50.54 (o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions.
This.program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program", dated September 1995, as modified by the exception that Type C testing of valves not isolable from the containment free air space may be accomplished by pressurization in the reverse direction provided that testing in this manner provides equivalent or more conservative results than testing in the accident direction.
If potential atmospheric leakage paths (e.g., valve stem packing) are not subjected to test pressure, the portions of the valve .not exposed to test pressure shall be subjected to leakage rate measurement during regularly scheduled Type A testing. A list of these valves, the leakage rate measurement method, and the acceptance criteria, shall be containeCJ in the Program. -" A. The peak* Primary Containment intemal pressure for the design basis loss of coolant accident (Pa), .is 45 psig. B. The maximum allowable Primary Containment leakage rate (L.), at P ** shall be 1.5% of primary containment air weight per day. *
- I C. The leakage rate acceptance criteria are: 1. Primary containment leakage rate acceptance criteria is 1.0 L.-. During unit startup followinQ testing in accordance with this program, the
- leakage rate acceptance criteria are~ 0.60 L. for the Type Band Type C tests and~ 0.75 L. for the Type A tests; 2. Airlock testing acceptance criteria are: a. Overall airlock leakage rate is .5 0.05 L. when tested at? P., b. For each door seal, leakage rate is 120 scfd when tested at ? P *. MSIV leakage rate acceotance aiteria is < 11.5 scfh for each MSIV when testecf at ? 25 psig. -3. D. The ~visions of Specification 4.0.8 do not apply to the test frequencies specified in the Primary Containment Leakage Rate Testing Program.
- E. The provisions of Specification 4.0.C ate applicable to the Primary Containment Leakage Rate Testing Program. . Amendment No. 13Q, 234, 261 25Be
- JAFNPP 7 .0 REFERENCES (1 l E. Janssen, "Multi-Rod Burnout at Low Pressure," ASME Paper 62-HT-26!
August 1962. (2) K.M. Backer, "Burnout Conditions for Flow of Boiling Water in Vertical Rod Clusters," AE-74 (Stockholm, Sweden). May 1962. . (3) FSAR Section 11.2.2. (4) FSAR Section 4.4".3. (5) 1.M. Jacobs,-"Reliability of Engineered Safety Features as a Function of Testing Frequency," Nuclear Safety, Vol. 9, *No. 4, July-August 196B, pp 310-312. (6) Deleted (71 I.M. Jacobs and P.W. Mariott, APED Guidelines for Determining Safe Test Intervals and Repair Times for . Engineered Safeguards
-April 1969. (81 Bodega Bay Preliminary Hazards Report, Appendix 1, Docket 50-205, December 28, 1962. (91 C.H. Robbins, "Tests of a Full Scale 1./48 Segment of the Humbolt Bay Pressure Suppression Containment," GEAP-3596, November 17, 1960. ( 101 "Nuclear Safety Prograrn Annual Progress Report for Period Ending December _31, 1966, ORNL-4071." Amendment No. 19Q, 227, 234, 239, 261 (11) Section 5.2 of the FSAR. (12) TID 20583, "Leakage Characteristics of Steel Containment Vessel and the Analysis of Leakage Rate Determinations." ( 131 Regulatory Guide 1. 163, "Performance-Based Containment Leak-Test Program", dated September 1995. (141 Section 14.6 of the FSAR. (15) ASME Boiler and Pressure Vessel Code, Nuclear Vessels, Section Ill. Maximum allowable internal pressure is 62 psig. 1161 10 CFR Part 50, Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B -Performance Based Requirements", Effective Date October 26, 1995 . (17) Deleted (18) General Electric Report-NEDC-32016P-1, "Power Uprate Safety Analysis for James A. FitzPatrick Nuclear Power Plant," April 1993 *(proprietary), Including Errata and Addenda Sheet No. 1, dated* January 1994.
- 119) James A. FitzPatrick Calculation JAF-CALC-RAD-00023, Rev. 1, "Power Uprate Program -Technical Support Center Accident Radiological Habitability Study," September 1999. 120) James A. FitzPatrick Calculation JAF-CALC-RAD-00042, Rev. 2, "Control Room Radiological Ha_bitabi~ity
~nder Power Uprate I Conditions and CREVASS Reconf1gurat1on, October 1997. . 285
7.0 REFERENCES
(continued)
(21) James A. FitzPatrick Calculation JAF-CALC-RAD-00048, Rev. 1, "Power Uprate Project -Radiological Impact at Onsite and Offsite Outdoor Receptors Following Basis Accidents," November 1997 (22) General Electric Report GE-NE-187"""5-1191, "Containment Systems Evaluation for the James A. FitzPatrick Nuclear Power Plant," November 1991 (proprietary).
(23) James A. FitzPatrick Calculation JAF-CALC-RAD-00007, Rev. 2, "Power Uprate Program -Onsite and Offsite Accident Atmosphere Dispersion Factors", August 1997. Amendment No. ~. 261 285a
- e *e . RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS 1.0 DEFINITIONS A. Dose Equivalent 1-131 . The Dose Equivalent 1-131 is the concentration of 1-131 (microcurie/gram) which alone would produce the same thyroid dose as the quantity and isotopic mixture of 1-131, 1-132, 1-133, 1-134 and 1-135 actually present. The thyroid dose conversion factors used for this calculation shall be those listed in International Commission on Radiological Protection Publication 30 (ICRP-30), "Limits for Intake by Workers" or in NRC Regulatory Guide 1.109,.Revision 1, October 1977. B. Instrument Channel Calibration See Appendix A Technical Specifications.
C. Instrument Channel Functional Test See Appendix A Technical Specifications.
D. Instrument Check See Appendix A Technical Specifications.
E. Logic System Function Test See Appendix A Technical Specifications.
F. Member(s}
of the Public Member(s) of the Public includes all persons who are not occupationally associated .with the facilities on the NYPA/(NMPC)
- Niagara Mohawk Power Corporation site. This category does not include employees of the utilities, its
- Also excluded from this category are persons who enter the site to service equipment or to make deliveries.
This category does include persons who use portions of the site for recreational, occupational, or other purposes not associated with the plants. G. Offqas Treatment System The Offgas Treatment System is the system designed and installed to: reduce radioactive gaseous effluents by collecting primary coolant system offgases from , the main condenser; and, providing for delay of the offgas fc.. the purpose of reducing the total radioactivity prior to release to the environment.
H. Offsite Dose Calculation Manual (ODCM) The OOCM describes the methodology and parameters to be used in the calculation of offsite doses due to radioactive gaseous and liquid effluents and in the calculation of gaseous and liquid effluents monitoring instrumentation alarm/trip
- set points and in the conduct of the environmental monitoring program. I. Operable See Appendix A Technical Specifications.
Amendment No. 93, 261 I I ..........
..... .. .... .. . UNITED STATES . . . .. . NUCLEAR REGULATORY COMMISSION
-e _!/('f/1.T . .. WASHINGTO!~.
D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 261 TO FACILITY OPERATING*LICENSE NO. DPR-59 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333
1.0 INTRODUCTION
. By letter dated February 26, 1998, as supplemented by letter dated October 14, 1999, the Power Authority 9f Jhe State of New York (PASNY or the licensee), the licensee for*James A. FitzPatrick Nudea"r""Power Plant, requested an amendment to the technical specifications (TSs) for the FitzPatrick Nuclear Power Plant requesting an increase in the maximum allowable primary containment leakage rate. The October 14, 1999, letter provided .clarifying information that did not change the initial proposed no significant hazards consideration determination.
The proposed amendment would (1) increase the allowabl.e containment leakage rate (l~) to 1.5 weight percent (w/o) per day from 0.5 w/o per day. SpecificalJy, the licensee requested the following changes to the FitzPatrick TSs.
- the maximum allowable primary containment leakage rate (La) limit in TS Section 6.20 (page 258e) and TS .Bases Section 4. 7 (page 193) be amended. to 1.5 w/o per day from 0.5 w/o per day. *
- the primary coolant sampling requirement threshold value in TS Section 4.6.C (pages 139 and 140) be amended to 0.002 µCi/ml from 0.007 µCi/ml of dose-equivalent iodine-131 in the primary coolant in order to have the sampling requirement omitted. 2.0 EVALUATION To demonstrat~
the adequacy of the FitzPatrick*engineered safety feature (ESF) systems
- designed to mitigate the radiological consequences of the design basis accidents (DBAs) with the increased containment leakage rate of 1-.5 w/o per day, the licensee reevaluated the offsite and control room radiological consequences resulting from the postulated loss-of-coolant accident *(LOCA). The licensee submitted the results of its offsite and* control room *radi~logical
1 e --2 -consequence analyses.
In its submittal, the licensee concluded that the existing ESF systems at FitiPatrick with the increased containment leakage rate of 1.5 w/o per day will provide assurance that the radiological consequences at the exclusion area boundary (EAB) and the low population zone (LPZ) resulting from a postulated LOCA will be within the dose reference values given in 10 CFR Part 100 and that the radiological consequence to the control room operator will be within the dose criteria specified in General Design Criterion 19 of 10 CFR Part 50. To review the licensee's radiological consequence analyses, the staff performed confirmatory radiological consequence calculations for the following sources and radioactivity transport pathways to the environment after the postulated LOCA:
- Post-LOCA leakage from engineered safety features systems outside containment.
In its calculation of the radiological consequences of the postulated LOCA, the staff used the source term assumptions given in Regulatory Guide (RG) 1.3, ;,Assumptions Used for , Evaluating the Potential Radiological Consequences of a Loss-of-Coolant Accident for Water Reactors," (Revision 2), and an NRC computer code, HABIT (Version 1.1). The computer code is described in NUREG/CR-621 O (Supplement
- 1) and calculates, among other things, the radiological consequence doses at the EAB and the LPZ and in the control room after design basis accidents.
The primary containment was assumed to leak to-the reactor building from the drywall at a constant rate of 1.5 w/o per day (including iylSIV leakage) for the entire duration of the accident (30 days). The fission products leaked to the reactor building are released directly to the environment through the SGTS and the main stack without holdup or mixing in the reactor building.
- The FitzPatrick SGTS consists of two safety-related, full-capacity, redundant trains. Each train has one 2-inch-deep charcoal adsorber.
The licensee proposed, and the staff accepted and used in its dose calculations, a charcoal adsorber with an iodine removal efficiency of 90 percent. Any leakage water from ESF components located outside the drywell releases fission products during the recirculating phase of long-term core cooling after the postulated LOCA. The licensee estimated this leakage to be less than 5 gallons per minute (gpm), and the staff used 5 gpm for the entire duration of the accident.
The staff assumed 50 percent of the core iodine inventory is uniformly mixed with the primary coolant circulated through the drywell external piping systems and assumed 1 O percent of the iodine in the liquid leakage from the external piping*systems will become airborne.
Because the FitzPatrick reactor building is provided with an ESF-grade filtration system to filter the reactor building exhaust, the staff has not calculated the contribution to the LOCA doses from a passive failure in an ESF component.
The staff assumed that airborne fission products from the leakage are directly released to the environment through the SGTS and the main stack without holdup or mixing in the reactor building.
The major parar:neters and assumptions used are given in Table 1, and the resulting site boundary doses are given in Tabl.e 2. The FitzPatrick control re>om emergency ventilation air supply system (CREVASS) consists of two safety-related, seismic Category 1, full,.~pacity, redundant trains. Each train has two, 2-e inch-deep charcoal adsorbers in series. The licensee proposed, and the staff accepted and used, a charcoal adsorber iodine removal efficiency of 90 percent. Upon receipt of a radiation signal from the radiation monitor in the control room air intake duct, the CREVASS is manually placed in the isolation mode. There is no automatic isolation capability for the CREVASS after a postulated DBA. The licensee proposed, and the staff accepted and used in its evaluation, a 30-minute operator action time (delay) to isolate the CREVASS. The staff used in its control room dose calculation a maximum unfiltered air infiltration rate of 15,010 standard cubic feet per minute (scfm) before isolation of the control room, based on the maximum air intake during the normal operational mode of the control room ventilation system. After isolation, the staff used a maximum unfiltered air infiltration rate of 2, 11 O scfm. This rate is based on a single failure of the motor-operated air intake valve to close and a failure to close a manually operated air intake damper. The filtered make-up air intake to the contr9I room is 1,000 scfm. The major parameters and assumptions used are given in Table 1 (Attachment 1 ), and the resulting control room doses are given in Table 2 (Attachment 2). 2.1 Atmospheric Relative Concentrations in the Control Room and at the Exclusion Area Boun~ary and the Low-Population Zone Although the licensee's submittals contain calculations of atmospheric relative concentration (X/Q) values for other design basis accidents, this safety evaluation is limited to the X/Q assessment for releases from the plant main stack associated with the postulated*
LOCA. The licensee's X/Q assessments for other design basis accidents and postulated release locations have not been evaluated by the staff in this review because they are not germane to this license amendment request. Thus, the staff's findings of acceptability apply only to a po_stulated release f ram the stack associated with a design basis LOCA. The licensee provided 8 years of meteorological data, 1985 through 1992, for the Nine Mile Point Nuclear Station, which is adjacent to the FitzPatrick plant. The staff finds the use of this data for FitzPatrick-appropriate for this license amendment evaluation.
Data recovery rates for all years exceeded the guideline set forth in RG 1.23, "Onsite Meteorological Programs." This guide also states that the interval of measurement between lower and higher measurement levels should be at least 30 meters. The data were measured at 9.1, 30.5, and 61 meters. Although guidance would recommend use of measurements at the 9.1 and 61 meter levels, the staff's review of the measured stabilities and wind speeds clearly indicates that the meteorological tower frequently extends through a thermal internal boundary layer (TIBL) associated with lake breeze flow at Lake Erie. The licensee's submittal includes the results of a study of the TIBL and a discussion of its relevance to the dispersion and the estimation of stability classes. The X/Q values contained in the submittal are based on stability classes estimated using vertical temperature difference measurements (b. T) between 9.1 arid 30.5 meters (b. T s-30). The rationale for using the b. T 9_30 was provided by the licensee in a table that compares frequency distributions of stability class estimates using
- b. T s-ao, AT 30-6!* and b. T "' with the distribution of stability classes estimated objectively from solar radiation, wind speed, and other related meteorological parameters.
On the basis, at least in part, of this information, the licensee has elected to characterize stability for the dose calculations on the temperature difference between 9.1 and 30.5 meters, rather than between 9.1 and 61 meters. The 95 111 percentile X/Q values for elevated releases are associated with unstable conditions.
The b. T s-ao e e
- gives a higher frequency of unstable conditions than ~T 9.61* Consequently, the staff finds that _ the use of the aT 9*30 interval is acceptable.
In its su~mittal, the licensee presented revised X/Q values used in the*analysis
~escribing the procedures and rationale upon which the revised X/Q values are based. ihe licensee compared the revised X/Q values with those in the FitzPatrick UFSAR and the staff's earlier safety evaluation.
The submital does not include detailed descriptions of .the computer codes used to calculate the X/Q values. In general, the approach used by the licensee when estimating the revised X/Q values was based on regulatory guidance provided in RG 1.145, "Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants." Additional guidance was drawn from RG 1.3, RG 1.23, RG 1.111, "Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors," ANSI/ANS-2.5, and the XOQDOQ computer code described in NUREG/CR-2919, "XOQDOQ: Computer Program for the Meteorological Evaluation of Routine Releases at Nuclear Power Stations." Modifications to procedures described in the guidance were based *on consideration of 'the site , geography and topography and analysis of 8 years of onsite meteorological data. The procedure modifications decrease the conservative nature of the assumptions and model in the guidance.
However, the modified procepures should still be conservative because the' modifications are consistent with local conditions and tend to understate the probable effects of the local* conditions on reducing X/Q values. Results of confirmatory calculations,-based on information in the submittal are consistent with the revised X/Q values for the 0-to 2-hour period* at the site boundary and the 0-to 4-hour period at the LPZ. The staff also made confirmatory calculations for the LPZ for periods after the initial 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> using the onsite data. For these calculations, the peak offsite X/Q value was assumed to occur 4 miles south of the stack on elevated terrain. Because of the elevated terrain, the effective stack height was assumed to be 50 meters. The results of these calculations indicate that the X/Q values submitted by the licensee are conservative.
Therefore, the staff finds that the revised X/Q values are acceptable.
For purposes of dispersion calculations, FitzPatrick is a coastal site. AG 1.145 suggests that fumigation be assumed offsite for the first 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of an elevated release. The fumigation occurs when the plume intersects the TIBL. The height of the TIBL is determined by the distance from the coast, while the dispersion is a function of the distance from the release point. Consequently, fumigation X/Q values are a function of both distance from the coast and the stac~. If the stack height is less than the TIBL, fumigation due to intersection of the plume and the TIBL will not occur. However, there may still be fumigation as the neutral or unstable r boundary layer grows due to *surface heating during morning hours. It does not appear that the
- licensee considered this type of fumigation.
This omission is not likely to significantly affect X/Q
- values at the FitzPatrick site boundary and LPZ because* the site X/Q values are based on the . fumigation model. The licensee did not consider fumigation in calculating X/Q values at the control room air intake for stack releases.
The rationale provided for not considering fumigation is that TIBL*related fumigation would not occur for wind directions carrying radioactivity from the stack toward the control room air intake. It should also be noted that the distance between the stack and the control room air intake is sufficiently small such that if normal fumigation occurred during southerly winds, the turbulent processes that bring material to the ground could not bring stack
-*
- effluent to the ground before the material was carried past the intake. Consequently, the decision not to consider fumigation in determining X/Q values at the control room and technical support center air intakes is appropriate.
Given the stack height and the distance between the stack and the control room air"intake, typical calculations of X/Q values for an elevated release using the straight-line model with standard dispersion coefficients would result in unrealistically low X/Q values for use in dose assessments tor design-basis accidents.
Under unstable and light wind atmospheric conditions, meteorological factors, such as plume meander and looping that are not adequately treated by the straight-line model are likely to result in the highest X/Q values. The licensee has attempted to estimate these X/Q values by assuming that the distance traveled by the plume between the stack and the control room is equal to the distance that would result in the maximum ground-level 95t11 percentile X/Q values f<;>r the elevated release.
- Given the FitzPatrick plant layout, topography, and meteorological data, this distance is approximately 405 meters. This approach is reasonable, and the staff finds it acceptable.
The resultant X/Q values used by the licensee and the staff are given in Table 3 (Attachment 3). 2.2 Conclusion on the Technical Evaluation The staff has reviewed the licensee's analysis and performed a confirmatory calculation of the radiological consequence resulting from the postulated LOCA. The doses calculated by the staff and the licensee are listed in Table 2 (Attachment 2). As shown in the table, *the doses calculated by the licensee are comparable to those calculated by the staff, and they are well within the relevant acceptable dose criteria.
Considering the many uncertainties in the modeling of fission product transport and removal mechanisms, the staff concludes that the differences in the doses calculated by the staff and the licensee are not significant.
Therefore, the staff concludes that the radiological consequences analyzed and submitted by the licensee are acceptable.
The staff also finds that the decrease of the primary. coolant sampling requirement threshold
- value to 0.002 µCi/ml from 0.007 µCi/ml of dose-equivalent iodine-131 requested by the licensee is acceptable because this change is more conservative for monitoring iodine concentration in the primary coolant and for assessing the radiological consequences.
On the basis of this evaluation, the staff concludes that the license amendment requested by the licensee is acceptable.
However, the acceptance of tnis amendment does not relieve the licensee from the responding to the U.S. Nuclear.Regulatory Commission (NRG} Generic Letter 99-02 or regulatory actions that may be proposed in the future as the NRC-Nuclear Energy lns.titute Task Force resolve~ the control room habitability generic issues.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New York State official was notified of the proposed issuance of the amendment.
The State* official had no comments.
4.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 1 o CFR Part 20. The NRC staff has e *
- determined that the alT!endmerit involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has*been no public comment on such finding (63 FR 19977). The amendment also relates to changes in recordkeeping, reporting, or administrative procedures or requirements.
Accordingly, the ame,:idment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and (10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 CONCLUSION
The Commission has concluded, based on the consider.ations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Attachments:
- 1. Table 1 Parameters and Assumptions Used in Radiological Consequence Calculations
- 2. Table 2 Radiological Consequences (Thyroid doses in rem) 3. Meteorological Data Principal Contributors:
- J. Lee L. Brown Date: April 14, 2000 e -* TABLE 1 Parameters and Assumptions Used in Radiological Consequence Calculations Parameter Reactor power Source term Dose conversion factors Computer code used Drywell volume Containment/MSIV leak rate Standby Gas Treatment System Iodine removal efficiency Reactor building mixing/holdup ECCS Leak Rate Iodine partition factor* Control room Volume Unfiltered inleakage Before isolation After isolation Isolation time Make-up air flow rate Iodine removal efficiency 2587 Mwt Regulatory Guide 1.3 ICRP-30 HABIT, Version 1.1 1.5E+5 ft3
- t._5 percent per day 90 perc.ent 0 5.0 gpm . 10 1.49E+5 ft 3 1.5E+4 ft3/min 2.11 E+3 ft3/min 30 minutes 1.0E+3 tt3/min 90 percent --'
- e e Pathways Containment/MSIV Leak ECCS Leak. TOTAL Dose criteria Pathways Containment/MSIV Leak ECCS Leak TOTAL Dose criteria ( TABLE 2 Radiological Consequences (Thyroid Doses in rem) EAB(1> LPZ(2 l NRC Fitz Patrick NRC FitzPatrick 62.4 58.2 67.7 63.2. 6.5 3.99 7.0 5.50 68.9 62.2 74.7 68.7 300(3) 300(3) Radiological Consequences (Whole Body Doses in rem) EAB 11> LPZ(2> NRC FitzPatrick NRC Fitz Patrick 1.6 2.32 1.1 1.86 <1 < 1 < 1 < 1 1.6 2.32 1.1 1.86 25<3> 25(3) <1> Exclusion Area Boundary <2> Low Population Zone. <3> 10 CFR Part 100 C 4> General Design Criteria 19 Control Room NRC Fitz Patrick 8.0 10.1 0.14 1.06 8.14 11.2 30(4) Control Room NRC Fitz Patrick < 1 < 1 < 1 < 1 <1 < 1 5(4) e TABLE 3 Meteorological Data Exclusion Area Boundary Time (hr) X/Q (sec/m 3) 0-2 5.24x10*5 Low Population Zone Time (hr) X/Q (sec/m 3) 0-4 2.04x10*5 4-8 2.17x10*6 8-24 9.53x10*7 24-96 3.90x10*1 96-720 1.08x10*1 Control Room Time (hr) X/0 (sec/m 3) 0-8 9.26x10*1 , 8-24 6.75x10*1
- 24-96 3.39x10*1 96-720 1.26x10*1 Attachment 3