Issuance of Amendment No. 318, Revise Emergency Plan for Emergency Response Organization Requalification Training Frequency Consistent with Exelon Fleet (CAC MG0026; EPID L-2017-LLA-0273)
ML17289A175
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/26/2018
From: Tanya Hood
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co
Hood T, NRR/DORL/LPL1, 301-415-1387
References
CAC MG0026, EPID L-2017-LLA-0273, JAFP-17-0073
Download: ML17289A175 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 26, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- ISSUANCE OF AMENDMENT NO. 318 RE: EMERGENCY PLAN REQUALIFICATION TRAINING FREQUENCY FOR EMERGENCY RESPONSE ORGANIZATION PERSONNEL (CAC NO. MG0026; EPID L-2017-LLA-0273)

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 318 to Renewed Facility Operating License No. DPR-59 for the James A.

FitzPatrick Nuclear Power Plant. The amendment revises the license to authorize changes to the Emergency Plan in response to your application dated July 31, 2017.

The amendment authorizes the licensee to revise the Emergency Plan description for the emergency response organization requalification training frequency from "annually" to "once per calendar year not to exceed 18 months between training sessions."

A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register Notice.

/1/ J Sincerely,

. l /\

-JJ {ti i L-A r 1* t*-* w7

. /t '7

  • 1 TanyafE. Hood, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Amendment No. 318 to Renewed License No DPR-59
2. Safety Evaluation cc: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC EXELON FITZPATRICK, LLC DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 318 Renewed License No. DPR-59

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Exelon Generation Company, LLC and Exelon FitzPatrick, LLC (the licensee) dated July 31, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1

2. Accordingly, by Amendment No. 318, the license is amended to authorize changes to the Emergency Plan as set forth in the licensee's application dated July 31, 2017, and evaluated in the NRC staff's safety evaluation for this amendment.
3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days.

FOR THE NUCLEAR REGULA TORY COMMISSION

~j~6D'/_.

Brian E. Holian, Acting Director Office of Nuclear Reactor Regulation Date of Issuance: March 2 6 , 2 o1 8

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 318 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-59 EXELON GENERATION COMPANY, LLC EXELON FITZPATRICK, LLC JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333

1.0 INTRODUCTION

By letter dated July 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17213A049), Exelon Generation Company, LLC (Exelon or the licensee) requested a change to the renewed facility operating license for the James A.

FitzPatrick Nuclear Power Plant (FitzPatrick). The proposed amendment would amend the license to allow the licensee to revise the Emergency Plan requalification training frequency for emergency response organization (ERO) personnel, consistent with emergency plans throughout the Exelon fleet.

2.0 REGULATORY EVALUATION

The applicable regulations and guidance for the emergency plans are as follows:

2.1 Regulations The regulations in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.47(b) provide standards to ensure that nuclear power reactor licensees have emergency response plans that provide reasonable assurance that adequate protective measures will be taken in the event of an emergency at a nuclear power reactor.

The following regulatory requirements are applicable to the license amendment request:

  • 10 CFR 50.47(b)(15), which states, "Radiological emergency response training is provided to those who may be called on to assist in an emergency."

Enclosure 2

The program to provide for: (a) The training of employees and exercising, by periodic drills, of emergency plans to ensure that employees of the licensee are familiar with their specific emergency response duties, and (b) The participation in the training and drills by other persons whose assistance may be needed in the event of a radiological emergency shall be described. This shall include a description of specialized initial training and periodic retraining programs to be provided ....

2.2 Guidance Section 11.0, Evaluation Criterion 5 of NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980 (ADAMS Accession No. ML040420012),

states:

Each organization shall provide for the initial and annual retraining of personnel with emergency response responsibilities.

3.0 TECHNICAL EVALUATION

In its license amendment request, Exelon requested U.S. Nuclear Regulatory Commission (NRC or the Commission) prior approval to revise the description of its ERO requalification training frequency in the FitzPatrick Emergency Plan from "annually" to "once per calendar year not to exceed 18 months between training sessions." This change would align the requalification training frequency across the Exelon fleet and establish a common ERO requalification training frequency for personnel assigned to ERO positions.

The NRC staff determined that the proposed change would enable Exelon to establish consistency in training cycles, while allowing some flexibility in scheduling ERO requalification training. The NRC staff's guidance regarding ERO requalification training periodicity is met by ensuring that requalification training will be conducted once each calendar year and that 18 months is the maximum period that elapses between ERO requalification training cycles.

The purpose of annual training is to ensure that ERO personnel are familiar with their duties. To accommodate the scheduling of training, licensees can schedule their training at any time during each calendar year as long as they meet the annual requirement. Because the proposed change will allow training to be conducted annually (but no more than 18 months apart), it meets the guidance of NUREG-0654/FEMA-REP-1, Revision 1. Therefore, the NRC staff finds that the licensee's request satisfies the guidance provided in Section 11.0.5 of NUREG-0654/FEMA-REP-1, Revision 1 and meets planning standard 10 CFR 50.47(b)(15) and the requirements of Section IV.F.1 to Appendix E of 10 CFR Part 50.

Accordingly, the NRC staff concludes that the proposed revision to the requalification training frequency requirement from "annually" to "once per calendar year not to exceed 18 months between training sessions" provides reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, New York State officials were notified of the proposed issuance of the amendment on February 13, 2018. The New York State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes the requirements with respect to how the emergency plan annual training requirements are administered. As such, the amendment relates to recordkeeping, reporting, or administrative procedures or requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (82 FR 44854; September 26, 2017).

Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(1 O)(ii). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Michael Wasem Da~: March 26, 2018

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- ISSUANCE OF AMENDMENT NO. 318 RE: EMERGENCY PLAN REQUALIFICATION TRAINING FREQUENCY FOR EMERGENCY RESPONSE ORGANIZATION PERSONNEL (CAC NO. MG0026; EPID L-2017-LLA-0273) DATED MARCH 26, 2018 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl1 Resource RidsNrrLAJBurkhardt Resource RidsNrrLALRonewicz Resource RidsNrrPMFitzPatrick Resource RidsRgn1 MailCenter Resource JTobin, NRR RidsNsirDpr Resource RidsNrrDorl Resource RidsNrrOd Resource JAnderson, NSIR MWasim, NSIR ADAMS Access1on No.: ML17289A175 *b1y e-ma,*1 OFFICE NRR/DORULPL 1/PM NRR/DORULPULA NSIR/DPR/RLB/BC* OGC- NLO NAME BVenkataraman LRonewicz (JBurkhardt for) JAnderson MYoung DATE 02/07/2018 03/06/2018 10/03/2017 03/01/2018 OFFICE NRR/DORULPL 1/BC NRR/DORUD NRR/D(A) NRR/DORULPL 1/PM NAME JDanna JGiitter (KBrock for) BHolian (MEvans for) THood DATE 03/12/2018 03/13/2018 03/21/2018 03/26/2018 OFFICIAL RECORD COPY