JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...
Letter Sequence Supplement | |
---|---|
TAC:MD8556, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML0802503722008-01-24024 January 2008
[Table View]Final Safety Evaluation Report Related to the License Renewal of James A. FitzPatrick Nuclear Power Plant Project stage: Approval JAFP-08-0034, Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A2008-04-22022 April 2008 Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A Project stage: Request ML0815108262008-04-30030 April 2008 NUREG-1905 Safety Evaluation Report Related to the License Renewal of James A. FitzPatrick Nuclear Power Plant. Project stage: Other ML0816805312008-06-24024 June 2008 Request for Additional Information, Amendment Application for Relocation of Pressure and Temperature Limits Report Project stage: RAI JAFP-08-0057, Response to Request for Additional Information Regarding Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report2008-07-0202 July 2008 Response to Request for Additional Information Regarding Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Project stage: Response to RAI ML0821004542008-07-22022 July 2008 James A. FitzPatrick - Response to Request for Additional Information Regarding Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Project stage: Response to RAI ML0822001442008-08-11011 August 2008 Request for Withholding Information from Public Disclosure (Tac MD8556) Project stage: Withholding Request Acceptance JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...2008-09-24024 September 2008 Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... Project stage: Supplement ML0828105192008-09-30030 September 2008 Licensee Review of Draft SE for Proprietary Information Project stage: Draft Other ML0826303652008-10-0303 October 2008 Issuance of Amendment Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-A Project stage: Approval ML0828203902008-10-0303 October 2008 Technical Specification Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-A Project stage: Other 2008-06-24 |
ML082770070 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 09/24/2008 |
From: | Peter Dietrich Entergy Nuclear Northeast, Entergy Nuclear Operations |
To: | Office of Nuclear Reactor Regulation |
References | |
JAFP-08-0098, TAC MD8556, TSTF-419-A | |
Download: ML082770070 (6) | |
Similar Documents at FitzPatrick | |
---|---|
Category:Letter type:JAFP
MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023
[Table view]License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023
[Table view]License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21181A0572021-11-0404 November 2021 Issuance of Amendment No. 344 Adoption of TSTF-545 JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.62020-12-11011 December 2020 Application to Revise Surveillance Requirement (SR) 3.5.1.6 JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule2020-12-11011 December 2020 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves2020-06-30030 June 2020 License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.2020-06-30030 June 2020 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2020-02-24024 February 2020 Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...2020-01-23023 January 2020 License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2019-09-0505 September 2019 License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02019-03-0707 March 2019 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. JAFP-18-0106, License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications2018-11-29029 November 2018 License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO JAFP-18-0093, License Amendment Request - Reactivity Anomalies Surveillance2018-10-0202 October 2018 License Amendment Request - Reactivity Anomalies Surveillance ML18292A5282018-09-25025 September 2018 Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement JAFP-18-0048, James A. Fitzpatrick, Unit 1, License Amendment Request - Safety Limit Minimum Critical Power Ration Change2018-05-17017 May 2018 James A. Fitzpatrick, Unit 1, License Amendment Request - Safety Limit Minimum Critical Power Ration Change RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) JAFP-18-0014, James A. FitzPatrick Nuclear Power Plant - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2018-01-31031 January 2018 James A. FitzPatrick Nuclear Power Plant - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors JAFP-18-0014, Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2018-01-31031 January 2018 Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18037A7872018-01-31031 January 2018 Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors 2023-08-31 Category:Technical Specification MONTHYEARJAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023
[Table view]License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML23095A3742023-04-0505 April 2023 Enclosure 2: Technical Specification (TS) Bases Revision 58 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21095A2972021-04-0505 April 2021 Revised Technical Specifications Bases JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-10-0202 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17104A0122017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-17-0030, Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes2017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2015-04-0808 April 2015 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal JAFP-11-0102, Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers2011-08-16016 August 2011 Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers JAFP-10-0079, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter2010-06-25025 June 2010 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2010-04-21021 April 2010 Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function2009-07-31031 July 2009 Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function JAFP-09-0087, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-07-31031 July 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...2008-09-24024 September 2008 Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... ML0816900942008-08-0707 August 2008 Technical Specification JAFP-08-0011, License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP)2008-02-0707 February 2008 License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP) JAFP-08-0006, Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-3742008-01-22022 January 2008 Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-374 JAFP-07-0091, Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-25025 July 2007 Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-07-0088, James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-07-17017 July 2007 James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)2005-05-31031 May 2005 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-04-0083, Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio2004-06-0404 June 2004 Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension2003-07-28028 July 2003 Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension ML0235000102002-12-0606 December 2002 Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) ML0222606432002-08-13013 August 2002 Technical Specifications for Amendment No. 275, Changes to the Technical Specification Leakage Limit for the Main Steam Isolation Valves from an Individual to an Aggregate Limit (Tac No. MB3333) JAFP-02-0146, Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling...2002-07-17017 July 2002 Updated Markup and Retyped Technical Specification Pages for Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling... ML0219700842002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219700282002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment Table a - Administrative Changes Matrix ML0219700712002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment 4, Table L - Less Restrictive Changes Matrix ML0219700952002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), 3.6 Containment Systems ML0219701022002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.7 Plant Systems ML0219701382002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219701422002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.3 Instrumentation ML0219700922002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B. 3.4 Reactor Coolant System (RCS) JPN-02-016, Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences2002-06-0707 June 2002 Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences ML18031A0412000-04-14014 April 2000 Issuance of Amendment 261 Changes to the Technical Specifications Regarding the Allowed Containment Leakage Rate 2023-08-03 Category:Amendment MONTHYEARRS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023
[Table view]Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-10-0079, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter2010-06-25025 June 2010 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2010-04-21021 April 2010 Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function2009-07-31031 July 2009 Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function JAFP-09-0087, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-07-31031 July 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent...2008-09-24024 September 2008 Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... ML0816900942008-08-0707 August 2008 Technical Specification JAFP-08-0011, License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP)2008-02-0707 February 2008 License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP) JAFP-07-0091, Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-07-25025 July 2007 Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)2005-05-31031 May 2005 Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension2003-07-28028 July 2003 Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension ML0235000102002-12-0606 December 2002 Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) ML0222606432002-08-13013 August 2002 Technical Specifications for Amendment No. 275, Changes to the Technical Specification Leakage Limit for the Main Steam Isolation Valves from an Individual to an Aggregate Limit (Tac No. MB3333) ML0219701382002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219701022002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.7 Plant Systems ML0219700952002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), 3.6 Containment Systems ML0219700842002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Table of Contents ML0219700712002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment 4, Table L - Less Restrictive Changes Matrix ML0219700282002-07-0303 July 2002 Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), Attachment Table a - Administrative Changes Matrix ML0219701422002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B 3.3 Instrumentation ML0219700922002-07-0303 July 2002 Technical Specifications, Amendment Conversion to Improved Technical Specifications (TAC No. MA5049), B. 3.4 Reactor Coolant System (RCS) JPN-02-016, Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences2002-06-0707 June 2002 Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences ML18031A0412000-04-14014 April 2000 Issuance of Amendment 261 Changes to the Technical Specifications Regarding the Allowed Containment Leakage Rate JAFP-01-0133, ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation1995-04-0707 April 1995 ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation ML17037C4561975-08-11011 August 1975 Letter Transmitting Application for Amendment to Technical Specifications to Provide Reporting Intervals and Organizational Information Consistent with Appendix a of License Nos. DPR-63 and DPR-59 2023-05-25 |
Text
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. Fitzpatrick NPP
-- Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840
- Pete Dietrich Site Vice President - JAF September 24, 2008 JAFP-08-0098
Subject:
Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 James A. FitzPatrick Nuclear Power Plant - Supplement to The Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A (TAC No. MD8556)
References:
- 1) Entergy Letter, JAFP-08-0034, "Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T)
Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A", dated April 22, 2008 (TAC No. MD8556)
- 2) Entergy Letter, JAFP-08-0067, "Response to Request For Additional Information Regarding Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report (TAC No. MD8556)", dated July 22, 2008
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. (ENO), as operator of the James A. FitzPatrick Nuclear Power Plant (JAF), hereby submits this supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent'with TSTF-419-A, dated April 22, 2008 (Reference 1). In ENO's response to NRC's request for additional information (Reference 2)
ENO included a specific analysis of the small diameter instrument nozzles in the belt region of the JAF reactor vessel. That analysis should be referenced in the Technical Specification 5.6.7 discussion of analytical methods, as shown on the Technical Specification pages attached to this supplement. contains a mark-up of Technical Specification page 5.6-3 and Attachment 2 contains a clean typed version of the same Technical Specification page showing the additional reference. The clean typed Technical Specification page provided in Attachment 2 should replace the clean typed page 5.6-3 provided in Reference 1.
JAFP-08-0098 Page 2 of 2 There are no new commitments made in this letter.
This letter does not affect the "No Significant Hazards" determination made in Reference 1.
Should you have any questions concerning this letter, please contact Mr. Gene Dorman, Acting Licensing Manager, at (315) 349-6810.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 24th day of September, 2008.
Pete Dielrich Site Vice President Attachments:
- 1. Marked-up Technical Specification Page
- 2. Clean Typed Technical Specification Page cc:
Mr. Samuel J. Collins Mr. Bhalchandra Vaidya, Project Manager Regional Administrator, Region I Plant Licensing Branch I-1 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing 475 Allendale Road Office of Nuclear Reactor Regulation King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Mail Stop O-8-G14 Office of Resident Inspector Washington, DC 20555-0001 James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission Mr. Paul Tonko, President P. O. Box 136 New York State Energy Research Lycoming, New York 13093 and Development Authority 17 Columbia Circle Mr. Paul Eddy Albany, New York 12203-6399 New York State Department of Public Service 3 Empire State Plaza Albany, New York 12223-1350
ATTACHMENT 1 to JAFP-08-0098 Marked-up Technical Specification Page Page 5.6-3
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal, mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.6 PAM Report When a report is required by Condition B or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
5.6.7 Reactor Coolant System (RCS PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)
- a. RCS pressure and temperature limits for heatup, cooldown, low temoerature operation, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
i) Limiting Conditions for Operation Section 3.4.9 "RCS Pressure and Temperature (PIT) Limits" ii) Surveillance Requirements Section 3.4.9 "RCS Pressure and Temperature (PIT) Limits"
- b. The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC. specifically those described in the following document:
i) SIR-05-044-A, -Pressure-Temperature Limits Report Methodology for Boiling Water Reactors" ii) SIA Calculation, 0800846.301, "2" Instrument Nozzle Stress Analysis"
- c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.
JAFNPP .5.6-3 Amendment 282
ATTACHMENT 2 to JAFP-08-0098 Clean Typed Technical Specification Page Page 5.6-3
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.6 PAM Report When a report is required by Condition B or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
5.67 * ,'-,Reactor Coolant System (RCS PRESSURE AND TEMPERATURE IMITS REPORT4 (PTLR)
- a. RCS pressure and temperature limits for heatup, cooldown, low temperature operation, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
i) Limiting Conditions for Operation Section 3.4.9 "RCS Pressure and Temperature (P/T) Limits" ii) Surveillance Requirements Section 3.4.9 "RCS Pressure and Temperature (P/T) Limits"
- b. The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
i) SIR-05-044-A, "Pressure-Temperature Limits Report Methodology for Boiling Water Reactors" ii) SIA Calculation 0800846.301, "2" Instrument Nozzle Stress Analysis"
- c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.
JAFNPP 5.6-3 Amendment