Text
Mr. Bryan C. Hanson Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 2, 2018 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; JAMES A. FITZPATRICK NUCLEAR POWER PLANT; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; R. E. GINNA NUCLEAR POWER PLANT; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - ISSUANCE OF AMENDMENTS TO RELOCATE THE STAFF QUALIFICATION REQUIREMENTS (EPID L-2018-LLA-0053)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC) has issued the following enclosed amendments in response to the Exelon Generation Company, LLC (Exelon, the licensee) application dated March 1, 2018 (Agencywide Documents Access and Management System Accession No. ML18060A266):
- 1.
Amendment No. 197 to Renewed Facility Operating License No. NPF-72 and Amendment No. 197 to Renewed Facility Operating License No. NPF-77 for the Braidwood Station, Units 1 and 2, respectively;
- 2.
Amendment No. 203 to Renewed Facility Operating License No. NPF-37 and Amendment No. 203 to Renewed Facility Operating License No. NPF-66 for the Byron Station, Unit Nos. 1 and 2, respectively;
- 3.
Amendment No. 325 to Renewed Facility Operating License No. DPR-53 and Amendment No. 303 to Renewed Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2, respectively;
- 4.
Amendment No. 219 to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1;
- 5.
Amendment No. 258 to Renewed Facility Operating License No. DPR-19 and Amendment No. 251 to Renewed Facility Operating License No. DPR-25 for Dresden Nuclear Power Station, Units 2 and 3, respectively;
- 6.
Amendment No. 320 to Renewed Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant;
- 7.
Amendment No. 229 to Renewed Facility Operating License No. NPF-11 and Amendment No. 215 to Renewed Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively;
- 8.
Amendment No. 231 to Renewed Facility Operating License No. NPF-39 and Amendment No. 194 to Renewed Facility Operating License No. NPF-85 for the Limerick Generating Station, Units 1 and 2, respectively;
- 9.
Amendment No. 231 to Renewed Facility Operating License No. DPR-63 and Amendment No. 172 to Renewed Facility Operating License No. NPF-69 for the Nine Mile Point Nuclear Station, Units 1 and 2, respectively;
- 10.
Amendment No. 319 to Renewed Facility Operating License No. DPR-44 and Amendment No. 322 to Renewed Facility Operating License No. DPR-56 for the Peach Bottom Atomic Power Station, Units 2 and 3, respectively;
- 11.
Amendment No. 270 to Renewed Facility Operating License No. DPR-29 and Amendment No. 265 to Renewed Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively;
- 12.
Amendment No. 129 to Renewed Facility Operating License No. DPR-18 for the R. E. Ginna Nuclear Power Plant; and
- 13.
Amendment No. 294 to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1.
The amendments revise the technical specifications for each facility to relocate the licensee's staff qualification requirements to the Exelon Quality Assurance Topical Report.
A copy of the NRC staff's Safety Evaluations are also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Docket Nos. STN 50-456, STN 50-457,
Enclosures:
STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244, and 50-289
- 1. Amendment No. 197 to NPF-72
- 2. Amendment No. 197 to NPF-77
- 3. Amendment No. 203 to NPF-37
- 4. Amendment No. 203 to NPF-66
- 5. Amendment No. 325 to DPR-53
- 6. Amendment No. 303 to DPR-69
- 7. Amendment No. 219 to NPF-62
- 8. Amendment No. 258 to DPR-19
- 9. Amendment No. 251 to DPR-25
- 10. Amendment No. 320 to DPR-59
- 11. Amendment No. 229 to NPF-11
- 12. Amendment No. 215 to NPF-18
- 13. Amendment No. 231 to NPF-39
- 14. Amendment No. 194 to NPF-85
- 15. Amendment No. 231 to DPR-63
- 16. Amendment No. 172 to NPF-69
- 17. Amendment No. 319 to DPR-44
- 18. Amendment No. 322 to DPR-56
- 19. Amendment No. 270 to DPR-29
- 20. Amendment No. 265 to DPR-30
- 21. Amendment No. 129 to DPR-18
- 22. Amendment No. 294 to DPR-50
- 23. Safety Evaluation cc: Listserv Blake Purnell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-456 BRAIDWOOD STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 197 Renewed License No. NPF-72
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-72 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 197 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION c) J O a,/ ___
David J. Wronl. Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 2018
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 197 Renewed License No. NPF-77
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-77 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 197 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION OJO,N~
David J. Wron/,_Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 201 8
ATTACHMENT TO LICENSE AMENDMENT NOS. 197 AND 197 RENEWED FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-72 Page 3 License NPF-77 Page 3 TSs 5.3-1 License NPF-72 Page 3 License NPF-77 Page 3 TSs 5.3-1 (2)
Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 197 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-72 Amendment No. 197 (2)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 197 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-77 Amendment No. 197
5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications Facility Staff Qualifications 5.3 5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
BRAIDWOOD - UNITS 1 & 2 5.3 - 1 Amendment 197
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-454 BYRON STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 203 Renewed License No. NPF-37
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-37 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 203 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
~
r c/L_J/ <J. v~
David J. Wrona, iranch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 2018
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-455 BYRON STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 203 Renewed License No. NPF-66
- 1.
The U.S. Nuclear Regulatory Commission {the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-66 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 203, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION 0
- \\ LL 2 tvl David J. Wrona, anch C~
Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 201 8
ATTACHMENT TO LICENSE AMENDMENT NOS. 203 AND 203 RENEWED FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 BYRON STATION, UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-454 AND STN 50-455 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-37 Page 3 License NPF-66 Page 3 TSs 5.3-1 License NPF-37 Page 3 License NPF-66 Page 3 TSs 5.3-1 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 1 O CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 203 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Deleted.
(4)
Deleted.
Renewed License No. NPF-37 Amendment No. 203 (2)
Pursuant to the Act and 10 CFR Part 70, to receive; possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
The renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113),
as revised through Amendment No. 203, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-66 Amendment No. 203
5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications Facility Staff Qualifications 5.3 5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
BYRON - UNITS 1 & 2 5.3 - 1 Amendment 203
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 325 Renewed License No. DPR-53
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-53 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 325, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C) J n v _________ -
David J. Wrona, shmch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 2 O 1 8
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 303 Renewed License No. DPR-69
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-69 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 303, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
()J '2* v_
David J. Wrona, Br ch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NOS. 325 AND 303 RENEWED FACILITY OPERATING LICENSE NOS. DPR-53 AND DPR-69 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-53 Page 3 License DPR-69 Page 3 TSs 5.3-1 License DPR-53 Page 3 License DPR-69 Page 3 TSs 5.3-1 (4)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation pursuant to the Act and 1 O CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1)
Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 325, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.
(a)
For Surveillance Requirements (SRs) that are new, in Amendment 227 to Facility Operating License No. DPR-53, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 227. For SRs that existed prior to Amendment 227, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 227.
(3)
Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 318 are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Additional Conditions.
(4)
Secondary Water Chemistry Monitoring Program Exelon Generation shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
Amendment No. 325 (4)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now and hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1)
Maximum Power Level Exelon Generation is authorized to operate the facility at reactor steady-state core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2)
Technical Specifications (3)
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 303, are hereby incorporated into this license.
The licensee shall operate the facility in accordance with the Technical Specifications.
(a)
For Surveillance Requirements (SRs) that are new, in Amendment 201 to Facility Operating License No. DPR-69, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 201. For SRs that existed prior to Amendment 201, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 201.
Less Than Four Pump Operation The licensee shall not operate the reactor at power levels in excess of five (5) percent of rated thermal power with less than four (4) reactor coolant pumps in operation. This condition shall remain in effect until the licensee has submitted safety analyses for less than four pump operation, and approval for such operation has been granted by the Commission by amendment of this license.
(4)
Environmental Monitoring Program If harmful effects or evidence of irreversible damage are detected by the biological monitoring program, hydrological monitoring program, and the Amendment No. 303
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 5.3-1 Amendment No. 325 Amendment No.303
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-461 CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 219 License No. NPF-62
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 219, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION OJ2. v~_
David J. Wrona, Br nch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance: August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NO. 219 FACILITY OPERATING LICENSE NO. NPF-62 CLINTON POWER STATION, UNIT NO. 1 DOCKET NO. 50-461 Replace the following pages of the Facility Operating License and Appendix A, Technical Specifications (TSs ), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-62 Page 3 TSs 5.0-5 License NPF-62 Page 3 TSs 5.0-5 (4)
Exelon Generation Company, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and (7)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 1 O CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 219, are hereby incorporated into this license.
Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 219
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified the Exelon Quality Assurance Topical Report.
CLINTON 5. i)
- 1 Amendment No. 'FJ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-237 DRESDEN NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 258 Renewed License No. DPR-19
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-19 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 258, are hereby incorporated into this renewed operating license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
(>c_J, (l y_*
David J. Wrona, Bral,Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 201 8
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-249 DRESDEN NUCLEAR POWER STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 251 Renewed License No. DPR-25
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-25 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION OJ 2-v.____* -*
David J. Wrona, Bra ch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NOS. 258 AND 251 RENEWED FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-237 AND 50-249 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-19 Page 3 License DPR-25 Page4 TSs 5.3-1 License DPR-19 Page 3 License DPR-25 Page 4 TSs 5.3-1 (2)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear materials as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation Company, LLC, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2957 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 258, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Operation in the coastdown mode is permitted to 40% power.
Renewed License No. DPR-19 Amendment No. 258
- f.
Surveillance Requirement 4.9.A.1 O - Diesel Storage Tank Cleaning (Unit 3 and Unit 2/3 only)
Each of the above Surveillance Requirements shall be successfully demonstrated prior to entering into MODE 2 on the first plant startup following the fourteenth refueling outage (D3R14).
- 3.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A.
Maximum Power Level The licensee is authorized to operate the facility at steady state power levels not in excess of 2957 megawatts (thermal), except that the licensee shall not operate the facility at power levels in excess of five (5) megawatts (thermal), until satisfactory completion of modifications and final testing of the station output transformer, the auto-depressurization interlock, and the feedwater system, as described in the licensee's telegrams; dated February 26, 1971, have been verified in writing by the Commission.
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
Reports The licensee shall make certain reports in accordance with the requirements of the Technical Specifications.
D.
Records The licensee shall keep facility operating records in accordance with the requirements of the Technical Specifications.
E.
Restrictions Operation in the coastdown mode is permitted to 40% power.
Renewed License No. DPR-25 Amendment No. 251
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
Dresden 2 and 3
- 5. 3 -1 Amendment No. 258/251
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON FITZPATRICK, LLC AND EXELON GENERATION COMPANY, LLC DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 320 Renewed License No. DPR-59
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 0
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-59 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 320, are hereby incorporated in the renewed operating license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C) J/, -. 0/_--
David J. Wrona, Brath Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 201 8
AITACHMENT TO LICENSE AMENDMENT NO. 320 RENEWED FACILITY OPERATING LICENSE NO. DPR-59 JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-59 Page 3 TSs 5.2-2 5.3-1 License DPR-59 Page 3 TSs 5.2-2 5.3-1 (4)
Exelon Generation Company pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, at any time, any byproduct, source and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration; or associated with radioactive apparatus, components or tools.
(5)
Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level (2)
(3)
Exelon Generation Company is authorized to operate the facility at steady state reactor core power levels not in excess of 2536 megawatts (thermal).
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 320, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protections program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated November 20, 1972; the SER Supplement No. 1 dated February 1, 1973; the SER Supplement No. 2 dated October 4, 1974; the SER dated August 1, 1979; the SER Supplement dated October 3, 1980; the SER Supplement dated February 13, 1981; the NRC Letter dated February 24, 1981; Technical Specification Amendments 34 (dated January 31, 1978), 80 (dated May 22, 1984), 134 (dated July 19, 1989),
135 (dated September 5, 1989), 142 (dated October 23, 1989), 164 (dated August 10, 1990), 176 (dated January 16, 1992), 177 (dated February 10, 1992), 186 (dated February 19, 1993), 190 (dated June 29, 1993), 191 (dated July 7, 1993), 206 (dated February 28, 1994), and 214 (dated June 27, 1994); and NRC Exemptions and associated safety evaluations dated April 26, 1983, July 1, 1983, January 11, 1985, Amendment 320 Renewed License No. DPR-59
Organization 5.2 5.2 Organization 5.2.2 Plant Staff (continued)
- b.
Shift crew composition may be less than the minimum requirement of 1 O CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
- c.
A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.
- d.
Deleted
- e.
The operations manager or assistant operations manager shall hold an SRO license.
- f.
When in MODES 1, 2, or 3 an individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operations of the unit. This individual shall meet the qualifications specified in the Exelon Quality Assurance Topical Report.
5.2-2 Amendment 320
5.0 ADMINISTRATIVE CONTROLS 5.3 Plant Staff Qua I if ications Plant Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
JAFNPP 5.3-1 Amendment 320
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-373 LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERA TING LICENSE Amendment No. 229 Renewed License No. NPF-11
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-11 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 229, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 1
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION OcJ (l v_,
David J. Wrona, BrJ~h Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 201 8
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-374 LASALLE COUNTY STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 215 Renewed License No. NPF-18
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-18 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 2
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION (jJ 2 (1~
David J. Wrona, Bra ch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NOS. 229 AND 215 RENEWED FACILITY OPERATING LICENSE NOS. NPF-11 AND NPF-18 LASALLE COUNTY STATION. UNITS 1 AND 2 DOCKET NOS. 50-373 AND 50-37 4 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs ), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-11 Page 3 License NPF-18 Page 3 TSs 5.3-1 License NPF-11 Page 3 License NPF-18 Page 3 TSs 5.3-1
Am. 146 01/12/01 Am. 202 07/21/11 Am. 198 09/16/10 Renewed License No. NPF-11 (3)
Exelon Generation Company, LLC, pursuant to the Act and 1 O CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
(5)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).
Am. 229 08/02/18 (2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 229, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Am. 194 08/28/09 Am. 194 08/28/09 Am. 194 08/28/09 (3)
(4)
(5)
DELETED DELETED DELETED Amendment No. 229
Am. 189 07/21/11 Am. 185 09/16/10 Renewed License No. NPF-18 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal). Items in shall be completed as specified. Attachment 1 is hereby incorporated into this license.
Am. 215 08/02/18 (2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 215
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
LaSalle 1 and 2 5.3-1 Amendment No.229/215
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-352 LIMERICK GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 231 Renewed License No. NPF-39
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-39 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 231, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 3
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C,
¥ David JS:!:.. Blh Chief'--------
Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance: August 2, 2018
AITACHMENT TO LICENSE AMENDMENT NO. 231 RENEWED FACILITY OPERATING LICENSE NO. NPF-39 LIMERICK GENERATING STATION, UNIT 1 DOCKET NO. 50-352 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-39 Page 3 TSs 6-6 License NPF-39 Page 3 TSs 6-6 (2)
Pursuant to the Act and 1 O CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2. D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
( 1)
Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this renewed license shall be completed as specified. Attachment 1 is hereby incorporated into this renewed license.
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 231, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-39 Amendment No. 231
ADMINISTRATIVE,,LO.NIB.OLS 6.2.3 DELETED.
The information from this section is located in the UFSAR.
~.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.l The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit.
The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.
6.3 UNIT STAFF QUALIFICATIONS 6.3.l Each member of the unit staff shall meet or exceed the m1n1mum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
LIMERICK - UNIT 1 6-6 Amendment No. +-G, ~. hl,, M, -%, &W, 231 b8~Fet-&G-by-1=-ett~f'--4a-t-f.4 O&t-Gbe~-l+,-+9~§
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-353 LIMERICK GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 194 Renewed License No. NPF-85
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-85 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 194, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 4
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
()J 9 v~
David J. Wrona, Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance:
August 2, 2 o 1 8
ATTACHMENT TO LICENSE AMENDMENT NO. 194 RENEWED FACILITY OPERATING LICENSE NO. NPF-85 LIMERICK GENERATING STATION, UNIT 2 DOCKET NO. 50-353 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-85 Page 3 TSs 6-6 License NPF-85 Page 3 TSs 6-6 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 1 O CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 194, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-85 Amendment No. 194
ADl1lfilS.IRAI l.\\LE,U)HIBJ)LS __ ~---~------------------
- 6. 2. 3 DELETED.
The information from this section is located in the UFSAR.
6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit.
The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.
6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of unit staff shall meet or exceed the m1n1mum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
LlMERICK - UNIT 2 6 6 Amendment No. J, iW, e,.,6G, m, 194 G-Gfi'.'-e-tte-EI -by -h--tte-1'- 4a-te4 G-&t-Bbef. -++,-+/---9-9~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NINE MILE POINT NUCLEAR STATION, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-220 NINE MILE POINT NUCLEAR STATION UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 231 Renewed License No. DPR-63
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-63 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 231, is hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications. 5
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C)LJ Q CJ/
David J. Wrona, Brancfc~ief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NO. 231 RENEWED FACILITY OPERATING LICENSE NO. DPR-63 NINE MILE POINT NUCLEAR STATION UNIT NO. 1 DOCKET NO. 50-220 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-63 Page 3 TSs 349 Insert License DPR-63 Page 3 TSs 349 (2)
Exelon Generation pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components.
(5)
Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30; Section 40.41 of Part 40; Section 50.54 and 50.59 of Part 50; and Section 70.32 of Part 70. This renewed license is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is also subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1850 megawatts (thermal).
(2)
Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 231, is hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.
(3)
Deleted Renewed License No. DPR-63 Amendment No.191 tAFel:l~A 219,211,213,214, 21§, 216,217,218,222,223,224, 22§, 227,229,231 Gerreetiefl Letter Dated A1:1~1:Jst 7, 2012 Gerreetiefl Letter Deteel Merel, 17, 2015 Cemeetiefl Letter eleteel d1:1ly 29, 2016
- e.
As a minimum, either the Manager Operations or the General Supervisor Operations shall hold an SRO license.
- f.
The Shift Technical Advisor (STA) shall provide advisory technical support to the shift supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.
6.3 Unit Staff Qualifications 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
6.4 Procedures 6.4.1 Written procedures and administrative policies shall be established, implemented and maintained that meet or exceed the requirements and recommendations of Sections 5.1 and 5.3 of ANSI N18.7-1972 and cover the following activities:
- a.
The applicable procedures recommended in Regulatory Guide 1.33, Appendix A, November 3, 1972; AMENDMENT N0.-442;4a7,4a8,4eQ;-4e2~,4W,-200,--'dHJ, 231 349
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 NINE MILE POINT NUCLEAR STATION, LLC LONG ISLAND LIGHTING COMPANY EXELON GENERATION COMPANY, LLC DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 172 Renewed License No. NPF-69
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found tha~:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 1 O CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 6
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-69 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 172, are hereby incorporated into this license.
Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION fd. ~Bra2Chief rv __ _
Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Dateoflssuance:
August 2, 2018
AITACHMENT TO LICENSE AMENDMENT NO. 172 RENEWED FACILITY OPERATING LICENSE NO. NPF-69 NINE MILE POINT NUCLEAR STATION, UNIT 2 DOCKET NO. 50-410 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License NPF-69 Page 4 TSs 5.3-1 License NPF-69 Page 4 TSs 5.3-1
(1)
(2)
(3) Maximum Power Level Exelon Generation is authorized to operate the facility at reactor core power levels not in excess of 3988 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 172, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Fuel Storage and Handling (Section 9.1, SSER 4)*
- a.
Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.
- b.
When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility.
- c.
The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and approved storage rack locations.
- d.
The New Fuel Storage Vault shall have no more than ten fresh fuel assemblies uncovered at any one time.
(4)
Turbine System Maintenance Program (Section 3.5.1.3.10, SER)
The operating licensee shall submit for NRC approval by October 31, 1989, a turbine system maintenance program based on the manufacturer's calculations of missile generation probabilities.
(Submitted by NMPC letter dated October 30, 1989 from C.D. Terry and approved by NRC letter dated March 15, 1990 from Robert Martin to Mr.
Lawrence Burkhardt, Ill).
The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-69 Amendment 117 tlire1:1~R 149, 141, 143, 144, 146, 146, 147, 169, 161, 162, 164, 166, 167, 168, 169, 169, 161, 163,164,165,166, 167, 168, 169, 170, 172
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3. 1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
NMP2 5.3-1 Amendment Q.+,-4a7r448, 172
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC PSEG NUCLEAR LLC DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 319 Renewed License No. DPR-44
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. DPR-44 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications. 7
- 3.
This license amendment is effective as of the date of its issuance.and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C\\ £ I u-
. V '-----
David J. Wrona, ranch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2018
AITACHMENT TO LICENSE AMENDMENT NO. 319 RENEWED FACILITY OPERATING LICENSE NO. DPR-44 PEACH BOITOM ATOMIC POWER STATION, UNIT 2 DOCKET NO. 50-277 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications {TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-44 Page 3 TSs 5.0-5 License DPR-44 Page 3 TSs 5.0-5
(5)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1)
Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 4016 megawatts thermal.
(2)
Technical Specifications (3)
(4)
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.
Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 1 O CFR 73.21.
Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),
including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 281 and modified by Amendment No. 301.
Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision:
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-44 Revised by letter dated October 28, 2004 Revised by letter dated May 29, 2007 Amendment No. 319 Page 3
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
PBAPS ur~IT 2 5.0-5 Amendment No. 319
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC PSEG NUCLEAR LLC DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 322 Renewed License No. DPR-56
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Renewed Facility Operating License No. DPR-56 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 322, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications. 8
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION 0
r
(} ~/
(__ __ } 7 'y -
David J. Wrona, Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 201 8
ATTACHMENT TO LICENSE AMENDMENT NO. 322 RENEWED FACILITY OPERATING LICENSE NO. DPR-56 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 DOCKET NO. 50-278 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-56 Page 3 TSs 5.0-5 License DPR-56 Page 3 TSs 5.0-5
(5)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1)
Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 4016 megawatts thermal.
(2)
Technical Specifications (3)
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 322, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.
Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.
Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),
including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 283 and modified by Amendment No. 304.
1 The Training and Qualification Plan and Safeguards Contingency Plan and Appendices to the Security Plan.
Renewed License No. DPR-56 Revised by letter dated October 28, 2004 Revised by letter dated November 5, 2004 Revised by letter dated May 29, 2007 Amendment No. 322 Page 3
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
PBAPS UNIT 3 5.0-5 Amendment No. 322
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 270 Renewed License No. DPR-29
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 9
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-29 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 270, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
/'\\
- /"
L)J 9 rv~
David J. Wrona, Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2 O 1 8
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 265 Renewed License No. DPR-30
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. 0
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8. of Renewed Facility Operating License No. DPR-30 is hereby amended to read as follows:
- 8.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 265, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
/,\\
G)G' 9 David J. Wrona, Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 2018
ATTACHMENT TO LICENSE AMENDMENT NOS. 270 AND 265 RENEWED FACILITY OPERATING LICENSES NOS. DPR-29 AND DPR-30 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications {TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-29 Page4 License DPR-30 Page4 TSs 5.3-1 License DPR-29 Page 4 License DPR-30 Page 4 TSs 5.3-1 B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 270, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The licensee shall maintain the commitments made in response to the D.
March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRG approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Un reviewed Safety Question, a license amendment shall be submitted to the NRG staff for review and approval prior to implementation of the change.
Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans1, which contain Safeguards Information protected under 1 O CFR 73.21, is entitled: "Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006.
Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The Exelon Generation Company CSP was approved by License Amendment No. 249 as modified by License Amendment No. 259.
F.
The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979 with supplements dated November 5, 1980, and 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-29 Amendment No. 270 B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 265, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The license shall maintain the commitments made in response to the D.
March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 1 O CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 1 O CFR 73.21, is entitled: "Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006.
Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),
including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 244 and modified by License Amendment No. 254.
F.
The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979 with supplements dated 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-30 Amendment No. 265
5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications Unit Staff Qualifications 5.3 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
Quad Cities 1 and 2 5.3-1 Amendment No. 270/265
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 R.E. GINNA NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-244 R.E. GINNA NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 129 Renewed License No. DPR-18
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-18 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 129, are hereby incorporated in the renewed license. Exelon Generation shall operate the facility in accordance with the Technical Specifications. 1
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION C\\
)~J 9 David J. Wrona, Branch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance:
August 2, 201 8
ATTACHMENT TO LICENSE AMENDMENTS NO. 129 RENEWED FACILITY OPERATING LICENSE NO. DPR-18 R.E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-18 Page 3 TSs 5.3-1 License DPR-18 Page 3 TSs 5.3-1 (b)
Exelon Generation pursuant to the Act and 10 CFR Part 70, to possess and use four (4) mixed oxide fuel assemblies in accordance with the RG&E's application dated December 14, 1979 (transmitted by letter dated December 20, 1979), as supplemented February 20, 1980, and March 5, 1980; (3)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 1 O CFR Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1)
Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state power levels up to a maximum of 1775 megawatts (thermal).
(2)
Technical Specifications (3)
The Technical Specifications contained in Appendix A, as revised through Amendment No. 129, are hereby incorporated in the renewed license.
Exelon Generation shall operate the facility in accordance with the Technical Specifications.
Fire Protection Exelon Generation shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensee's amendment request dated March 28, 2013, supplemented by letters dated December 17, 2013; January 29, 2014; February 28, 2014; September 5, 2014; September 24, 2014; December 4, 2014; March 18, 2015; June 11, 2015; August 7, 2015; June 30, 2017; October 25, 2017; and June 5, 2018, and as approved in the safety evaluation reports dated November 23, 2015, and June 25, 2018. Except where NRC approval for changes or deviations is required R. E. Ginna Nuclear Power Plant Amendment No. 129
I 5.0 ADMINISTRATIVE CONTROLS 5.3 Plant Staff Qualifications Plant Staff Qualifications 5.3 5.3.1 Each member of the plant staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
R.E. Ginna Nuclear Power Plant 5.3-1 Amendment 129
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 294 Renewed License No. DPR-50
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee) dated March 1, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Renewed Facility Operating License No. DPR-50 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 294, are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications. 2
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance. Implementation of this amendment shall include relocation of the requirements removed from technical specifications by this amendment to the Exelon Quality Assurance Topical Report.
FOR THE NUCLEAR REGULATORY COMMISSION
-\\
/
/
)
-( ~ i L/~--
David J. Wrona, ranch Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: August 2, 201 8
ATTACHMENT TO LICENSE AMENDMENT NO. 294 RENEWED FACILITY OPERATING LICENSE NO. DPR-50 THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 DOCKET NO. 50-289 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove License DPR-50 Page 4 TSs 6-3 License DPR-50 Page 4 TSs 6-3 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 294, are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1, submitted by letter dated May 17, 2006, is entitled: "Three Mile Island Nuclear Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 3." The set contains Safeguards Information protected under 1 O CFR 73.21.
Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP}, including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 275 and modified by License Amendment No. 288.
(4) Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the Fire Protection Program as described in the Updated FSAR for TMl-1.
Changes may be made to the Fire Protection Program without prior approval by the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided that interim compensate measures are implemented.
(5) The licensee shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
- a. Identification of a sampling schedule for the critical parameters and control points for these parameters;
- b. Identification of the procedures used to measure the values of the critical parameters;
- c.
Identification of process sampling points;
- d. Procedure for the recording and management of data; 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Amendment No. 294 Renewed Operating License No. DPR-50
6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
6.4 TRAINING 6.4.1 A training program for the Fire Brigade shall be maintained and shall meet or exceed the requirements of Section 600 of the NFPA Code.
6.5 DELETED 6-3 (Pages 6-4 through 6-8 deleted)
Amendment Nos. 44;~2;a2;-a5;+7;84,92;99,~~Q,4~4a2;4aQ,44+,44fH.W-r4+h4-79149a,4gij, 2-0+;-2-4-2;-2-4~~a9¢44.2a~.~e~.aes, 200, 2 94
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 197 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-72, AMENDMENT NO. 197 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-77, AMENDMENT NO. 203 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-37, AMENDMENT NO. 203 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-66 1 AMENDMENT NO. 325 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53, AMENDMENT NO. 303 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69, AMENDMENT NO. 219 TO FACILITY OPERATING LICENSE NO. NPF-62, AMENDMENT NO. 258 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-19, AMENDMENT NO. 251 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-25, AMENDMENT NO. 320 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-59, AMENDMENT NO. 229 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-11, AMENDMENT NO. 215 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-18, AMENDMENT NO. 231 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-39, AMENDMENT NO. 194 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-85, AMENDMENT NO. 231 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63, AMENDMENT NO. 172 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-69, AMENDMENT NO. 319 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-44, AMENDMENT NO. 322 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-56, AMENDMENT NO. 270 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29, AMENDMENT NO. 265 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30, AMENDMENT NO. 129 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-18, 3 AND AMENDMENT NO. 294 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-50.
EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2 BYRON STATION, UNIT NOS. 1 AND 2 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 CLINTON POWER STATION, UNIT NO. 1 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 JAMES A. FITZPATRICK NUCLEAR POWER PLANT LASALLE COUNTY STATION, UNITS 1 AND 2 LIMERICK GENERATING STATION, UNITS 1 AND 2 NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 R. E. GINNA NUCLEAR POWER PLANT THREE MILE ISLAND NUCLEAR STATION, UNIT 1 DOCKET NOS. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244, AND 50-289
1.0 INTRODUCTION
By application dated March 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18060A266), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Braidwood Station, Units 1 and 2 (Braidwood); Byron Station, Unit Nos. 1 and 2 (Byron); Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs); Clinton Power Station, Unit No. 1 (Clinton); Dresden Nuclear Power Station, Units 2 and 3 (Dresden); James A. FitzPatrick Nuclear Power Plant (FitzPatrick);
LaSalle County Station, Units 1 and 2 (LaSalle); Limerick Generating Station, Units 1 and 2 (Limerick); Nine Mile Point Nuclear Station, Units 1 and 2 (NMP-1 and NMP-2, respectively);
Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom); Quad Cities Nuclear PQwer Station, Units 1 and 2 (Quad Cities); R. E. Ginna Nuclear Power Plant (Ginna); and Three Mile Island Nuclear Station, Unit 1 (TMI) (the facilities). The amendments would revise the technical specifications (TSs) for each facility to relocate the licensee's staff qualification requirements to the Exelon Quality Assurance Topical Report (QATR).
Currently, the TSs for the facilities require, with specified exceptions, that the licensee's staff meet or exceed the minimum qualification requirements of either the American National Standards Institute (ANSI) N18.1-1971, "American National Standard Selection and Training of Nuclear Power Plant Personnel," or the ANSI/American Nuclear Society (ANS)-3.1-1978, "American National Standard for Selection and Training of Nuclear Power Plant Personnel."
The proposed changes would relocate these requirements, including any exceptions, to the Exelon QATR to support standardizing the qualifications for Exelon personnel.
2.0
2.1 REGULATORY EVALUATION
Description of Proposed Changes The licensee proposed to relocate the staff qualification requirements currently specified in the following TSs to the Exelon QATR:
- 1. TS 5.3.1 for Braidwood, Byron, Calvert Cliffs, Clinton, Dresden, LaSalle, NMP-2, Quad Cities, and Ginna;
- 3. TS 5.2.2.f, TS 5.3.1, and TS 5.3.2 for FitzPatrick;
- 4. TS 6.3.1 for Limerick;
Except for FitzPatrick TS 5.3.1, the current staff qualification requirements listed in these TSs will be relocated verbatim to the Exelon QATR. Currently, FitzPatrick TS 5.3.1 states: "Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions with exceptions specified in the Entergy Quality Assurance Program Manual (QAPM)." The application states that the information in FitzPatrick TS 5.3.1 was already incorporated into the Exelon QATR. In addition, the FitzPatrick facility operating license was transferred from Entergy to Exelon in 2017, so the reference to the Entergy QAPM is not applicable.
TS 5.3.1 for Braidwood and Byron will be revised to state:
Each member of the facility staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
TS 5.3.1 for Calvert Cliffs, Clinton, Dresden, FitzPatrick, LaSalle, NMP-2, Peach Bottom, and Quad Cities, and TS 6.3.1 for Limerick Unit 1, NMP-1, and TMI will be revised to state:
Each member of the unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
TS 6.3.1 for Limerick Unit 2 will be revised to state:
Each member of unit staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
TS 5.3.1 for Ginna will be revised to state:
Each member of the plant staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report.
The licensee has proposed to delete Peach Bottom TS 5.3.2, FitzPatrick TS 5.3.2, NMP-1 TS 6.3.2, TMI TS 6.3.2, and TMI TS 6.3.3.
The licensee has proposed to revise FitzPatrick TS 5.2.2.f to state (emphasis added to indicate revised text):
When in MODES 1, 2, or 3 an individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operations of the unit.
This individual shall meet the qualifications specified in the Exelon Quality Assurance Topical Report. of the application provided mark-up of the proposed changes to the Exelon QA TR The proposed changes to the Exelon QA TR also included changes associated with Oyster Creek Nuclear Generating Station and other editorial changes. The U.S. Nuclear Regulatory Commission (NRC or Commission) staff did not review the Exelon QATR changes associated with Oyster Creek Nuclear Generating Station, and did not review other changes to the QATR not directly related to the requested amendments. Changes to the quality assurance program must be made in accordance with Title 1 O of the Code of Federal Regulations ( 10 CFR) Section 50.54(a).
2.2 Regulatory Requirements and Guidance The NRC staff considered the following regulatory requirements and guidance in its review of the application.
The regulations in paragraph (c)(5) of 10 CFR 50.36, Technical specifications," provides requirements for the content of the TS in the category of administrative controls.
The regulations in 1 O CFR 50.120, Training and qualification of nuclear power plant personnel,"
require training and qualification for personnel to operate and maintain the facility in a safe manner in all modes of operation.
Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR 50 provides requirements for quality assurance programs. The regulations in 10 CFR 50.54(a) provides requirements for making changes to quality assurance programs.
Paragraph 50.54(a)(3) of 10 CFR states, in part, that:
Each licensee described in [10 CFR 50.54(a)(1)] may make a change to a previously accepted quality assurance program description included or referenced in the Safety Analysis Report without prior NRC approval, provided the change does not reduce the commitments in the program description as accepted by the NRC. Changes to the quality assurance program description that do not reduce the commitments must be submitted to the NRC in accordance with the requirements of [10 CFR] 50. 71 ( e ).
Paragraph 50.54(a)(4) of 10 CFR requires changes to the quality assurance program that do reduce commitments to be submitted to the NRC and receive NRC approval prior to implementation.
Section 13.2.2, "Non-Licensed Plant Staff Training" (ADAMS Accession No. ML15006A129), of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: [Light-Water Reactor] LWR Edition," provides guidance for the review of training programs for non-licensed plant staff.
NRC Administrative Letter (AL) 95-06, "Relocation of Technical Specification Administrative Controls Related to Quality Assurance," dated December 12, 1995 (ADAMS Accession No. ML031110271 ), provides guidance for relocating requirements from the administrative controls section of TSs in cases where adequate controls are provided by other methods.
AL 95-06 notes that the quality assurance program is a logical candidate for such relocations due to the controls imposed on the quality assurance program by regulations (e.g., 10 CFR 50, Appendix B, and 10 CFR 50.54(a)), and the existence of NRG-approved quality assurance plans and commitments to industry quality assurance standards.
NRC Regulatory Guide (RG) 1.8, Revision 3, "Qualification and Training of Personnel for Nuclear Power Plants," dated May 2000 (ADAMS Accession No. ML003706932), provides guidance that is acceptable to the NRC staff regarding training and qualifications of nuclear power plant personnel. Revision 1 of RG 1.8 endorsed ANSI N18.1-1971 with one exception.1 Revision 2 (April 1987) of RG 1.8 endorsed ANSI/ANS-3.1-1981 for certain positions and ANSI N18.1-1971 for other positions, with exceptions, clarifications, and additions. Revision 3 of RG 1.8 endorsed ANSI/ANS-3.1-1993, with exceptions, clarifications, and additions.
3.0 TECHNICAL EVALUATION
The proposed amendments would relocate the licensee's staff qualification requirements currently in the TSs for each facility to the Exelon QATR. Except for FitzPatrick TS 5.3.1, the current staff qualification requirements will be relocated verbatim to the Exelon QATR. The application stated that the information in FitzPatrick TS 5.3.1 was already incorporated into the Exelon QATR. In addition, the FitzPatrick facility operating license was transferred from Entergy to Exelon in 2017, so the reference to the Entergy QAPM is not applicable. Exelon's proposed changes are similar to changes that the NRC approved for the Tennessee Valley Authority (ADAMS Accession No. ML17034A360).
The NRC staff considered the regulations and guidance in Section 2.2 of this safety evaluation in its review of the licensee's application. The application stated that the licensee's staff qualification requirements for each facility will be relocated to the Exelon QATR verbatim, with the exceptions noted for FitzPatrick. In addition, the application does not propose any reduction in commitments in the quality assurance programs. Therefore, the licensee's staff qualification requirements will not be changed by this amendment, and these requirements remain consistent with RG 1.8. In addition, the relocation of the licensee's staff qualification requirements to the Exelon QATR is consistent with the guidance in AL 95-06 and with past precedent.
1 Revision 1 of RG 1.8 was originally published in September 1975 and was republished in May 1977 as Revision 1-R.
The NRC staff concludes that the requirements of 10 CFR 50.36 and 50.120 will continue to be met because the licensee's staff qualification requirements will not be changed by these amendments. In addition, future changes to the licensee's staff qualification requirements that are relocated to the Exelon QATR must be made in accordance with 10 CFR 50.54(a). Future reduction in commitments associated with the licensee's staff qualification requirements that are relocated to the Exelon QATR will require NRC approval, per 10 CFR 50.54(a)(4), prior to implementation. Therefore, the proposed TS changes and relocation of the licensee's staff qualification requirements to the Exelon QATR are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois, Maryland, Pennsylvania, and New York State officials were notified of the proposed issuance of the amendments on July 23, 2018.
The State officials had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments relate to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: J. Hughey, NRR P. Natividad, NRO Date of issuance:
August 2, 2018
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; JAMES A. FITZPATRICK NUCLEAR POWER PLANT; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; R. E. GINNA NUCLEAR POWER PLANT; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - ISSUANCE OF AMENDMENTS TO RELOCATE THE STAFF QUALIFICATION REQUIREMENTS (EPID L-2018-LLA-0053)
DATED AUGUST 2, 2018 DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1 Resource RidsNrrDorlLpl3 Resource RidsRgn1 MailCenter Resource RidsRgn3Mai1Center Resource RidsNrrLABClayton Resource RidsNrrLASRohrer Resource RidsNrrLAJBurkhardt Resource RidsAcrs_MailCTR Resource RidsNrrPMExelon Resource RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMCalvertCliffs Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMFitzPatrick Resource RidsNrrPMLaSalle Resource RidsNrrPMLimerick Resource RidsNrrPMNineMilePoint Resource RidsNrrPMPeachBottom Resource RidsNrrPMQuadCities Resource RidsNrrPMREGinna Resource RidsNrrPMThreeMilelsland Resource RidsNrrDraAphb Resource RidsNrrDssStsb Resource CTilton, NRR T Jackson, NRO KKavanagh, NRO JHughey, NRR PNatividad, NRO PPrescott, NRO ADAMS A ccess1on N AMO ML18206A282 o.:
- b iy memo I**
ema1 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/PM DRA/APHB/BC*
NAME BPurnell SRohrer JWiebe CJFong (MKichline for)
DATE 7/31/18 7/30/18 8/1/18 6/29/18 OFFICE NRO/DCIP/QVIB2/BC*
DSS/STSB/BC**
OGC NLO**
DORL/LPL3/BC NAME KKavanagh (Tlamb for)
VCusumano BHarris DWrona DATE 7/20/18 7/24/18 7/25/18 8/2/18 OFFICE DORL/LPL3/PM NAME BPurnell DATE 8/2/18 OFFICIAL RECORD COPY