Issuance of Amendment Application for Order Approving Direct Transfer of Renewed Facility Operating License & Independent Spent Fuel Storage Installation General License & Conforming Amendment (CAC No. MG0014; EPID L-2017-LLM-0004)
ML17313A077
Person / Time
Site: FitzPatrick  Constellation icon.png
Issue date: 11/30/2017
From: Booma Venkataraman
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Venkataraman B, NRR/DORL/LPL1
References
CAC MG0014, EPID L-2017-LLM-0004
Download: ML17313A077 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2017 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - ISSUANCE OF AMENDMENT RE: APPLICATION FOR ORDER APPROVING DIRECT TRANSFER OF RENEWED FACILITY OPERATING LICENSE AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION GENERAL LICENSE AND CONFORMING AMENDMENT (CAC NO. MG0014; EPID L-2017-LLM-0004)

Dear Mr. Hanson:

By order dated November 7, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17240A069), the U.S. Nuclear Regulatory Commission (NRC or the Commission), approved the transfer of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick) Renewed Facility Operating License No. DPR-59 and the generally licensed FitzPatrick Independent Spent Fuel Storage Installation from Exelon Generation Company, LLC (Exelon Generation) to Exelon FitzPatrick, LLC. In order to facilitate this transfer, Exelon Generation requested NRC approval of the proposed license amendment in its application dated July 24, 2017 (ADAMS Accession No. ML17206A395). The amendment modifies FitzPatrick's Renewed Facility Operating License to reflect this transfer.

Accordingly, the Commission has issued the enclosed Amendment No. 317 to Renewed Facility Operating License No. DPR-59 for FitzPatrick.

B. Hanson A copy of the related Safety Evaluation was enclosed with the letter dated November 7, 2017.

Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

~.~~

Booma Venkataraman, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-333 and 72-012

Enclosure:

Amendment No. 317 to DPR-59 cc w/

Enclosure:

Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 317 License No. DPR-59

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Exelon Generation Company, LLC, and its wholly owned subsidiary, Exelon FitzPatrick, LLC, dated July 24, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure

2. Accordingly, the license is amended by changes as indicated in the attachment to this license amendment.
3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Michele G. Evans, Deputy Director for Reactor Safety Programs and Mission Support Office of Nuclear Reactor Regulation.

Attachment:

Changes to Renewed Facility Operating License No. DPR-59 Date of Issuance: November 30, 2017

ATTACHMENT TO LICENSE AMENDMENT NO. 317 JAMES A. FITZPATRICK NUCLEAR POWER PLANT RENEWED FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Replace the following pages of the renewed facility operating license with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Page Insert Page 1 1 2 2 7 7 8 8

EXELON FITZPATRICK, LLC AND EXELON GENERATION COMPANY, LLC DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-59

1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in Facility Operating License No. DPR-59, dated November 21, 2000, has found that:

A. The application to renew Facility Operating License No. DPR-59 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to:

(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations; D. There is reasonable assurance (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; E. Exelon FitzPatrick, LLC ("Exelon FitzPatrick") and Exelon Generation Company, LLC ("Exelon Generation Company") are financially and technically qualified to engage in the activities authorized by this renewed operating license; F. Exelon FitzPatrick and Exelon Generation Company have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; Amendment 317 Renewed License No. DPR-59

H. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with the Commission's regulations; in 10 CFR Parts 30, 40, and 70, including 10 CFR Sections 30.33, 40.32, 70.23, and 70.31; and I. The issuance of this renewed operating license is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, Facility Operating License No. DPR-59 (previously issued to the Power Authority of the State of New York and Niagara Mohawk Power Corporation pursuant to the Atomic Safety and Licensing Board's Initial Decision and Supplemental Initial Decision dated November 12, 1973, and January 10, 1974, respectively; and the Atomic Safety and Licensing Appeal Board's Decision dated January 29, 1974) as previously amended and transferred to Entergy Nuclear FitzPatrick, LLC (ENF) and Entergy Nuclear Operations, Inc. (ENO) dated November 21, 2000, is superseded by Renewed Facility Operating License No. DPR-59, hereby issued to Exelon FitzPatrick and Exelon Generation Company to read as follows:

A. This renewed operating license applies to the James A. FitzPatrick Nuclear Power Plant, a boiling water nuclear reactor and associated equipment (the facility), owned by Exelon FitzPatrick and operated by Exelon Generation Company (collectively, the licensees). The facility is located in Scriba, Oswego County, New York, and is described in the "Final Safety Analysis Report," as supplemented and amended, and the Environmental Report, as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

( 1) Pursuant to Section 104b of the Act and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," (a) Exelon FitzPatrick as the owner to possess and (b) Exelon Generation Company as the operator to possess, use, and operate the facility at the designated location in Scriba, Oswego County, New York, in accordance with the procedures and limitations set forth in this renewed operating license; (2) Exelon Generation Company pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Exelon Generation Company pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Amendment 317 Renewed License No. DPR-59

N. DELETED

0. DELETED P. For purposes of ensuring public health and safety, Exelon Generation Company, upon the transfer of this license to it, and upon transfer of decommissioning funds from ENF to Exelon Generation Company shall provide decommissioning funding assurance for the facility, to be held in a decommissioning trust fund for the facility by the prepayment or equivalent method, of no less than the amount required under NRC regulations at 10 CFR 50. 75. Any amount held in any decommissioning trust maintained by Exelon Generation Company for the facility after the transfer of the facility license to Exelon Generation Company may be credited towards the amount required under this paragraph.

Q. Exelon Generation Company shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for the transfer of this license to Exelon Generation Company, and the requirements of the order approving the transfer and order approving the transfer of decommissioning funds from PASNY to Entergy Nuclear Operations, Inc., and consistent with the safety evaluations supporting such orders.

R. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Amendment 317 Renewed License No. DPR-59

S. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

T. License Renewal - UFSAR supplement submitted pursuant to 10 CFR 54.21(d),

as revised during the license renewal application review process, and as supplemented by Appendix A of NUREG-1905, "Safety Evaluation Report Related to the License Renewal of James A. FitzPatrick Nuclear Power Plant,"

dated April 2008, describes certain programs to be implemented and activities to be completed prior to the period of extended operation (PEO).

a. The licensee shall implement those new programs and enhancements to existing programs no later than the PEO date.
b. The licensee shall complete those inspection and testing activities by the PEO date.

The licensee shall notify the NRC in writing within 10 days after having accomplished item (a) above and include the status of those activities that have been or remain to be completed in item (b) above.

U. UFSAR Supplement Changes - The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the UFSAR required by the 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, Exelon Generation Company may make changes to the programs and activities described in the supplement without prior Commission approval, provided that Exelon Generation Company evaluate such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

V. Capsule withdrawal schedule - All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

W. Exelon FitzPatrick shall take no action to cause Exelon Generation Company or its parent company, and Exelon Generation Company shall not take any action, to void, cancel, or modify the $100 million Support Agreement to provide funding for the facility as represented in the application for approval of the transfer of direct ownership of and the license to own the facility from Exelon Generation Company to Exelon FitzPatrick, without the prior written consent of the Director, Office of Nuclear Reactor Regulation.

Amendment 317 Renewed License No. DPR-59

ML17313A077 *by e-mail OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA OGC- NLO* NRR/DORL/LPL 1/BC NAME BVenkataraman LRonewicz AGhosh JDanna DATE 11/13/2017 11/13/2017 11/14/2017 11/20/2017 OFFICE NRR/DORL/D(A) NRR/DD NRR/DORL/LPL 1/PM NAME KBrock (EBenner for) MEvans BVenkataraman DATE 11/20/2017 11/28/2017 11/30/2017