Line 55: Line 55:
Proposed Technical Specification Changes -  TS Page 3.6.3-4 Markup  
Proposed Technical Specification Changes -  TS Page 3.6.3-4 Markup  


ACTIONS (continued)  
ACTIONS (continued)
: c. CONDITION  
: c. CONDITION  
--------NOTE --------C .1 Only applicable to penetration fl ow paths with one or more containment isolation valves and a closed system. One or more penetration flow paths with one or more containment isolation valves inoperable.
--------NOTE --------C .1 Only applicable to penetration fl ow paths with one or more containment isolation valves and a closed system. One or more penetration flow paths with one or more containment isolation valves inoperable.

Revision as of 05:02, 25 April 2019

Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk ..
ML18239A260
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/27/2018
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18239A260 (4)


Text

200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.90

August 27, 2018

U.S. Nuclear Regulatory Commission

ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt

Risk Informed Completion Times TSTF-505, Revision 1, "Provide Risk-

Informed Extended Completion Times - RITSTF Initiative 4b."

Reference:

Letter from James Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, Response to Request for Additional Information, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b," dated January 11, 2018 (ADAMS Accession No. ML18011A665).

By letter dated January 11, 2018 (Reference), Exelon provided a response to a request for additional information (RAI) concerning the subject amendment request. As part of the response to the RAI, several affected Technical Specifications (TS) were deleted from the amendment request. As a result, Exelon provided a complete set of revised TS markups in the RAI response which superseded the set of TS markups previously provided by Exelon.

Subsequently, it was identified that a TS markup (TS Page 3.6.3-4) had inadvertently been

omitted from the response to the RAI. Theref ore, Exelon is now providing the TS markup in Attachment 1 to this letter. With the inclusion of this TS markup with the TS markups provided in the RAI response, the TS markups for the subject amendment request are now

complete.

Exelon has reviewed the information supporting a finding of no significant hazards consideration, and the environmental considerat ion, that were previously provided to the NRC in Attachment 1 of the Reference 1 letter. Exelon has concluded that the information provided in this letter does not affect the bases for concluding that the proposed license Supplement to Response to Request for Additional Information License Amendment Request Adopt Risk Informed Completion Times TSTF-505 Docket Nos. 50-317 and 50-318 August 27, 2018 Page 2 amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, Exelon has concluded that the information in this letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

There are no regulatory commitments in this letter. In accordance with 10 CFR 50.91, "Notice for public comment; State consultation

," paragraph (b), Exelon is notifying the State of Maryland of this supplement by transmitting a copy of this letter and its attachment to the designated State Official.

If you have any questions or require additional information , please contact Glenn Stewart at 610-765-5529.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27th day of August 2018. Respectfully , David P. Helker Manager -Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments

1. Proposed Technical Specifications Changes -TS Page 3.6.3-4 Markup cc: USNRC Region I, Regional Administrator USNRC Project Manager, CCNPP USNRC Senior Resident Inspector, CCNPP D. A. Tancabel, State of Maryland ATTACHMENT 2 License Amendment Request Supplement

Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-317 and 50-318

Supplement to Response to Request for Additional Information Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b."

Proposed Technical Specification Changes - TS Page 3.6.3-4 Markup

ACTIONS (continued)

c. CONDITION

NOTE --------C .1 Only applicable to penetration fl ow paths with one or more containment isolation valves and a closed system. One or more penetration flow paths with one or more containment isolation valves inoperable.

C.2 D. Required Action and D.1 associated Completion Time not met. AND Containment Isolation Valves 3.6.3 REQUIRED ACTION Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. --------NOTE


Isolation devices in high radiation areas may be verified by use of administrative means. Verify the affected penetration flow path is isolated.

Be in MODE 3. COMPLETION TIME lt\ O..Cc..or-d

<l.."c.L t\.,.q_ 'R \ 5. \:.. l ('i CoM-p 'v\,. "" T, Mt.. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> CALVERT CLIFFS -UNIT 1 3.6.3-4 CALVERT CLIFFS -UNIT 2 Amendment No. 227 Amendment No. 201