ML050600267

From kanterella
Jump to navigation Jump to search

Technical Specifications, Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications
ML050600267
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/24/2005
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To: Vanderheyden G
Calvert Cliffs
References
TAC MC4019, TAC MC4020
Download: ML050600267 (3)


Text

Reporting Requirements 5.6 5.6 Reporting Requirements ii. CEN-119(B)-P, "BASSS, Use of the Incore Detector System to Monitor the DNB-LCO on Calvert Cliffs Unit 1 and Unit 2"-

iii. Letter from Mr. G. C. Creel (BG&E) to NRC Document Control Desk, dated February 7, 1989, "Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket 50-318, Request for Amendment, Unit 2 Ninth Cycle License Application" iv. Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. G. C. Creel (BG&E), dated January 10, 1990, "Safety Evaluation Report Approving Unit 2 Cycle 9 License Application"

42. Letter from Mr. D. G. McDonald, Jr. (NRC) to Mr. R. E. Denton (BGE), dated May 11, 1995, "Approval to Use Convolution Technique in Main Steam Line Break Analysis - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos. M90897 and M90898)
43. CENPD-387-P-A, "ABB Critical Heat Flux Correlations for PWR Fuel"
44. CENPD-199-P, Supplement 2-P-A, Appendix A, "CE Setpoint Methodology"
45. CENPD-404-P-A, "Implementation of ZIRLOTh Cladding Material in CE Nuclear Power Fuel Assembly Designs"
46. CENPD-132, Supplement 4-P-A, "Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model"
47. CENPD-137, Supplement 2-P-A, "Calculative Methods for the ABB CE Small Break LOCA Evaluation Model"
48. WCAP-11596-P-A, "Qualification of the PHOENIX-P, ANC Nuclear Design System for Pressurized Water Reactor Cores" CALVERT CLIFFS - UNIT 1 5.6-8 Amendment No.271 CALVERT CLIFFS - UNIT 2 Amendment No.248

Reporting Requirements 5.6 5.6 Reporting Requirements

49. WCAP-10965-P-A, "ANC: A Westinghouse Advanced Nodal Computer Code"
50. WCAP-10965-P-A Addendum 1, "ANC: A Westinghouse Advanced Nodal Computer Code; Enhancements to ANC Rod Power Recovery"
51. WCAP-16072-P-A, "Implementation of Zirconium Diboride Burnable Absorber Coatings in CE Nuclear Power Fuel Assembly Designs"
52. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON"
c. The core operating-limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, ECCS limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any mid cycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 Not Used 5.6.7 Post-Accident Monitoring Renort When a report is required by Condition B or G of LCO 3.3.10, "Post Accident Monitoring Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

CALVERT CLIFFS - UNIT 1 5.6-9 Amendment No. 271 CALVERT CLIFFS - UNIT 2 Amendment No. 248

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.8 Tendon Surveillance Report Any abnormal degradation of the containment structure detected during the tests required by the Pre-Stressed Concrete Containment Tendon Surveillance Program shall be reported to the NRC within 30 days. The report shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective action taken.

5.6.9 Steam Generator Tube Inspection Report

a. Following each inservice inspection of steam generator tubes, the number of tubes plugged or repaired in each steam generator shall be reported to the NRC within 15 days.
b. The complete results of the steam generator tube inservice inspection during the report period shall be submitted to the NRC prior to March 1 of each year. This report shall include:
1. Number and extent of tubes inspected;
2. Location and percent of wall-thickness penetration for each indication of an imperfection; and
3. Identification of tubes plugged or repaired.
c. Results of steam generator tube inspections which fall into Category C-3 require verbal notification of the NRC Regional Administrator by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to resumption of plant operation. The written follow-up of this report shall provide a description of investigations conducted to determine cause of the tube degradation and corrective measures taken to prevent recurrence and shall be submitted within the next 30 days.

CALVERT CLIFFS - UNIT 1 5.6-10 Amendment No. 271 CALVERT CLIFFS - UNIT 2 Amendment No. 248