Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23317A103 | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23241A843 | 29 August 2023 | Enclosure 3 - Response to Request for Additional Information - Non-Proprietary Version | Ultimate heat sink |
ML23241A841 | 29 August 2023 | Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | |
ML23166A105 | 15 June 2023 | Response to Request for Additional Information Related to the License Amendment Request to Modify the Long-Term Coupon Surveillance Program | |
ML23155A001 | 4 June 2023 | Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request - One-Time Extension of the Control Room Emergency Ventilation System (C | |
RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator | 7 December 2022 | Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator | |
RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . | 17 June 2022 | Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . | Hydrostatic Incorporated by reference |
RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . | 20 May 2022 | Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . | Non-Destructive Examination |
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated | 23 February 2022 | Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P | Surveillance Frequency Control Program |
ML21334A342 | 30 November 2021 | Supplement to Response to Request for Additional Information Regarding the Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Design Basis License Amendment Request | Hydrostatic |
ML21320A242 | 16 November 2021 | Stations - Response to Request for Additional Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | |
ML21308A507 | 4 November 2021 | Supplement to Response to Request for Additional Information Regarding the Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Design Basis License Amendment Request | |
ML21298A043 | 25 October 2021 | Response to Request for Additional Information Regarding the Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Design Basis License Amendment Request | Earthquake |
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | 16 September 2021 | Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | |
ML21208A007 | 26 July 2021 | Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-567 Rev 1, Add Containment Sump TS to Address GSI-191 Issues | Probabilistic Risk Assessment |
NMP2L2773, Company - Response to Request for Additional Information | 30 June 2021 | Company - Response to Request for Additional Information | Boric Acid |
JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | 11 June 2021 | Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | |
JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | 20 April 2021 | Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | |
RS-20-017, Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-885 | 1 February 2021 | Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-885 | Foreign Material Exclusion |
ML20317A112 | 12 November 2020 | Final Response and Close-out to Generic Letter 2004-02 | Mission time Fire Barrier Coatings Operating Basis Earthquake FLEX Foreign Material Exclusion Severe Accident Management Guideline Exemption Request Earthquake Maintenance Rule Program Scaffolding |
ML20280A513 | 6 October 2020 | Response to Request for Additional Information - End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval | |
ML20188A264 | 6 July 2020 | Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information | Incorporated by reference |
ML20182A110 | 30 June 2020 | Response to Request for Additional Information to License Amendment Request - Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements Voltage | Stroke time |
ML20107F765 | 16 April 2020 | Response to Request for Additional Information to License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program | |
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | 16 October 2019 | Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 | Boric Acid Nondestructive Examination |
ML19282B718 | 9 October 2019 | Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | |
ML19277D103 | 3 October 2019 | Response to Request for Additional Information Revised - Final Response to Generic Letter 2004-02 | High Radiation Area Coatings |
ML19217A337 | 6 August 2019 | Response to RAI #6 Regarding the Application to Adopt 10 CFR 50.69 | |
ML19217A143 | 5 August 2019 | Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | |
ML19200A216 | 19 July 2019 | Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Seismically rugged Large early release frequency Earthquake |
ML19183A012 | 1 July 2019 | Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ... | Internal Flooding FLEX |
JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 | 4 June 2019 | Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 | |
NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants | 1 May 2019 | Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants | |
JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 | 8 January 2019 | Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 | Commercial Grade Dedication Nondestructive Examination |
ML18316A034 | 12 November 2018 | Response to Request for Additional Information: Proposed Changes to Technical Specification 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to 14 ... | FLEX Offsite Circuit |
ML18283A034 | 10 October 2018 | Supplement to Final Response to Generic Letter 2004-02, Dated August 13, 2018 | |
ML18239A260 | 27 August 2018 | Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk .. | High Radiation Area |
ML18201A406 | 21 June 2018 | Plants, Units 1 and 2 - Exelon'S Response to NRC Questions | |
ML18172A145 | 21 June 2018 | Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed ... | Safe Shutdown Probabilistic Risk Assessment FLEX Seismically rugged Surveillance Frequency Control Program Large early release frequency Spent Fuel Pool Instrumentation Earthquake |
NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. | 10 May 2018 | Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. | High winds Earthquake Fuel cladding |
RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) | 2 May 2018 | Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) | Decommissioning Funding Plan Authorized possession limits |
ML18047A124 | 16 February 2018 | Relief Requests Associated with Fifth Ten-Year Lnservice Testing Interval: Supplement 1 - Response to Request for Additional Information | |
ML18025A799 | 25 January 2018 | Response to Request for Additional Information Regarding Generic Letter 2016-01 | Aging Management |
ML18018B340 | 18 January 2018 | Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times. | Probabilistic Risk Assessment |
ML18011A665 | 11 January 2018 | Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times. | High winds High Radiation Area Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Surveillance Frequency Control Program Large early release frequency TORMIS Tornado Missile Risk Evaluator Offsite Circuit |
RS-17-053, Response to Request for Additional Information Regarding Generic Letter 2016-01 | 27 April 2017 | Response to Request for Additional Information Regarding Generic Letter 2016-01 | Safe Shutdown Earthquake Earthquake |
ML17081A303 | 22 March 2017 | Response to Request for Additional Information to License Amendment Request - Control Room Emergency Ventilation System | Safe Shutdown |
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 13 March 2017 | Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
RS-17-003, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | 5 January 2017 | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | High winds Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML16246A202 | 1 September 2016 | Response to Request for Additional Information Regarding Relief Request for Dissimilar Metal Butt Weld Examinations | Nondestructive Examination Dissimilar Metal Weld |