Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24121A1802024-05-31031 May 2024 Issuance of Amendment Nos. 350 and 327 Adoption of Technical Specifications Task Force Traveler TSTF-59-A, Revision 1 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23164A1702023-06-13013 June 2023 License Amendment Request to Adopt TSTF-59-A, Incorporate (Combustion Engineering) NPSD-994 Recommendations Into the (Safety Injection Tanks) Specification, Revision 1 ML23153A0982023-06-0202 June 2023 Emergency License Amendment Request - One-Time Extension of the Control Room Emergency Ventilation System (CREVS) Technical Specification RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23052A0632023-02-21021 February 2023 License Amendment Request to Modify the Long-Term Coupon Surveillance Program ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-017, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions for Calvert Cliffs2022-04-20020 April 2022 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions for Calvert Cliffs ML22067A0772022-03-31031 March 2022 Correction of License Amendment Nos. 337 and 315 to Revise Response Time Testing Definition RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments ML20329A3342020-11-24024 November 2020 Application to Revise Technical Specifications to Adopt TSTF-567 Rev 1, Add Containment Sump TS to Address GSI-191 Issues ML19347A7792019-12-12012 December 2019 License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies ML19346E5362019-12-11011 December 2019 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances RS-19-092, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions2019-12-0909 December 2019 Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions ML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19127A0762019-05-0606 May 2019 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML18333A0222018-11-28028 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... ML18113A0902018-04-20020 April 2018 Administrative Change to Technical Specification 5.2.2, Unit Staff RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML17164A1422017-05-31031 May 2017 Enclosure 2B - EAL Red-Line Basis Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 ML17164A1412017-05-31031 May 2017 Enclosure 2A - EAL Comparison Matrix Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 ML17164A1452017-05-31031 May 2017 Enclosure 2E - Procedure Matrix for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 ML17164A1432017-05-31031 May 2017 Enclosure 2C - EAL Basis Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process ML17087A3742017-03-28028 March 2017 License Amendment Request, Refueling Water Tank ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16060A2232016-02-25025 February 2016 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. ML16035A2272016-02-0404 February 2016 License Amendment Request - Change to Surveillance Requirement 3.5.3.1 ML15310A0642015-11-0505 November 2015 License Amendment Request to Relocate Surveillance Frequency Requirements ML15212A9022015-07-30030 July 2015 Supplemental Information Regarding TSTF-425 License Amendment Request ML15210A3142015-07-29029 July 2015 License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel RA-14-057, License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 82014-08-29029 August 2014 License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 ML14050A3742014-02-13013 February 2014 License Amendment Request Re Pressurizer Safety Valve Technical Specification Revision ML14050A3752014-02-13013 February 2014 Summary of Analysis Supporting Pressurizer Safety Valve Technical Change ML14015A1382014-01-13013 January 2014 License Amendment Request: Add Technical Specification for Atmospheric Dump Valves ML13308A3872013-10-31031 October 2013 Application for Technical Specification Improvement to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. ML13228A2652013-08-14014 August 2013 Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment Request ML13232A1562013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2 ML13030A1332013-01-28028 January 2013 License Amendment Request Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO 2024-05-31
[Table view] Category:Technical Specification
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-008, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin2022-01-24024 January 2022 Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin ML21278A2972021-09-0707 September 2021 6 to Technical Specification Bases ML21165A4062021-06-14014 June 2021 Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Design Basis License Amendment Request ML19346E5362019-12-11011 December 2019 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19127A0762019-05-0606 May 2019 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML18239A2602018-08-27027 August 2018 Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk .. ML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... ML18172A1452018-06-21021 June 2018 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed ... ML18262A0962018-03-0606 March 2018 Technical Specification Bases, Revisions 62 Through 63 ML17261A2342017-07-19019 July 2017 Bases 3.7, Plant Systems, Revisions; B 3.7.1-1 Through B 3.7.18-3 ML17261A2252017-07-19019 July 2017 Bases 3.2, Power Distribution Limits, Revisions; B 3.2.1-1 Through B 3.2.5-5 ML17261A2352017-07-19019 July 2017 Bases 3.8, Electric Power Systems, Revisions; B 3.8.1-1 Through B 3.8.10-5 ML17261A2272017-07-19019 July 2017 Bases 3.3, Instrumentation, Revisions; B 3.3.1-18 Through B 3.3.12-4 ML17261A2212017-07-19019 July 2017 Bases 2.0, Safety Limits, Revision 2; B 2.1.1-1 Through B 2.1.2-4 ML17261A2192017-07-19019 July 2017 Technical Specification Bases ML17261A2312017-07-19019 July 2017 Bases 3.5, Emergency Core Cooling System (Eccs), Revisions; B 3.5.1-1 Through B 3.5.5-5 ML17261A2232017-07-19019 July 2017 Bases 3.1, Reactivity Control Systems, Revisions; B 3.1.1-1 Through B 3.1.8-5 ML17261A2322017-07-19019 July 2017 Bases 3.0, Containment System, Revisions; B 3.0.1-1 Through B 3.0.8-4 ML17261A2292017-07-19019 July 2017 Bases 3.4, Reactor Coolant System(Rcs), Revisions; B 3.4.1-1 Through B 3.4318-8 ML17261A2382017-07-19019 July 2017 Bases 3.9, Refueling Operations, Revisions; B 3.9.1-1 Through B 3.9.6-2 ML17261A2222017-07-19019 July 2017 Basis 3.0, Limiting Condition for Operation (LCO) Applicability, Revisions; B 3.0-1 Through B 3.0-25 ML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System ML16258A0762016-09-0808 September 2016 Technical Specification Bases B 3.2, Power Distribution Limits - Linear Heat Rate (Lhr) ML16258A0732016-09-0808 September 2016 Technical Specification Bases B 2.1.1-1, Safety Limits ML16258A0772016-09-0808 September 2016 Technical Specification Bases B 3.3.1, Reactor Protective System (RPS) Instrumentation-Operating ML16258A0722016-09-0808 September 2016 Inc. - Technical Specification Bases, Unit Nos. 1 and 2 ML16258A0742016-09-0808 September 2016 Technical Specification Bases B 3.0-1, Limiting Condition for Operation (LCO) Applicability ML16258A0842016-09-0808 September 2016 Technical Specification Bases B 3.9.1, Refueling Operations, Boron Concentration ML16258A0802016-09-0808 September 2016 Technical Specification Bases B 3.5.1, Emergency Core Cooling System (Eccs), Safety Injection Tanks (Sits) ML16258A0812016-09-0808 September 2016 Technical Specification Bases B 3.6, Containment Systems ML16258A0752016-09-0808 September 2016 Technical Specification Bases B 3.1, Reactivity Control Systems ML16258A0832016-09-0808 September 2016 Technical Specification Bases B 3.8.1, Electrical Power Systems, AC Sources-Operating ML16258A0822016-09-0808 September 2016 Technical Specification Bases B 3.7.1, Plant Systems, Main Steam Safety Valves (Mssvs) ML16258A0782016-09-0808 September 2016 Technical Specification Bases B 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15257A2002015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 8 of 12 ML15257A2032015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 11 of 12 ML15257A1992015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 7 of 12 ML15257A1982015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 6 of 12 ML15257A1972015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 5 of 12 ML15257A1962015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 4 of 12 ML15257A1952015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 3 of 12 ML15257A1942015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 2 of 12 ML15257A1932015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 1 of 12 ML15257A2022015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 10 of 12 2024-04-12
[Table view] Category:Amendment
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. ML19346E5362019-12-11011 December 2019 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19127A0762019-05-0606 May 2019 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML18239A2602018-08-27027 August 2018 Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk .. ML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... ML18172A1452018-06-21021 June 2018 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed ... ML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML1003405862010-01-29029 January 2010 License Amendment Request: Pressurizer Safety Valve Technical Specification Revision ML0911700492009-04-23023 April 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 ML0821804962008-08-27027 August 2008 Technical Specifications, Amendment No. 288 ML0811601412008-04-23023 April 2008 Tech Spec Pages for Amendments 286 and 263 Modification of Technical Specification Definitions ML0731701802007-11-0808 November 2007 License Amendment Request: Modify Technical Specification Definitions ML0727007162007-09-27027 September 2007 Technical Specification Pages Re Unavailability of Barriers Using Consolidated Line Item Improvement Process ML0718403352007-06-29029 June 2007 License Amendment Request: Revise Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448 Using the Consolidated Line Item Improvement Process ML0516602072005-06-0707 June 2005 License Amendment Request: Eliminate Use of the Term Core Alterations in the Technical Specifications ML0516601952005-06-0707 June 2005 License Amendment Request: Technical Specification Changes to Modify Requirements Related to Positive Reactivity Additions ML0506002672005-02-24024 February 2005 Technical Specifications, Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications ML0503904972005-02-0303 February 2005 Technical Specification Pages to Calvert Cliffs, Unit 2 - Correction to Amendment No. 246 ML0503300972005-01-27027 January 2005 License Amendment Request: Change Regarding Mode Using the Consolidated Line Item Improvement Process ML0434400272004-12-0101 December 2004 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports ML0431001302004-11-0303 November 2004 Units 1 & 2; Technical Specification Bases, Revisions 15. 16, 17, 18, 19, 20. 21, and 22 ML0430001872004-10-21021 October 2004 Technical Specification Page for Corrected Amendment Nos. 268 and 244 ML0420200822004-07-15015 July 2004 Units, 1 and 2, License Amendment Request: Incorporate Methodology References for the Implementation of PHOENIX-P, Anc, Paragon, and Zirconium Diboride Into the Technical Specifications ML0416201102004-06-0707 June 2004 Units I & 2, License Amendment Request: Use of Alternate Decay Heat Removal in Mode 6 Refueling ML0416300782004-06-0303 June 2004 License Amendment, Technical Specification Pages Re Spent Fuel Pool Maximum Enrichment Limit ML0335102762003-12-12012 December 2003 License Amendment Request Regarding Elimination of Post-Accident Sampling System (PASS) Sampling Requirements ML0334504822003-12-0909 December 2003 Technical Specification for Calvert Cliff Units 1 & 2, Amendment Nos. 261 & 238 ML0331405792003-09-30030 September 2003 Letter Transmitting Calvert Cliffs, Units 1 and 2 - License Amendment Request: Increase the Unit 2 Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron and Burnup Credit ML0312803252003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachment H ML0312703002003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachments 1 Through G ML0312803342003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachment I Through F ML0312702882003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit ML0235100562002-12-13013 December 2002 License Amend Request: Removal of Charging Pumps from Emergency Core Cooling System Technical Specification ML0221302562002-07-17017 July 2002 Westinghouse Lead Fuel Assemblies - Temporary Exemption Request & License Amendment Request ML0209904332002-04-0808 April 2002 Technical Specification Pages for Amendments 251 & 228, Calvert Cliffs, Units 1 & 2 ML0209802212002-04-0404 April 2002 Technical Specification, Emergency Amendment 227 One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification ML0206406192002-03-0404 March 2002 Technical Specifications, for Amendment Nos. 250 & 256 ML0206302602002-03-0101 March 2002 Technical Specifications, Amendment Steam Generator Replacement (Tac Nos. MB0951 and MB0952) ML0204505342002-02-13013 February 2002 Technical Specifications, Amendment One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification 2024-04-12
[Table view] |
Text
George Vanderheyden 1650 Calvert Cliffs Parkway Vice President Lusby, Maryland 20657 Calvert Cliffs Nuclear Power Plant 410 495-4455 Constellation Generation Group, LLC 410 495-3500 Fax Constellation MI Energy Group December 12, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 License Amendment Request: Elimination of Post-Accident Sampling System (PASS) Sampling Requirements The Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP) hereby requests an Amendment to its Renewed Operating License Nos. DPR-53 and DPR-69 for Calvert Cliffs Unit Nos. I and 2, respectively, with the submittal of the proposed changes to the Technical Specifications.
This change proposes to revise CCNPP Improved Technical Specifications to eliminate the requirements for having and maintaining the Post-Accident Sampling System. This change is being submitted in accordance with the provisions of 10 CFR 50.90 and is consistent with Nuclear Regulatory Commission approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-366, "Elimination of Requirements for a Post Accident Sampling System (PASS)." The availability of this Technical Specification improvement was announced in the Federal Register on October 31, 2000 as part of the Consolidated Line Item Improvement Process. As part of this License Amendment Request, CCNPP is making specific regulatory commitments as described in Attachment (1).
The marked up Technical Specification pages are contained in Attachment (2) and the final typed pages are contained in Attachment (3).
This proposed change to the Technical Specifications and our determination of significant hazards have been reviewed by our Plant Operations and Safety Review Committee and Nuclear Safety Review Board, and they have concluded that implementation of these changes will not result in an undue risk to the health and safety of the public.
We request that this change be approved by October 1, 2004.
P7 (D lI
Document Control Desk December 12, 2003 Page 2 Should you have questions regarding this matter, we will be pleased to them with you.
Very STATE OF MARYLAND
- TO WIT:
COUNTY OF CALVERT I, George Vanderheyden, being duly sworn, state that I am Vice President - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on mK personal knowledge, they are based upon information provided by other CCNPP employees and/or co sultants. Such information has been reviewed in accordance with company practice and I belie iefto reliable.
Subscri e and sworn before me a Notaryjpblic i and for the State of Maryland and County of
,57, )T>< . ,this 1a day of eci - ,2003.
WITNESS mylland and Notarial Seal:
M . DNotary Publite My Commission Expires:
l ~~Date '
GV/PSF/bjd Attachments: (1) Description and Assessment (2) Marked-up Technical Specification Pages (3) Final Technical Specification Pages cc: J. Petro, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR G. S. Vissing, NRC
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT Calvert Cliffs Nuclear Power Plant, Inc.
December 12, 2003
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT DESCRIPTION The proposed license amendment deletes the program requirements of Technical Specification 5.5.3, "Post-Accident Sampling System (PASS)." The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-366 (Reference 1). The availability of this Technical Specification improvement was announced in the FederalRegister on October 31, 2000 as part of the Consolidated line Item Improvement Process (CLIIP) (Reference 2).
ASSESSMENT Applicability of Published Safety Evaluation Calvert Cliffs Nuclear Power Plant (CCNPP) has reviewed the safety evaluation published on October 31, 2000 as part of the CLIIP. This included a review of the NRC staffs' evaluation as well as the supporting information provided to support TSTF-366 (i.e., CE NPSD-1 157-A, Technical Justification for the Elimination of the Post-Accident Sampling System from the Plant Design and Licensing Bases for CEOG Utilities, July 2000). Calvert Cliffs Nuclear Power Plant has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to CCNPP, and justify this amendment for the incorporation of the changes to the CCNPP Improved Technical Specifications. Any changes to the emergency plan needed to implement this amendment will be evaluated under 10 CFR 50.54(q) to determine if the change decreases the effectiveness of the site-specific plan.
Optional Changes and Variations Calvert Cliffs Nuclear Power Plant is not proposing any variations or deviations from the Technical Specification changes described in TSTF-366 or the NRC staff's model safety evaluation published on October 31, 2000.
Requirements for installing and maintaining PASS were included in a confirmatory order for Calvert Cliffs issued on July 10, 1981. This amendment request includes superseding the requirements imposed' by that confirmatory order.
REGULATORY ANALYSIS No Significant Hazards Determination Calvert Cliffs Nuclear Power Plant has reviewed the proposed no significant hazards consideration determination published as part of the CLIIP. Calvert Cliffs Nuclear Power Plant has concluded that the proposed determination presented in the notice is applicable to CCNPP and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
Verification and Commitments As discussed in the notice of availability published inFederalRegister for this Technical Specification improvement, plant-specific commitments are as follows:
- 1. Calvert Cliffs Nuclear Power Plant will maintain contingency plans for obtaining and analyzing highly radioactive samples of reactor coolant, containment sump, and containment atmosphere.
The contingency plans are contained in plant procedures. Maintaining the contingency plans is considered a regulatory commitment.
1
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT
- 2. The capability for classifying fuel damage events at the Alert level threshold has been established for CCNPP. This capability is described in plant procedures. The capability for classifying fuel damage events is considered a regulatory commitment.
3 Calvert Cliffs Nuclear Power Plant has established the capability to monitor radioactive iodines that have been released to offsite environs. This capability is described in plant procedures. The capability to monitor radioactive iodines that have been released to offsite environs is considered a regulatory commitment.
ENVIRONMENTAL EVALUATION Calvert Cliffs Nuclear Power Plant has reviewed the environmental evaluation included in the model safety evaluation published as part of the CLIIP. Calvert Cliffs Nuclear Power Plant has concluded that the staffs findings presented in that evaluation are applicable to CCNPP and the evaluation is hereby incorporated by reference for this application.
REFERENCES
- 1. Industry/TSTF Standard Technical Specification Change Traveler TSTF-366, "Elimination of Requirements for a POST Accident Sampling System (PASS)"
- 2. Federal Register, Vol. 65, No. 211, "Notice of Availability for Referencing In License Amendment Applications Model Safety Evaluation on Technical Specification Improvement to Eliminate Requirements on Post Accident Sampling Systems Using the Consolidated Line Item Improvement Process," dated October 31, 2000 2
ATTACHMENT (2)
MARKED-UP TECHNICAL SPECIFICATION PAGES Calvert Cliffs Nuclear Power Plant, Inc.
December 12,2003
Programs and Manuals 5.5 5.5 Programs and Manuals Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e.,
month and year) the change was implemented.
5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include Containment Spray, Safety Injection, and Chemical and Volume Control. The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; and
- b. Integrated leak test requirements for each system at least once per 24 months. The provisions of SR 3.0.2 are applicable.
5.5.3 etcc- et aIi particulatcz inh 11L ~Guteffluen nd-eentaime-t-ati phe- lla b cm-arn-fof-lsaini- a f
- o. pr
- e. Pei ajt tae4-smp4fng-and-a mryi-s-5 CALVERT CLIFFS - UNIT 1 5.5-2 Amendment No. 259 CALVERT CLIFFS - UNIT 2 Amendment No. 236
ATTACHMENT (3)
FINAL TECHNICAL SPECIFICATION PAGES Calvert Cliffs Nuclear Power Plant, Inc.
December 12, 2003
TABLE OF CONTENTS 3.8.8 Inverters-Shutdown ................................ 3.8.8-1 3.8.9 Distribution Systems-Operating ...... .............. 3.8.9-1 3.8.10 Distribution Systems-Shutdown ....... .............. 3.8.10-1 3.9 REFUELING OPERATIONS................................... 3.9.1-1 3.9.1 Boron Concentration . . ............ 3.9.1-1 3.9.2 Nuclear Instrumentation . . .... ............. . 3.9.2-1 3.9.3 Containment Penetrations . . ...... 3.9.3-1 3.9.4 Shutdown Cooling (SDC) and Coolant Circulation-High Water Level ... ...... 3.9.4-1 3.9.5 Shutdown Cooling (SDC) and Coolant Circulation-Low Water Level . ............................... 3.9.5-1 3.9.6 Refueling Pool Water Level . . ........... 3.9.6-1 4.0 DESIGN FEATURES . . .......................................... 4.0-1 4.1 Site Location . . ........................................ 4.0-1 4.2 Reactor Core . . ......................................... 4.0-1 4.3 Fuel Storage . . ......................................... 4.0-2 5.0 ADMINISTRATIVE CONTROLS ..................... 5.1-1 5.1 Responsibility ... ..................................... . 5.1-1 5.2 Organization ... ........................................ 5.2-1 5.2.1 Onsite and Offsite Organizations . ................. 5.2-1 5.2.2 Unit Staff . ........................................ 5.2-2 5.3 Unit Staff Qualifications .................. 5.3-1 5.4 Procedures ............................................. 5.4-1 5.5 Programs and Manuals ................ 5.5-1 5.5.1 Offsite Dose Calculation Manual . ............. 5.5-1 5.5.2 Primary Coolant Sources Outside Containment ....... 5.5-2 5.5.3 Not Used ..... . . 5.5-2 5.5.4 Radioactive Effluent Controls Program . ......... 5.5-2 5.5.5 Component Cyclic or Transient Limit . ........... 5.5-5 5.5.6 Concrete Containment Tendon Surveillance Program... 5.5-6 5.5.7 Reactor Coolant Pump Flywheel Inspection Program... 5.5-6 5.5.8 Inservice Testing Program . ................. 5.5-6 5.5.9 Steam Generator Tube Surveillance Program . ....... 5.5-7 5.5.10 Secondary Water Chemistry Program .................. 5.5-17 5.5.11 Ventilation Filter Testing Program . ............. 5.5-17 5.5.12 Explosive Gas and Storage Tank Radioactivity Monitoring Program .... ......................... 5.5-20 5.5.13 Diesel Fuel Oil Testing Program . ............. 5.5-21 5.5.14 Technical Specifications Bases Control Program ..... 5.5-21 CALVERT CLIFFS - UNIT 1 iv Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.
Programs and Manuals 5.5 5.5 Programs and Manuals Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e.,
month and year) the change was implemented.
5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include Containment Spray, Safety Injection, and Chemical and Volume Control. The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; and
- b. Integrated leak test requirements for each system at least once per 24 months. The provisions of SR 3.0.2 are applicable.
5.5.3 Not Used 5.5.4 Radioactive Effluent Controls Program This program conforms to 10 CFR 50.36a for the control of radioactive effluents and for maintaining the doses to members of the public from radioactive effluents as low as reasonably achievable. The program shall be contained in the ODCM, shall be implemented by procedures, and shall include remedial actions to CALVERT CLIFFS - UNIT 1 5.5-2 Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.
Programs and Manuals 5.5 5.5 Programs and Manuals be taken whenever the program limits are exceeded. The program shall include the following elements:
- a. Limitations on the functional capability of radioactive liquid and gaseous monitoring instrumentation, including surveillance tests and setpoint determination, in accordance with the methodology in the ODCM;
- b. Limitations on the concentrations of radioactive material released in liquid effluents to unrestricted areas, conforming to 10 CFR Part 20, Appendix B, Table II, Column 2;
- c. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluents in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM;
- d. Limitations on the annual and quarterly doses or dose commitment to a member of the public from radioactive materials in liquid effluents released from each unit to unrestricted areas to be limited:
- 1. During any calendar quarter: Less than or equal to 3 mrems to the total body, and to less than or equal to 10 mrems to any organ; and
- 2. During any calendar year: Less than or equal to 6 mrems to the total body, and to less than or equal to 20 mrems to any organ;
- e. Determination of cumulative dose contributions from radioactive effluents for the current calendar quarter and current calendar year, in accordance with the methodology and parameters in the ODCM, at least every 31 days.
Determination of projected dose contributions from radioactive effluents in accordance with the methodology in the ODCM at least every 31 days;
- f. Limitations on the functional capability and use of the Liquid Radwaste Treatment System to ensure that appropriate portions of this system are used to reduce releases of CALVERT CLIFFS - UNIT 1 5.5-3 Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.
Programs and Manuals 5.5 5.5 Programs and Manuals radioactivity when the projected doses to unrestricted areas exceeds 0.36 mrem to the total body, or 1.20 mrem to any organ in a 92-day period;
- g. Limitations on the functional capability and use of the Gaseous Radwaste Treatment System and the Ventilation Exhaust Treatment System to ensure that appropriate portions of these systems are used to reduce releases of radioactivity when the calculated doses to unrestricted areas exceeds 1.20 mrad for gamma radiation, and 2.40 mrad for beta radiation in a 92-day period;
- h. Limitations on the functional capability and use of the Ventilation Exhaust Treatment System to ensure that appropriate portions of this system are used to reduce releases of radioactivity when the calculated doses due to gaseous releases to unrestricted areas exceeds 1.8 mrem to any organ in a 92-day period;
- i. Limitations on the dose rate resulting from radioactive material released in gaseous effluents from the site to areas at or beyond the site boundary, to be limited:
- 1. For noble gases: Less than or equal to 500 mrems/yr to the total body, and less than or equal to 3000 mrems/yr to the skin; and
- 2. For Iodine-131 and for all radionuclides in particulate form with half lives greater than 8 days: Less than or equal to 1500 mrems/yr to any organ;
- j. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents to areas beyond the site boundary, to be limited to:
- 1. During any calendar quarter: Less than or equal to 10 mrads for gamma radiation, and less than or equal to 20 mrads for beta radiation; and CALVERT CLIFFS - UNIT 1 5.5-4 Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.
Programs and Manuals 5.5 5.5 Programs and Manuals
- 2. During any calendar year: Less than or equal to 20 mrads for gamma radiation, and less than or equal to 40 mrads for beta radiation;
- k. Limitations on the annual and quarterly doses to a member of the public from Iodine-131 and all radionuclides in particulate form with half-lives greater than 8 days, in gaseous effluents released from each unit to areas beyond the site boundary, to be limited:
- 1. During any calendar quarter: Less than or equal to 15 mrems to any organ:
- 2. During any calendar year: Less than or equal to 30 mrems to any organ; and
- 3. Less than 0.1% of the limits of 5.5.4.k(1) and (2)as a result of burning-contaminated oil; and
- 1. Limitations on the annual dose or dose commitment to any member of the public, beyond the site boundary, due to releases of radioactivity, and to radiation from uranium fuel cycle sources to be limited to less than or equal to 25 mrems to the total body or any organ, except the thyroid, which shall be limited to less than or equal to 75 mrems.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the UFSAR, Section 4.1 cyclic and transient occurrences to ensure that components are maintained within the design limits.
CALVERT CLIFFS - UNIT 1 5.5-5 Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.
t Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Concrete Containment Tendon Surveillance Program This program provides controls for monitoring any tendon degradation in pre-stressed concrete containments, including effectiveness of its corrosion protection medium, to ensure containment structural integrity. The program shall include baseline measurements prior to initial operation. The Tendon Surveillance Program, inspection frequencies, and acceptance criteria shall be in accordance with Section XI, Subsection IWL of the ASME Boiler and Pressure Vessel Code and applicable addenda as required by 10 CFR 50.55a, as amended by relief granted in accordance with 10 CFR 50.55a(a)(3).
The provisions of SR 3.0.3 are applicable to the Tendon Surveillance Program inspection frequencies.
5.5.7 Reactor Coolant PumD Flywheel InsDection Prooram This program shall provide for the inspection of each reactor coolant pump flywheel per the recommendations of regulatory position c.4.b of Regulatory Guide 1.14, Revision 1, August 1975.
5.5.8 Inservice Testinq Prooram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
CALVERT CLIFFS - UNIT 1 5.5-6 Amendment No.
CALVERT CLIFFS - UNIT 2 Amendment No.