Line 2: |
Line 2: |
| | number = ML13358A372 | | | number = ML13358A372 |
| | issue date = 12/20/2013 | | | issue date = 12/20/2013 |
| | title = Monticello - Maximum Extended Load Line Limit Analysis Plus: Cycle 27 Safety Reload Licensing Report and Request for Additional Information Response | | | title = Maximum Extended Load Line Limit Analysis Plus: Cycle 27 Safety Reload Licensing Report and Request for Additional Information Response |
| | author name = Fili K D | | | author name = Fili K D |
| | author affiliation = Northern States Power Co, Xcel Energy | | | author affiliation = Northern States Power Co, Xcel Energy |
Letter Sequence Request |
---|
TAC:ME3145, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 L-MT-24-012, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24106A1102024-04-24024 April 2024 Mille Lacs Band of Ojibwe -Monticello Sec106 Tribal ML24115A2792024-04-24024 April 2024 Sec106 Tribal, Blaker, Doreen-Keweenaw Bay Indian Community 2024-08-05
[Table view] |
Text
@XcelEnergy Monticello Nuclear Generating Plant 2807 W County Rd 75 Monticello, MN 55362 December 20, 2013 L-MT-1 3-126 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22
Subject:
Maximum Extended Load Line Limit Analysis Plus: Cycle 27 Safety Reload Licensing Report and Request for Additional Information Response (TAC ME3145)
References:
1)Letter from T J O'Connor (NSPM), to Document Control Desk (NRC),"License Amendment Request: Maximum Extended Load Line Limit Analysis Plus," L-MT-10-003, dated January 21, 2010. (ADAMS Accession No. ML1100280558)
- 2) NEDC-33006P-A, Revision 3, "Licensing Topical Report, General Electric Boiling Water Reactor, Maximum Extended Load Line Limit Analysis Plus," dated June 2009. (ADAMS Accession No.ML091800512)
- 3) Email from T. Beltz (NRC) to J. Fields (NSPM), "Monticello Nuclear Generating Plant -Draft Request for Additional Information re: Maximum Extended Load Line Limit Analysis Plus LAR Review (TAC No. ME3145)," dated November 26, 2013.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
domain.
Document Control Desk Page 2 The purpose of this letter is to provide the NRC with the MNGP cycle 27 Supplemental Reload Licensing Report (SRLR) applicable to MELLLA+ conditions and evaluations and to provide a response to an NRC Request for Additional Information (RAI).Enclosure 1 to this letter provides the MNGP cycle 27 SRLR applicable to MELLLA+conditions and evaluations.
The cycle 27 SRLR is being submitted to the NRC to fulfill the requirements of the MELLLA+ topical report (Reference 2), Limitation and Condition 12.4, which specifies that the SRLR for the initial MELLLA+ implementation cycle shall be submitted for NRC staff confirmation.
The SRLR supports the licensing work performed for the MNGP MELLLA+ license.This reload design was initiated prior to the PRIME transition commitment to utilize PRIME for reload analyses.
The cycle-specific reload analyses are based on GESTR-M, with one exception, and the peak clad temperature (PCT) impact of PRIME was evaluated as part of 10 CFR 50.46 Error Notification 2012-01. The one exception is the Detect and Suppress Solution -Confirmation Density (DSS-CD) Backup Stability Protection (BSP) analysis, which was performed using PRIME. The use of PRIME for the DSS-CD BSP analysis is consistent with NEDO-33173 Supplement 4-A, Rev. 1,"Implementation of PRIME Models and Data in Downstream Methods," November 2012.Enclosure 2 provides a report from General Electric -Hitachi (GEH) letter, GE-MNGP-AEP-3306, "GEH Response to MELLLA+ EICB RAI," which provides a response to the NRC's RAI (Reference 3). Enclosure 2 contains proprietary information.
Enclosure 3 provides a non-proprietary copy of the Enclosure 2 RAI response.
The non-proprietary copy of the RAI response is being provided based on the NRC's expectation that the submitter of the proprietary information should provide, if possible, a non-proprietary version of the document with brackets showing where the proprietary information has been deleted.Enclosure 4 provides an affidavit executed to support withholding Enclosure 2 from public disclosure.
Information in Enclosure 2 contains proprietary information as defined by 10 CFR 2.390. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in 10 CFR 2.390(b)(4).
Accordingly, NSPM respectfully requests that the proprietary information in Enclosure 2 be withheld from public disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of GEH information or the supporting GEH affidavit in Enclosure 4 should be addressed to Linda C. Dolan, Manager, Regulatory Compliance, GE-Hitachi Nuclear Energy Americas LLC, 3901 Castle Hayne Road, Wilmington, NC 28401.
Document Control Desk Page 3 The supplemental information provided herein does not change the conclusions of the No Significant Hazards Consideration and the Environmental Consideration evaluations provided in Reference 1 for the MELLLA+ license amendment request.In accordance-with 10 CFR 50.91 (b), a copy of this application supplement, without enclosures is being provided to the designated Minnesota Official.Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.Executed on: Decemberq, 2013 Karen D. Fili Site Vice-President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Enclosures (4)cc: Regional Administrator, Region III, USNRC (w/o enclosures)
Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC (w/o enclosures)
Minnesota Department of Commerce (w/o enclosures)