ML062430597: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITE D STA TES  NUCL EA R RE GULA TORY C OMMIS SI ON    REGION I 475 AL LENDAL E ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-141 5 August 31, 2006 Mr. James H.
Lash Site Vice President FirstEnergy N uclear Operatin g Company Beaver Va lley P ower Stati on Post Of fice Bo x 4 Shippingport, P ennsylv ania 15077 SUB JEC T: MID-CYCLE PERFORMANCE REVIEW AND INSPECTI ON PLAN - BEAVER VALLEY POW ER STATION UNITS 1 AND 2 Dear Mr. La sh: On August 9, 2006, the NRC staff complete d its performance rev iew of Bea ver Vall ey Pow er Station Uni ts 1 and 2 (B eaver Val ley) for the first h alf of the calenda r year 2006 assessment cycle. Our technical s taff reviewed p erformance indicato rs (PIs) for the most rece nt quarter and i nspect ion re sults over the pre viou s twe lve months. The pu rpose of this letter is to inform you o f our ass essmen t of yo ur safety performa nce du ring th is pe riod a nd our plan s for futur e inspect ions at your facilit y.This performance rev iew and enclosed i nspection pl an do not i nclude phy sical protec tion information. A separat e letter designated and mar ked as "Exempt from Public Disclosure in accordance w ith 10 CFR 2.390" wi ll incl ude the phy sical protec tion revi ew and re sultant inspe ction plan. Plant performance for the most recent quarter at Beaver Va lley U nits 1 and 2 was w ithin the Licensee R esponse col umn of the NRC' s Action M atrix, based on all i nspection findi ngs being class ified as hav ing v ery l ow sa fety si gnifica nce (Gre en) an d all PIs i ndica ting pe rformance at a level re quiring no addi tional NR C oversight (Gree n). Therefore, we p lan to condu ct the standa rd reac tor ov ersight proce ss (ROP) base line insp ectio ns at y our faci lity. In ad ditio n to the ba seli ne in specti on pro cedure s, ins pecti ons re lated to the Exte nded P ower Uprate for Uni ts 1 and 2 and inspection s related to th e Unit 2 C ontainment Sump Modificati ons wil l be performed.
The enclosed inspection plan detai ls the insp ections, les s those relate d to physi cal protectio n, scheduled th rough March 3 1, 2008. The i nspection pl an is prov ided to al low for the re solution of any schedu ling conflicts and personnel availa bility issues w ell in a dvance of in spector arriv al onsit e. Rou tine r eside nt ins pecti ons ar e not l isted due to their ongoi ng and conti nuous nature. The inspection s in the l ast nine months of the inspecti on plan are tentative and may be revised at th e end-of-cycle revie w.In accordance w ith 10 CFR 2.390 of the NR C's "Rules and Practice s," a copy o f this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or fr om the Publicly Available Records (PARS) component of NRC's J. H. Lash 2 document syste m (ADAMS).
ADAMS is accessi ble from the NRC Website at http://w ww.nrc.gov/readi ng-rm/ada ms.html (The Pu blic Elec tronic Readi ng Room).If circu mstance s aris e wh ich ca use us to cha nge the insp ectio n pla n, we wil l con tact y ou to discuss the c hange as soon as possibl
: e. Please contact me at 610
-337-5200 w ith any questio ns yo u may have regardi ng this lette r or the insp ectio n pla n. Sincere ly,/R A/Ronald R.
Bellamy, Chief Reactor Projects Branch 7 Divi sion of Reac tor Pro jects Docket Nos. 50-3 34, 50-412 License No
: s. DPR-66, N PF-73
 
==Enclosure:==
B eaver Val ley Pow er Station, Un its 1 and 2 Inspection/ A ctivity Plan cc w/encl:
G. Leidich, P resident and Chief Nuclea r Officer J. Hagan, Senio r Vice Presi dent of Operations and Chief Operati ng Officer D. Pace, Seni or Vice Pres ident, Flee t Engineering J. Rinckel, Vi ce President, Fleet Oversi ght L. My ers, Ex ecuti ve Vi ce Pre siden t, Spec ial P rojects R. Anderson, V ice Presid ent, FirstEnergy Nuclear Opera ting Company Manager, Fle et Licensin g, FirstEnergy Nu clear Operating C ompany R. Mende, Director, Site Operations T. Cosgrove, Dire ctor, Main tenance P. Sena, Di rector, Engineeri ng L. Freeland, Director, Site Performance Improveme nt and Ma nager, Regulatory Compliance D. Jen kins, A ttorney , FENOC B. Sepelak, Su pervisor, N uclear Compl iance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department , Public Utilities Commission, State of Oh io D. Hill, Chief, Radiological Health Program , State of W est Virginia J. Lewis, Commissioner, Division of Labor, State of W est Virginia W. Hill, B eaver Coun ty Emergency Management Agenc y J. Johnsrud, Na tional Ene rgy Committee, Si erra Club J. H. Lash 3 Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sos a, RI OE DO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo -
Senior Resi dent Inspector P. Garre tt - Res ident OA DRS Directo r, Region I DRS Deputy Director, Regi on I DRS Branch Chiefs (6)
Region I Docket R oom (with c oncurrences)
RidsNrrDip mIipb@nrc.gov Instit ute of N uclea r Pow er Oper ation s (INP O)SISP R eview Co mplete: _______RRB
____ (Reviewer's Initials)
D O C U M EN T NA M E:  S:\R O P 7 M id C ycle Re vie w\2 00 6 R O P7 M id-C ycle Le tter s\B V 2 00 6 M id-C ycle Lett er.wpd After de clari ng this docume nt "An Official Agency Recor d" it will be released to the Publ ic.To re ceive a cop y of thi s docu ment, i ndicat e in t he box:  " C" = Copy w ithout attachment/enclo sure  " E" = Copy w ith attachment/enclosur e  " N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/2006 8/29/2006 OFFICIAL RECORD COPY Beaver Valley Inspection / Activity Plan 07/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:31:36 Report 22 4 7111111B-L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT Baseline Inspections 07/31/2006 08/03/2006 1, 2  7111111B IP Licensed Operator Requalification Program 8 7111121-CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 07/10/2006 07/14/2006 1, 2  7111121 IP Component Design Bases Inspection Baseline Inspections 07/17/2006 07/20/2006 1, 2  7111121 IP Component Design Bases Inspection 2 7111112B-MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 1, 2  7111112B IP Maintenance Effectiveness 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/02/2006 10/06/2006 1, 2  7112102 IP ALARA Planning and Controls 1 7111108P-UNIT 2 INSERVICE INSPECTION Baseline Inspections 10/10/2006 10/20/2006 2  7111108P IP Inservice Inspection Activities - PWR 1 TI-166-UNIT 2 CONTAINMENT SUMP MODIFICATIONS Safety Issues 10/23/2006 10/27/2006 2  2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
2 TI-169-MSPI VERIFICATION Safety Issues 11/01/2006 12/15/2006 1, 2  2515/169 IP Mitigating Systems Performance Index Verification 1 71004-POWER UPRATE - EC/FAC Other Routine 12/04/2006 12/08/2006 1, 2  71004 IP Power Uprate 1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 12/11/2006 12/15/2006 1, 2  7112102 IP ALARA Planning and Controls 6 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1    7111105T IP Fire Protection [Triennial]
Baseline Inspections 02/05/2007 02/09/2007 1    7111105T IP Fire Protection [Triennial]
1 71114-EP PRGM INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2  7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2  7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2  7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2  7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2  71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/05/2007 02/09/2007 1, 2  71151-EP02 IP ERO Drill Participation Baseline Inspections 02/05/2007 02/09/2007 1, 2  71151-EP03 IP Alert & Notification System 1 7112101-OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1, 2  7112101 IP Access Control to Radiologically Significant Areas 4 71152B-PI&R Baseline Inspections 03/26/2007 03/30/2007 1, 2  71152B IP Identification and Resolution of Problems Baseline Inspections 04/09/2007 04/13/2007 1, 2  71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Beaver Valley Inspection / Activity Plan 07/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:31:36 Report 22 3 7111111B-LO REQUAL. PROG.(FOCUS U2)+P/F RVW Baseline Inspections 05/28/2007 07/06/2007 1, 2  7111111B IP Licensed Operator Requalification Program 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 05/14/2007 05/18/2007 1, 2  7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4 7111117B-MODS AND 50.59 Baseline Inspections 06/04/2007 06/08/2007 1, 2  7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/04/2007 06/08/2007 1, 2  7111117B IP Permanent Plant Modifications 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 07/09/2007 07/13/2007 1, 2  7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3 11/12EXM-U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 10/15/2007 10/19/2007 1    U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM Not Applicable 11/12/2007 11/23/2007 1    U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 1 TI-166-CONTAINMENT SUMP MODIFICATIONS - UNIT 1 Safety Issues 10/15/2007 10/19/2007 1    2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/29/2007 11/02/2007 1, 2  7112102 IP ALARA Planning and Controls 2 7111107-HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1, 2  7111107B IP Heat Sink Performance 6 7111121-CDBI Baseline Inspections 01/14/2008 01/18/2008 1, 2  7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2  7111121 IP Component Design Bases Inspection Baseline Inspections 02/04/2008 02/08/2008 1, 2  7111121 IP Component Design Bases Inspection 1 7112101-OCC RAD SAFETY - ACCESS Baseline Inspections 02/25/2008 02/29/2008 1, 2  7112101 IP Access Control to Radiologically Significant Areas 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 03/24/2008 03/28/2008 1, 2  7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Revision as of 10:04, 11 November 2018

Mid-cycle Performance Review and Inspection Plan - Beaver Valley Power Station Units 1 and 2
ML062430597
Person / Time
Site: Beaver Valley
Issue date: 08/31/2006
From: Bellamy R R
NRC/RGN-I/DRP/PB7
To: Lash J H
FirstEnergy Nuclear Operating Co
References
Download: ML062430597 (5)


Text

UNITE D STA TES NUCL EA R RE GULA TORY C OMMIS SI ON REGION I 475 AL LENDAL E ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-141 5 August 31, 2006 Mr. James H.

Lash Site Vice President FirstEnergy N uclear Operatin g Company Beaver Va lley P ower Stati on Post Of fice Bo x 4 Shippingport, P ennsylv ania 15077 SUB JEC T: MID-CYCLE PERFORMANCE REVIEW AND INSPECTI ON PLAN - BEAVER VALLEY POW ER STATION UNITS 1 AND 2 Dear Mr. La sh: On August 9, 2006, the NRC staff complete d its performance rev iew of Bea ver Vall ey Pow er Station Uni ts 1 and 2 (B eaver Val ley) for the first h alf of the calenda r year 2006 assessment cycle. Our technical s taff reviewed p erformance indicato rs (PIs) for the most rece nt quarter and i nspect ion re sults over the pre viou s twe lve months. The pu rpose of this letter is to inform you o f our ass essmen t of yo ur safety performa nce du ring th is pe riod a nd our plan s for futur e inspect ions at your facilit y.This performance rev iew and enclosed i nspection pl an do not i nclude phy sical protec tion information. A separat e letter designated and mar ked as "Exempt from Public Disclosure in accordance w ith 10 CFR 2.390" wi ll incl ude the phy sical protec tion revi ew and re sultant inspe ction plan. Plant performance for the most recent quarter at Beaver Va lley U nits 1 and 2 was w ithin the Licensee R esponse col umn of the NRC' s Action M atrix, based on all i nspection findi ngs being class ified as hav ing v ery l ow sa fety si gnifica nce (Gre en) an d all PIs i ndica ting pe rformance at a level re quiring no addi tional NR C oversight (Gree n). Therefore, we p lan to condu ct the standa rd reac tor ov ersight proce ss (ROP) base line insp ectio ns at y our faci lity. In ad ditio n to the ba seli ne in specti on pro cedure s, ins pecti ons re lated to the Exte nded P ower Uprate for Uni ts 1 and 2 and inspection s related to th e Unit 2 C ontainment Sump Modificati ons wil l be performed.

The enclosed inspection plan detai ls the insp ections, les s those relate d to physi cal protectio n, scheduled th rough March 3 1, 2008. The i nspection pl an is prov ided to al low for the re solution of any schedu ling conflicts and personnel availa bility issues w ell in a dvance of in spector arriv al onsit e. Rou tine r eside nt ins pecti ons ar e not l isted due to their ongoi ng and conti nuous nature. The inspection s in the l ast nine months of the inspecti on plan are tentative and may be revised at th e end-of-cycle revie w.In accordance w ith 10 CFR 2.390 of the NR C's "Rules and Practice s," a copy o f this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or fr om the Publicly Available Records (PARS) component of NRC's J. H. Lash 2 document syste m (ADAMS).

ADAMS is accessi ble from the NRC Website at http://w ww.nrc.gov/readi ng-rm/ada ms.html (The Pu blic Elec tronic Readi ng Room).If circu mstance s aris e wh ich ca use us to cha nge the insp ectio n pla n, we wil l con tact y ou to discuss the c hange as soon as possibl

e. Please contact me at 610

-337-5200 w ith any questio ns yo u may have regardi ng this lette r or the insp ectio n pla n. Sincere ly,/R A/Ronald R.

Bellamy, Chief Reactor Projects Branch 7 Divi sion of Reac tor Pro jects Docket Nos. 50-3 34, 50-412 License No

s. DPR-66, N PF-73

Enclosure:

B eaver Val ley Pow er Station, Un its 1 and 2 Inspection/ A ctivity Plan cc w/encl:

G. Leidich, P resident and Chief Nuclea r Officer J. Hagan, Senio r Vice Presi dent of Operations and Chief Operati ng Officer D. Pace, Seni or Vice Pres ident, Flee t Engineering J. Rinckel, Vi ce President, Fleet Oversi ght L. My ers, Ex ecuti ve Vi ce Pre siden t, Spec ial P rojects R. Anderson, V ice Presid ent, FirstEnergy Nuclear Opera ting Company Manager, Fle et Licensin g, FirstEnergy Nu clear Operating C ompany R. Mende, Director, Site Operations T. Cosgrove, Dire ctor, Main tenance P. Sena, Di rector, Engineeri ng L. Freeland, Director, Site Performance Improveme nt and Ma nager, Regulatory Compliance D. Jen kins, A ttorney , FENOC B. Sepelak, Su pervisor, N uclear Compl iance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department , Public Utilities Commission, State of Oh io D. Hill, Chief, Radiological Health Program , State of W est Virginia J. Lewis, Commissioner, Division of Labor, State of W est Virginia W. Hill, B eaver Coun ty Emergency Management Agenc y J. Johnsrud, Na tional Ene rgy Committee, Si erra Club J. H. Lash 3 Distribution w/encl:

S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sos a, RI OE DO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo -

Senior Resi dent Inspector P. Garre tt - Res ident OA DRS Directo r, Region I DRS Deputy Director, Regi on I DRS Branch Chiefs (6)

Region I Docket R oom (with c oncurrences)

RidsNrrDip mIipb@nrc.gov Instit ute of N uclea r Pow er Oper ation s (INP O)SISP R eview Co mplete: _______RRB

____ (Reviewer's Initials)

D O C U M EN T NA M E: S:\R O P 7 M id C ycle Re vie w\2 00 6 R O P7 M id-C ycle Le tter s\B V 2 00 6 M id-C ycle Lett er.wpd After de clari ng this docume nt "An Official Agency Recor d" it will be released to the Publ ic.To re ceive a cop y of thi s docu ment, i ndicat e in t he box: " C" = Copy w ithout attachment/enclo sure " E" = Copy w ith attachment/enclosur e " N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/2006 8/29/2006 OFFICIAL RECORD COPY Beaver Valley Inspection / Activity Plan 07/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:31:36 Report 22 4 7111111B-L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT Baseline Inspections 07/31/2006 08/03/2006 1, 2 7111111B IP Licensed Operator Requalification Program 8 7111121-CDBI (COMPONENT DESIGN BASES INSPECTION)

Baseline Inspections 07/10/2006 07/14/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/17/2006 07/20/2006 1, 2 7111121 IP Component Design Bases Inspection 2 7111112B-MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111112B IP Maintenance Effectiveness 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP ALARA Planning and Controls 1 7111108P-UNIT 2 INSERVICE INSPECTION Baseline Inspections 10/10/2006 10/20/2006 2 7111108P IP Inservice Inspection Activities - PWR 1 TI-166-UNIT 2 CONTAINMENT SUMP MODIFICATIONS Safety Issues 10/23/2006 10/27/2006 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

2 TI-169-MSPI VERIFICATION Safety Issues 11/01/2006 12/15/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1 71004-POWER UPRATE - EC/FAC Other Routine 12/04/2006 12/08/2006 1, 2 71004 IP Power Uprate 1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 12/11/2006 12/15/2006 1, 2 7112102 IP ALARA Planning and Controls 6 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1 7111105T IP Fire Protection [Triennial]

Baseline Inspections 02/05/2007 02/09/2007 1 7111105T IP Fire Protection [Triennial]

1 71114-EP PRGM INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP03 IP Alert & Notification System 1 7112101-OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4 71152B-PI&R Baseline Inspections 03/26/2007 03/30/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 04/09/2007 04/13/2007 1, 2 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Beaver Valley Inspection / Activity Plan 07/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:31:36 Report 22 3 7111111B-LO REQUAL. PROG.(FOCUS U2)+P/F RVW Baseline Inspections 05/28/2007 07/06/2007 1, 2 7111111B IP Licensed Operator Requalification Program 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 05/14/2007 05/18/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4 7111117B-MODS AND 50.59 Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111117B IP Permanent Plant Modifications 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 07/09/2007 07/13/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3 11/12EXM-U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 10/15/2007 10/19/2007 1 U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM Not Applicable 11/12/2007 11/23/2007 1 U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 1 TI-166-CONTAINMENT SUMP MODIFICATIONS - UNIT 1 Safety Issues 10/15/2007 10/19/2007 1 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/29/2007 11/02/2007 1, 2 7112102 IP ALARA Planning and Controls 2 7111107-HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111107B IP Heat Sink Performance 6 7111121-CDBI Baseline Inspections 01/14/2008 01/18/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111121 IP Component Design Bases Inspection 1 7112101-OCC RAD SAFETY - ACCESS Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.