Line 142: Line 142:
For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.
For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.


The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three (3) Emergency Preparedness PIs, i.e., DEP, ERO, and ANS, on an annual basis.
The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three
: (3) Emergency Preparedness PIs, i.e., DEP, ERO, and ANS, on an annual basis.


====b. Findings====
====b. Findings====

Revision as of 05:40, 19 September 2018

IR 05000395-10-502 on 04/19/2010-07/14/2010 for Virgil C. Summer Nuclear Station, Unit 1, NRC Emergency Preparedness Inspection Report
ML102520297
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/27/2010
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Gatlin T D
South Carolina Electric & Gas Co
Shared Package
ML102520295 List:
References
IR-10-502
Download: ML102520297 (12)


Text

August 27, 2010

Mr. Thomas Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000395/2010502

Dear Mr. Gatlin:

On July 14, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Virgil C. Summer Nuclear Station, Unit 1. The enclosed inspection report documents the inspection results, which were discussed on July 14, 2010, with Mr. Zarandi and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-395 License No.: NPF-12

Enclosure:

Inspection Report 05000395/2010-502

w/Attachment:

Supplemental Information

cc w/encl.: (See page 2)

_________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRS RII:DRP RII:DRS SIGNATURE Non concur JLB /RA/ JSD /RA/ BRB /RA/ GJM /RA/ KMK /RA/ NAME LMiller JBeavers JDodson BBonser GMcCoy KKennedy DATE 08/10/2010 08/27/2010 08/10/2010 08/27/2010 E-MAIL COPY? YES N YES NO YES N O YES N O YES N YES NO YES NO SCE&G 2 cc w/encl: J. B. Archie Senior Vice President Nuclear Operations South Carolina Electric & Gas Company Electronic Mail Distribution Kathryn M. Sutton, Esq. Morgan, Lewis & Bockius LLP Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt. S.C. Department of Health and Environmental Control Electronic Mail Distribution Andy T. Barbee Director Nuclear Training South Carolina Electric & Gas Company Electronic Mail Distribution Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830) South Carolina Electric & Gas Company Electronic Mail Distribution

Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution David A. Lavigne General Manager Operational Readiness South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065 R. J. White Nuclear Coordinator S.C. Public Service Authority Mail Code 802 Electronic Mail Distribution

Robin R. Haselden General Manager Organizational Development & Effectiveness South Carolina Electric & Gas Company Electronic Mail Distribution George A. Lippard, III General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Electronic Mail Distribution Robert L. Justice Manager Nuclear Operations South Carolina Electric & Gas Company Electronic Mail Distribution

SCE&G 3 Letter to Thomas from Brian Bonser dated August 27, 2010

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000395/2010502 Distribution w/encl

C. Evans, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource

Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.: 50-395

License Nos.: NPF-12

Report No.: 05000395/2010502

Licensee: South Carolina Electric & Gas Company

Facility: Virgil C. Summer Nuclear Station, Unit 1

Location: Jenkinsville, SC

Dates: April 19, 2010 through July 14, 2010

Inspectors: L. Miller, Senior Emergency Preparedness Inspector J. Dodson, Senior Project Engineer J. Beavers, Emergency Preparedness Inspector Approved by: Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000395/2010-502; 04/19/2010 - 07/14/2010; Virgil C. Summer Nuclear Station, Unit 1;

Emergency Preparedness Baseline Inspection.

The report covered an announced inspection by two emergency preparedness inspectors and one senior project engineer. No findings were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

Cornerstone: Emergency Preparedness

No findings were identified.

=

Licensee-Identified Violations===

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness (EP)1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensee's performance in the biennial exercise, conducted on April 21, 2010, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10)which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities and Emergency Plan Commitments". The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).
  • Other performance areas, such as: the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on April 23, 2010, to evaluate the licensee's self-assessment of its Emergency Response Organization (ERO) performance during the exercise and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.

The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, no change has been implemented to Revision 58 of the Radiological Emergency Response Plan. The inspectors conducted a sampling review of the implementing procedure changes made between September 30, 2009, and March 31, 2010, to evaluate for potential decreases in effectiveness of the Plan.

However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, "Emergency Action Level and Emergency Plan Changes." The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspectors reviewed various documents which are listed in the Attachment report.

This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspector sampled licensee submittals relative to the Performance Indicators (PIs) listed below for the period July 1, 2009 through Dec 31, 2009. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline", Revision 6, were used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)
  • Alert and Notification System Reliability (ANS)

For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.

The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three

(3) Emergency Preparedness PIs, i.e., DEP, ERO, and ANS, on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On April 23, 2010, the lead inspector presented the inspection results to Mr. Gatlin and other members of the V. C. Summer staff. The inspector confirmed that proprietary information was not provided during the inspection.

On July 14, 2010, the Chief, Plant Support Branch One (1), conducted a re-exit with Mr. Zarandi and other members of the V. C. Summer staff via teleconference.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

J. Archie, Senior Vice President, Nuclear Operations
R. Fowlkes, General Manager Engineering Services
T. Gatlin, Vice President Nuclear Operations
R. Haseldew, General Manager Organizational Effectiveness
G. Lippard, General Manager Nuclear Plant Operations
B. Thompson, Manager Nuclear Licensing
T. McCullough, Supervisor Emergency Services Unit
R. Williamson, Manager Emergency Services
S. Zarandi, General Manager Nuclear Support Services

ITEMS OPENED, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED

1EP1 Exercise Evaluation

Procedures

EPP-001.01 Unusual Event, Rev. 8
EPP-001.02 Alert, Rev. 8
EPP-001.03 Site Area Emergency, Rev. 8
EPP-001.04 General Emergency, Rev. 8
EPP-001 Activation and Implementation of Emergency Plan, Rev. 30
EPP-002 Communication and Notification, Rev. 35
EPP-005 Offsite dose Calculation, Rev. 20
EPP-013 Fire Emergency, Rev. 14
EPP-021 Activation of the Early Warning Siren System (EWSS), Rev. 22
EPP-023 Technical Support Center, Rev. 17
EPP-028 Operations Support Center, Rev. 1
EPP-051 Emergency Operations Facility, Rev. 8
EPP-104 Verification of Communications Operability, Rev. 9
EPP-105 Conduct of Drills and Exercises, Rev. 8
EPP-107 Conduct of Fire Brigade Drills, Rev. 0
EPP-108.00 Emergency Action Level Technical Basis Document, Rev. 0
EPP-110.00 Emergency Action Level Reference Manual, Rev. 0
SAP-999, Corrective Action Program, Rev. 4
SAP-0127, Emergency Preparedness, Rev. 1 Change letter B
Attachment Records and Data Control Room, Technical Support Center, Operations Support Center, Joint Information Center - Documentation packages (logs, event notification forms, Protective Action Recommendations, Media releases, and Radiological Dose Assessment
Corrective Action Program
CR-10-01696, Notifications faxed from WebEOC to the Counties not received
CR-10-01698, Control Room simulator incorrectly declared a Site Area Emergency
CR-10-01699, Initial notification of the Site Area Emergency inaccurate
CR-10-01700, Follow-up notification of the Site Area Emergency inaccurate
CR-10-01701, Follow-up notification of the Site Area Emergency inaccurate
CR-10-01702, Follow-up notification of the General Emergency inaccurate
CR-10-01703, Training related items from the NRC Evaluated Exercise on 04/21/2010
CR-10-01704, Procedure related items from the NRC Evaluated Exercise on 04/21/2010
CR-10-01705, Facilities related items from the NRC Evaluated Exercise on 04/21/2010
CR-10-01706, Control Room simulator Emergency Response Data System program failed
CR-10-01710, Failed to activate EOF within 60 minutes of Site Are Emergency declaration
CR-10-01712, NRC identified an "Apparent Violation" of 50.9
CR-10-01719, Simulator Control Room operating Emergency Operating Procedure decision
CR-10-01778, NRC pre-exit meeting with Emergency Planning and Licensing comments
CR-10-01806, Drill Control and Scenario issues identified

Section 1EP4: Emergency Action Level and Emergency Plan Changes

EP-100, Radiation Emergency Plan, Rev. 58
Changes packages
EPP-105, Conduct Of Drills And Exercises, Rev.
8
EPP-106, Emergency Preparedness Performance Indicator Procedure, Rev. 1

Section 4OA1: Performance Indicator Verification

Procedures

EPP-105, Conduct of Drills and Exercises, Rev. 8
EPP-106, Emergency Preparedness Performance Indicator Procedure, Rev. 1
EPP-102, Emergency Plan Training, Rev. 5
EPP-021, Activation of the Early Warning Siren System (EWSS), Rev. 22
Records and Data
DEP opportunities documentation for 3rd and 4th Quarters 2009 Drill and exercise participation records of ERO personnel for 3rd and 4th Quarters 2009 Siren test data for 3rd and 4th Quarters 2009 Various ERO Personnel Qualification and Participation records

LIST OF ACRONYMS

ANS Alert and Notification System Reliability
DEP Emergency Response Organization Drill/Exercise Performance
DHS Department of Homeland Security
EOF Emergency Operations Facility
ERO Emergency Response Organization Readiness
FEMA Federal Emergency Management Agency
OSC Operations Support Center
PI Performance Indicator
RSPS Risk Significant Planning Standards
TSC Technical Support Center