U-603589, November 2002 Monthly Operating Report for Clinton Power Station

From kanterella
(Redirected from U-603589)
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Clinton Power Station
ML023540391
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/13/2002
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603589
Download: ML023540391 (5)


Text

Amerge n An Exelon/Bnitish Energy Company Clinton Power Station R R 3 Box 228 Clinton, IL 61727-9351 10CFR50.36 U-603589 December 13, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

November 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending November 30, 2002.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector- Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month November 2002 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 11/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 MONTH November 2002 1 1024 17 1025 2 1025 18 1025 3 973 19 1025 4 1024 20 1025 5 1024 21 1025 6 1024 22 1025 7 1025 23 1024 8 1025 24 1024 9 1025 25 1023 10 1025 26 1025 11 1025 27 1025 12 1025 28 1025 13 1025 29 1024 14 1025 30 1025 15 1025 16 1023

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 11/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 OPERATING STATUS

1. REPORTING PERIOD: November 2002 GROSS HOURS IN REPORT PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 1022 DESIGN ELECTRICAL RATING (MWe-Gross): 1062
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL 720 0 7181.6 87,992 8 6 REACTOR RESERVE SHUTDOWN HOURS 00 00 00
7. HOURS GENERATOR ON LINE 7200 7061.8 85,845 5
8. UNIT RESERVE SHUTDOWN HOURS 00 00 40
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,207,707 0 21,755,271 237,272,610 6
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 762,552 0 7,186,423 5 78,632,054
11. NET ELECTRICAL ENERGY GENERATED (MWH) 736,406 6,895,247 75,062,685
12. REACTOR SERVICE FACTOR 1000% 89 6% 668%

896%

13. REACTOR AVAILABILITY FACTOR 1000% 668%

881%

14. UNIT SERVICE FACTOR 1000% 652%

100 0% 881%

15. UNIT AVAILABILITY FACTOR 652%
16. UNIT CAPACITY FACTOR (Using MDC) 1100% 925% 61 3%
17. UNIT CAPACITY FACTOR (Using Design MWe) 100 6% 87.9% 561%
18. UNIT FORCED OUTAGE RATE 0 0% 16% 68%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 11/30/02 COMPLETED BY M. J. Sloan REPORT MONTH November 2002 METHOD OF TYPE SHUTTING DOWN FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE F: SCHEDULED (HOURS) REASON (1) REDUCING POWER ACTIONS/COMMENTS (2)

NONE (1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2) Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)