Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Plant,Unit 2 Rod Control Problems.Related Documentation Encl". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20203N627  + (Discusses Plant Readiness for Exceeding 5% Power.Region III Will Recommend Issuance of Full Power OL Pending Continued Favorable Insp Observations & Successful Completion of Util Maint/Mod Outage.Related Info Encl)
  • ML20214T255  + (Discusses Plant Readiness to Exceed 5% Power.Util Estimates All Activities Required Prior to Exceeding 5% Power Will Be Completed by Early Sept 1986)
  • ML20245G588  + (Discusses Plant Restart Action Plan.Nrc Scheduled Meeting to Receive Public Comments on Plan for 890823 in Oswego,Ny)
  • ML17056A201  + (Discusses Plant Restart Action Plan.Understands That City of Oswego Agreed to Maintain Restart Action Plan in Location Which Allows Easy Access to Plan by Public.Nrc Scheduled Meeting on 890823 to Receive Public Comments on Util Plan)
  • ML20245G615  + (Discusses Plant Restart Action Plan.Understands That Recipient Agreed to Maintain Restart Action Plan in Location Which Would Allow Easy Access to Plan by Public.Plan Encl. Meeting Scheduled on 890823 to Receive Comments.W/O Encl)
  • ML20207C700  + (Discusses Plant Safety Monitoring Sys.Sys Processes & Outputs Reg Guide 1.97,Rev 2 Variables to Internal Plasma Displays & External Indicators,Displays,Cabinets & Other Equipment.Sys Testing Described)
  • ML20149D338  + (Discusses Plant Secondary Stage Alert on 880128.Info Suggests That Either Inadequate or No Procedure Exists to Notify Persons Living within Stone Throw of Epicenter. Immediate Investigation Requested)
  • ML20210S869  + (Discusses Plant Seismology/Geology Review.Acceleration for Seismic Design (0.32g) Acceptable.Acrs Concerns Re Acceleration Unclear)
  • ML19256G363  + (Discusses Plant Shutdown Due to Steam Generator Tube Leak. Insp on 790831 & 1031 Indicated Extensive Degradation.No Offsite Radiation Releases.Nrc Will Send Steam Generator Experts to Review Insps)
  • ML20081G651  + (Discusses Plant Specific Thermal Stratification Analysis Results & Completion Date Extension Request for Completion of Action Item 1.d of NRC Bulletin 88-011)
  • ML20207J800  + (Discusses Plant Startup in Cycle 11.On 870106,plant Put on-line Following Refueling Outage That Began on 861006, Ending Cycle 10.Mods Performed During Cycle 10 Outage Listed)
  • ML20154C081  + (Discusses Plant Status Re Actions (Per Listed Insp Repts) Taken in Response to ASLB 840622 Partial Initial Decision. Completion of All Actions Verified W/Exception of Mods to Harassment Procedures Which Will Be Completed by 841222)
  • ML20207Q741  + (Discusses Plant Status Rept for Dec 1983.IDVP Completed & NRC Issued Suppls 18 & 19 to SER Addressing Independent Design Verification of Seismic & Nonseismic Areas of Interest)
  • ML20057E313  + (Discusses Plant Steam Electric Plant Emergency Plan,Rev 33, 34 & 35 & Concludes That Based on Review of Submittals, Changes Meet Planning Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50)
  • ML20091G140  + (Discusses Plant Sys Branch Evaluation of Staff Action Item 4, Assessment of Tornado Dampers & Their Periodic Testing Identified During Det Insp at Plant.Concludes That No Action Should Be Taken W/Respect to Hvac/Room Cooler Sys)
  • ML20133F528  + (Discusses Plant TS Interpretations That Define How Plant Personnel Implement Various Tss.Ref to Telecommunication W/Various NRC Personnel Not Accepted Practice)
  • ML20128B722  + (Discusses Plant Topical Rept RXE-91-002, Reactivity Anomaly Events Methodology. Methodology Acceptable for Use by Util as Documented in Encl Safety Evaluation)
  • ML20129D654  + (Discusses Plant Unit 2 Second l0 Yr Interval Inservice Insp Program Plan Request for Relief 94-05.Response Requested)
  • ML20147J251  + (Discusses Plant Unit 3 Re Licensing Basis for Dynamic LOCA Effects.Requests Info for Resolving Ifi 95-15-02)
  • ML20080P740  + (Discusses Plant Units 1 & 2 950127 Outfall 005 Total Zinc Concentration in Excess of Daily Max Limitation.Informs That Interim Corrective Action Implemented to Temporarily Suspend Use of Outfalls 005 & 003 Until Cause Further Investigated)
  • ML18037A608  + (Discusses Plant Units 1 & 3 Component & Piece Parts Qualification Program.Staff Will Not Provide SE of Program But Will Inspect BFN Program in Accordance W/Insp Procedure 38703)
  • ML19332G911  + (Discusses Plant Violation of Tech Specs 3.4.1.4.2 Re Opening of Valves 1208-U4-176 & 1208-U4-177 in Oct 1988)
  • ML20035E873  + (Discusses Plant full-power Licensing,Per 930316 Briefing. Encls Provide Addl Info Re 10CFR2.206 Petitions Re Plant & Technical Info Re Thermo-Lag.Chairman I Selin Concurs in EDO Recommendation to Issue full-power License for Plant)
  • ML20199F459  + (Discusses Plant,Unit 1 Petition of Union of Concerned Scientists,Per 10CFR2.206.Notice of Informal Public Hearing Encl)
  • ML20212J812  + (Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition)
  • ML20134C588  + (Discusses Plant,Unit 2 Rod Control Problems.Related Documentation Encl)
  • ML20199J094  + (Discusses Plant,Unit 3 Rev to TS Bases,Section 3/4.5.2.Encl TS Pages Should Be Inserted Into TS to Ensure That NRC Staff & NNECO Have Identical TS Bases Pages)
  • ML20216G508  + (Discusses Plant,Unit 3 Withdrawal of Remaining Changes Proposed in 18 to 24 Month Surveillance Extension Submittal)
  • ML18106B017  + (Discusses Plant,Units 1 & 2 Control Room Envelope Differential Pressure Testing Draft Request for Enforcement Discretion Pending Outcome of Surveillance Testing Scheduled to Be Performed on 990114.Copy of Draft Ltr Encl)
  • ML20198J606  + (Discusses Plant,Units 1 & 2 Licensed Operator Staffing Requirements)
  • ML20006E907  + (Discusses Plants Design Control Program.Util Adopted Concept of Design Change Implementation Package (Dcip).Dcip Will Contain or Ref Design Change Notice Prepared Per Approved Procedures)
  • ML17174B125  + (Discusses Plants Requiring Close Monitoring Due to Safety Signficance.Summary of 920114-15 Discussion Encl)
  • ML20046D468  + (Discusses Plants post-accident Sampling Sys Containment Isolation Valves.Staff Currently Considering Potential Generic Backfit Re Isolation Requirements for PASS H2/O2 Monitoring Sys)
  • ML20216F512  + (Discusses Pnl Performance)
  • ML20002C174  + (Discusses Pnwl 801125 Application for License to Import 607 G Low Enriched U from United Kingdom,West Germany & Belgium Re High Burnup Investigations of LWR Sintered U Dioxide Pellet Fuel.Import Not Inimical to Defense)
  • NUREG-1101, Discusses Poilcy & Guidance Directive Fc 86-10, Onsite Burial by Matl Licensees. NUREG-1101,Vol 1, Onsite Disposal Od Radwaste, Provides Guidance for Noncommercial Disposal & Encl  + (Discusses Poilcy & Guidance Directive Fc 86-10, Onsite Burial by Matl Licensees. NUREG-1101,Vol 1, Onsite Disposal Od Radwaste, Provides Guidance for Noncommercial Disposal & Encl)
  • ML20210K522  + (Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity)
  • ML19225C539  + (Discusses Points Made During 790511 Telcon Re Replacement of Position Indication Limit Switches on MSIV at First Unscheduled Shutdown of Reactor After Receipt of environmentally-qualified Equipment)
  • ML20138C759  + (Discusses Points Made in Draft Rept on Task 3 of High Level Waste Safeguards Program.Recalculated Values from Points 2 & 3 Incorporated Into Pages 27 & 28 of Draft Encl)
  • ML20198E298  + (Discusses Points of View & Concerns Expressed in Ucs Press Release & Re B&W Reactors,Including Plan Responsiveness,Auxiliary Feedwater Sys & Integrated Control Sys.Achievement of Goals Will Reduce Ucs Concerns)
  • W3P83-1791, Discusses Poison Assemblies Installed Backwards in Spent Fuel Storage Racks.No Criticality Concern Due to Incorrect Installation,However,Fuel Damage Due to Asymmetric Design of Tophat on Poison Assembly Possible  + (Discusses Poison Assemblies Installed Backwards in Spent Fuel Storage Racks.No Criticality Concern Due to Incorrect Installation,However,Fuel Damage Due to Asymmetric Design of Tophat on Poison Assembly Possible)
  • ML20044G936  + (Discusses Policy & Guidance Directive 84-20, Impact of Rev of 10CFR51 on Matl Licensing Actions. Licensing Actions for Listed Activities Not Covered by Categorical Exclusions)
  • ML20137Z347  + (Discusses Policy & Guidance Directive 84-25 Which Reviews Licensing Policy for Large Irradiators & Stresses Importance of Careful Review of All Irradiator Applications)
  • ML20044B557  + (Discusses Policy & Guidance Directive 92-03, Exemptions from 10CFR35.400 for Uses Not Currently Authorized for Ir-192 Seeds Encased in Nylon Ribbon & Pd-103 Seeds as Brachytherapy Sources)
  • ML20044H020  + (Discusses Policy & Guidance Directive Fc 86-1,Rev 1, Radioactive Drug Research Committees. Directive Provided Guidance Re Reviews of Requests from Specific Licensees Wanting to Administer Radioactive Matl to Humans)
  • ML20236S125  + (Discusses Policy & Guidance Directive Fc 83-19 Re Jurisdiction at Reactor Facilities)
  • ML20044H037  + (Discusses Policy & Guidance Directive Fc 90-3, Licensing of Low-Level Radwaste Storage by Matls & Fuel Cycle Licensees. Directive Provides Guidance for Review of Amend Requests for Extended Interim Storage of low-level Radwaste)
  • ML20134D220  + (Discusses Policy & Guidance Directive Fc 85-1;Licensing Lixiscope & Bone Mineral Analyzer. Revised Directive Provides Comprehensive Guidance Re User & Instructor Qualifications & Human Use at Temporary Job Sites)
  • IA-85-471, Discusses Policy & Guidance Directive Fc 85-1;Licensing Lixiscope & Bone Mineral Analyzer. Revised Directive Provides Comprehensive Guidance Re User & Instructor Qualifications & Human Use at Temporary Job Sites  + (Discusses Policy & Guidance Directive Fc 85-1;Licensing Lixiscope & Bone Mineral Analyzer. Revised Directive Provides Comprehensive Guidance Re User & Instructor Qualifications & Human Use at Temporary Job Sites)
  • ML20094M591  + (Discusses Policy & Procedure Changes Re Communications W/ Licensee.Related Info Encl)
  • ML19327B352  + (Discusses Policy Guidance on Legality & Appropriateness of Using Financial Test & Corporate Guarantee for U Milling Licensees)