Text
..
- M oq
- y t
U:JITED STATES
,f j
NUCLEAR RE' VLATORY COMMISSION 3p.2/jf l
\\*****l2 WASHINGTON. D.C. 30006-0001 January 14, 1999 Mr. Randall K. Edington Vice President - Operations Entergy Operations, Inc.
River Bend Station P. O. Box 220 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - PETITION OF THE UNION OF CONCERNED SCIENTISTS (UCS) PURSUANT TO 10 CFR 2.206; NOTICE OF INFORMAL PUBLIC HEARING (TAC NO. MA3669)
Dear Mr. Edington:
By letter dated September 25,1998, David A. Lochbaum, acting on behalf of the Union of Concerned Scientists (UCS), submitted a Petition pursuant to 10 CFR 2.206 requesting that the River Bend Station (RBS) be immediately shut down and its operating license suspended or modified until the facility's design and licensing bases are updated to permit operation with failed fuel assembies or until all failed fuel assemblies are removed from the reactor core. In addition, the Petition requested an informal public hearing in the Washington, D.C. area to present new plant-specific information regarding the operation of RBS, as well as to discuss an April 2,1998, UCS report entitled " Potential Nuclear Safety Hazard / Reactor Operation With Failed Fuel Cladding." In a letter dated October 29,1998, the Nuclear Regulatory Commission (NRC) offered the Petitioner the opportunity to present the information on reactor operation with failed fuel assemblies at an informal public hearing. On November 6,1998, the Petitioner accepted the NRC's offer to conduct a hearing. Since that time, the NRC has consolidated the RBS Petition with a similar Petition filed for the Perry Nuclear Power Plant (PNPP), and decided that a joint informal public hearing will be held in the Washington, D.C. area to obtain relevant information regarding the issues raised by the Petitioner in the RBS and PNPP Petitions.
The purpose of this letter is to notify you that a date, time and location have been determined for the informal public hearing. The schedule was based upon input from EOi, UCS and FirstEnergy Nuclear Operating Co., the Perry licensee. The informal public hearing is scheduled as follows:
\\
Date:
February 22,1999
\\
0 Time:
1:00 p.m. to 4:45 p.m.
A y
Location:
U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, Maryland Room:
T-283 (TWFN) jACO30 9901210319 9901148'"
J
^"
Son u;
4
, __ ~,
Randall K. Edington,
A copy of the notice for the informal public hearing to be published in the Federa/ Registeris provided. If you have any questions regarding the 10 CFR 2.206 process and the informal j
public hearing, please contact Mr. Robert J. Fretz, the Petition Manager at (301) 415-1324.
Sincerely, ORIGINAL SIGNED BY:
Robert J. Fretz, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation 1
Enclosure:
FederalRegister Notice Docket No. 50-458 cc w/ encl: See next page DISTRIBUTION:
(Docket File!
PUBLIC PD4-1 r/f C.Hawes R. Fretz T. Gwynn, RIV ACRS OGC (15B18)
E. Adensam (EGA1)
J.Hannon
~ Document Name: G:\\RBFINAL\\BWN2206R.W(PD)
PD/ h4-1 OFC PM/PD4x1 LA/PD4-1 RFretzh CHawh JHannon NAME
}/ l /98
/ h /98 DATE
//6 / 84 5 COPY
( ES)NO YES/NO YES/NO OFFICIAL RECORD COPY
\\
Randal! K. Edington A copy of the notice for the informal public hearing to be published in the Federa/ Registeris provided. if you have any questions regarding the 10 CFR 2.206 process and the informal public hearing, please contact Mr. Robert J. Fretz, the Petition Manager at (301) 415-1324.
Sincerely, 9
e obert J. Fretz, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
Enclosure:
FederalRegisterNotice Docket No. 50-458 cc w/ encl: See next page i
l i
e i
l i
Mr. R ndall K. Edington Entergy Operations, Inc.
River Bend Station cc:
Winston & Strawn Executive Vice President and 1400 L Street, N.W.
Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Manager-Ucensing Jackson, MS 39286 Entergy Operation.s, Inc.
River Bend Station General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.
St. Francisville, LA 70775 River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.
President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President - Operations Support Regional Administrator, Region IV Entergy Operations, Inc.
U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attorney General Ms. H. Anne Plettinger State of Louisiana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carter, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135 David A. Lochbaum Union of Concerned Scientist 1616 P Street NW, Suite 310 Washington, DC 20036-1495
.