Text
.
" " " "
- vsaswiru, v w. viva,e P.02
~
g UNITED STATES f
NUCLEAR REGULATORY COMMIS$10N
{
ADVISORY COMMITTEE ON REACTOR BAFEQUARDS WASHINeTON. D. C. 20Saa i
December 8, 1983 1
I l
MEMORANDUM FOR: AC S bers FROM:
ohn. Mc ief Project Review Branch #1
SUBJECT:
O!ABLO CANYON STATUS REPORT, DECEMBER 1983 Units I and 2 at Diablo Canyon are Westinghouse four loop PWRs rated at 3338 MW(t) and 3411 W (t) respectively. The slight difference in rating is due to a minor upgrading of Unit 2.
The units have had more than a fair share of design problems. The discovery of the Hosgri fault and its attendant seismic redesign requirements, including application of the " tau-effect", are well known. Upon completion of the seismic redesign and modifications, an operating license was issued on September 22, 1981 which authorized fuel loading and operation up to 55 of rated power.
On September 28, 1981 Pacific Gas and Electric Company (PG8E) notified 3
the NRC that errors had been discovered in transferring information between design organizations. There appeared to be serious weaknesses in the implementation of the PG8E design quality assurance (QA) program.
As a result of these findings, the NRC suspended the operating license 1
and instituted an independent design verification program (IDVP).
The 10VP has been completed and final reports have been submitted to the NRC. The NRC Staff has issued Supplements Nos.18 and 19 to the Safety Evaluation Report. These supplements address the independent design verification of both the seismic and nonseismic areas of interest. An Atomic Safety Licensing Appeal Board has completed its hearings on design l
QA and is preparing a decision.
The Commissioners approved (4 in favor, one abstain) fuel loading and pre-critical testing. Fuel has been loaded into Unit 1 and precritical testing is in progress.
It is expected that Unit I will be ready for criticallity i
and low power (5%) testing by early January 1984 and to begin its ascent to full power by mid February 1984.
Thus far the major licensing efforts have been directed at Unit 1 but the review and modification of Unit 2 has been proceeding in parallel and Unit 2 should be ready to load fuel by late 1984.
l At this meeting the NRC (H. Schierling, NRR) will brief the Committee on the status of the Diablo Canyon project. No ACRS action is expected at this time.
l A Subcomittaa meeting in San Luis Obispo is scheduled for January 18-19, 1984 to review the safety significance of the changes made as a result of the IDVP.
Q[d$326 870220 j
1,^ t s m pga f
e.w,
-w--
-.,,--ww
-.~m.-------.
..w.--.e,-n,.---e
',e-m C/ACRS mSHICTON P.03 284TH ACRS MEETING OECEMBER 16, 1983 DIABLO CANYON 10:30 a.m.
Briefing by NRC Staff (H. Schierling NRR) regarding the status of Diablo Canyon Units 1 and 2 A.
Current licensing situation for Unit 1
- 1. Fuel is now loaded into Unit 1 and precritical testing is in progress.
- 2. All hearings are currently closed, a decision is due from the Board on Design QA.
- 3. The utility believes that Unit I will be ready to go critical and proceed with low power (5%) testing by early Jan.1984 and then to begin its ascent to full power in about mid-Feb.1984.
B.
Independent Design Verification Program
- 1. Trigger
- 2. Criteria for defining an " error"
- 3. Scope of program
- 4. Interim technical reports issued
- 5. Implementation of results C.
PG8E Design Review
- 1. Scope
~
- 2. Results
- 3. Actions D.
Other SER !ssues to be Resolved (Supplements issued and yet to be issued).
- 1. RHR System adequacy
- 2. Handling of heavy loads
- 3. Other items (breakwater damage)
E.
Allegations
- 1. Number and source of all.egations
- 2. Plan of actions to evaluate allegations
- 3. Results of investigations i
f F.
How does all of this affect Unit 27
- 1. Hearings
- 2. Corrective actions
- 3. Schedule G.
What is desired from the ACRS?
12:00 NOON e
-.-----.----.-g-
-.,-,,.,w_
,,a-,,_-.
,m e
w-__,
% lA b 'Ib, N' k
, /;png'o, UNITE] STATES ld8 E
- ,(
g NUCLEAR REGULATORY COMMISSION
- ;.g-j REGION V 1450 MARIA LANE. SUITE 210
,A
%
- b"
,e, WALNUT CREEK, CALIFORNIA 94596 DEC 0 81983 MEMORANDUM FOR:
D. G. Eisenhut, Director, Division of Licensing, NRR FROM:
T. W. Bishop, Director, Division of Reactor Safety and Projects
SUBJECT:
RECOMMENDATION FOR DIABLO CANYON BOARD NOTIFICATION On December 6, 1983, Region V became aware of the pending arrest of 21 persons on charges of illegal drug activities at Diablo Canyon. The Preliminary Notification (PNS-V-83/13) concerning this matter is attached.
The charges involve PG&E, Pinkerton, Foley, and Pullman employees.
Apparently, no operations or armed guard force personnel are involved.
The Region V staff recommends that this information be brought to the attention of the Diablo Canyon licensing and appeals board, N f e
u
[fT W. Bishop, irecMr
/
Division of actor Safety and Projects
Enclosure:
PNS-V-83/13 cc:
J. B. Martin, RV D. F. Kirsch, RV P. J. Morrill, RV L. Chandler, ELD T. Novak, ALD, NRR B. Buckley, LPM, NRR H. Schierling, NRR h
m
-w c y r n y}
,n P
"*~
ERELIMINARY NOTIFICATION OF SAFEGUARDS EVENT--PNS-V-83/13 j'
Date: 12/06/03 This, preliminary no'tificaticn constitutes EARLY n2tice of events of POSSIBLE national
.ucurity or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.
Pacific Gas and Electric Company Licensee Emergency Classificatio)
Diablo Canyon, Unit 1 Notification of Unusual Eve Docket No. 50-275 77 Beale Street Alert San Francisco, California 94106 Site Area Emergency
SUBJECT:
MULTIPLE ARRESTS FOR SALE OF DRUGS General Emergency Not Applicable y
I On Deceder 6,1983 at 8:20 a.m., PST, the Diablo Canyon Plant Manager notifie'd the senior on-site resident inspector of the pending arrests of 21 persons for the sale of drugs.
In April 1983, PG&E Corporate Security contacted the San Luis Obispo County Narcotic Task Force and requested investigation into allegations of illegal drug activity at Diablo Canyon. A 4-month undercover investigation resulted in the undercover purchase of cocaine, methamphetamine, hashish and marijuana from Diablo Canyon employees on and off the plant site. Twenty-one complaints have been issued by the San Luis Obispo County District Attorney's Office (primarily for the sale of Cocaine) which includes:
1 PG&E maintenance employee, 3 General Construction Security Watchpersons,13 contract egloyees of Foley Construction Cogany and 4 contract employees of Pullman Power Products Company.
The licensee conducted a -joint press conference with the San Luis Obispo County Narcotic Task Force at 10:30 a.m., PST with a companion conference at PG&E Corporate Headquarters in San Francisco planned for 2:00 p.m., PST, Deceder 6,1983. The NRC will respond
, ff..
to media inquiries.
The IAT was notified at 10:50 a.m., PST and the State of California was notified at 11 :00 a.m., PST, Deceder 6,1983.
This Preliminary Notification is issued for information only.
This information is current as of 11:30 a.m., PST, Deceder 6,1983.
CONTACT:
D. W. Schaefer - FTS 463-3785 or L. R. Norderhaug - FTS 463-3775 1
DISTRIBUTION:
I H S t. // 4l.,...
MNDB y./ i,. Phillips/Lf7. E/W/,'. /yWillstej_.; Air Rights //
,) Mail:
'- NMSS ADM:DM]
Com. Gilinsky PA OIA RES 00T: Te Com. Bernthal MPA AEOD 07 Com. Roberts ELD Regions:f E W /E', /t*
Com. Asselstine SECY INP0/n kNSAC ' /> t v,.
ACRS Licenseef,u c c CA (ReactorLicensees)
REGION V: FORM.
PDR Resident Inspectorgg :v,.
(3/17/83)
WNffD L P,
.,