Discusses Plant Sys Branch Evaluation of Staff Action Item 4, Assessment of Tornado Dampers & Their Periodic Testing Identified During Det Insp at Plant.Concludes That No Action Should Be Taken W/Respect to Hvac/Room Cooler Sys
ML20091G140
Person / Time
Site: South Texas  
Issue date: 12/01/1994
From: Mccracken C
Office of Nuclear Reactor Regulation
To: Beckner W
Office of Nuclear Reactor Regulation
Shared Package
ML20091F755 List:
References
FOIA-95-219 NUDOCS 9412080021
Download: ML20091G140 (2)


Text

ff!

d,k,'.I Y.3k@

'fIfM7{ " ' %' S%

Ilr p.g g,',..

rurog

. ~ ; % 93 k

UNITED STATES

$n j

.j NUCLEA'R REGULATORY COMMISSION i

e<,

f W ASHINoToN. D.C. 20s5S4001 o%

p 9,,,,,<

December 1.'1994 E..

HEMORANDUM T0:

William D. Beckner, Director t

Project Directorate IV-I Division of Reactor Projects III/IV Conrad E. McCracken, Chief r b 49', L -M/*

/

I FROM:

/ c Plant Systems Branen (6

/

Division of Systems Safety and Analysis

SUBJECT:

INPUT TO JANUARY 1995 REPORT - ACTION ITEM 4 " TORNADO DAMPERS" FROM DIAGNOSTIC EVALUATION AT SOUTH TEXAS (DRPW WITS ITEM 9300133)

The Plant Systems Branch (SPLB) has completed its evaluation of staff Action item No. 4 " Assessment of Tornado Dampers and Their Periodic Testing" which was identified drring the Diagnostic Evaluation Team (DET) inspection at the South Texas Project. The Probabilistic Safety Assessment Branch (SPSB) was asked to assist SPLB by performing a first level assessment of the risk impact

.of HVAC system dampers and fans. The object of this assessment was to I

determine the significance, if any, of the risk associated with HVAC system components in general.

If any risk significance was found, further study would be necessary to address the tornado damper issue. The results of the SPSB assessment showec that a generic concern regarding damper testing is not justified (See attached September 21, 1994 memorandum from EJButcher to CEMcCracken).

This conclusion is based on the low risk impact (small percentage of the overall core damage frequency) of HVAC system dampers and fans in terms of the core damage frequency reduction importance measure. This conclusion is also supported by NUREG-1427 " Regulatory Analysis for the Resolution of Generic Issue 143: Availability of Chilled Water Systems and Room Cooling," which concluded that no action should be taken with respect to HVAC/ room cooler systems based on the small contribution to core damage frequency.

Although the risk assessments have showed that a backfit to address requirements for testing tornado dampers or other dampers could not be justified, SPLB will issue an information notice (before the end of the first quart'er of the calendar year 1995) identifying the damper operational problems which occurred at South Texas that were generally attributable to an inadequate testing program.

T' information notice would also de:;cribe an inadequate design condition at River Bend where certain (exhaust system) tornado dampers would not reopen (resulting in diesel generators becoming inoperable with no operator action) after a tornado event while the exhaust fans were running. The information notice would alert other licensees that may have overlooked tornado dampers in their ventilation testing / maintenance programs and/or overiraked the importance of their post-tornado role because CONIACT:

W. LeFave 504-3285 0702g,9 Er

_0W 9412090021 941201 7

CF ADOCK 05000498-

}

l

- C F

l

?,\\1 S T.ik &.. W V F*

i

.y,

. s _; ;v I

8

^

r.

~l$;h$

the dampers may not have been c6nsidere kjh,W'an.actu'l part of th'e" E

as' a

i, system. However, these dampers are.' required.tolbe operational prior to a f

tornado and usually required to be"open post-toinador.in order. for;the plant to f

be within its design basis.. The' inoperability of.one of.these dampers will y

usually place a plant in a potentially unanalyzed condition'(in the event of a 2

tornado strike).

h

~

At South Texas, the licensee adequately addressed the maintenance issue by revising the preventive maintenance (PH) program to periodically check the tornado dampers every two years or at each refueling outage depending on the specific damper function. This two year / refueling outage surveillance includes inspecting, cleaning, lubricating, and stroking the damper while taking dynamometer measurements of the spring forces. The original (at the time of the event) surveillance plan was to inspect and lubricate the tornado dampers every 10 years.

Based on the proposed issuance of an information notice and the actions taken at South Texas, we consider follow-up Action Item No. 4 to be closed. No further staff acticns are planned after the issuance of the information notice.

Docket No. 50-498 and 50-499 DISTRIBUTION Docket file Plant file SWest GHubbard j

JLyons i

MVirgilio CHolden i

MWohl TAlexion LKokajko RWessman ADummer l

[G:\\S

\\LEFAVE\\TO ADO)

SPL :DSSA SPLY:USSA SP B:DSSA WLeFave JHubbard CHcCracken i

11/JO/94 11ff 9 94 12/ //94

/

j OFFICIAL RECORD COPY l