Discusses Points Made During 790511 Telcon Re Replacement of Position Indication Limit Switches on MSIV at First Unscheduled Shutdown of Reactor After Receipt of environmentally-qualified Equipment
ML19225C539
Person / Time
Site: Pilgrim
Issue date: 06/18/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Andognini G
BOSTON EDISON CO.
References
NUDOCS 7907310470
Download: ML19225C539 (2)


Text

.

hb

+f h

UNITED STATES

!}

yi NUCLEAR REGULATORY COMMISSION

/g/. E

.g*f !i
ly,l WASHINGTON, D. C. 20555 s

o, JUNE 18 B79 Docket No. 50-293 M r. G. Carl Andognini Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Andognini:

Your letter 79-72 dated April 9,1979 reghrding valve position indication to control room operators prompted our. conference call on Friday, May ll,1979 to discuss the need for providing environmentally qualified position indica-tion for containment isolation valves.

Your letter stated that you would replace the stem mounted limit switches on the main steam isolation valves during the next refueling outage, currently scheduled' for the first quarter of 1980.

As a result of our conversation, we understand that you will replace the position indication limit switches on the main steam isolation valves at the first unscheduled shutdown of the reactor following receipt at the plant site of environmentally qualified equipment.

Should nt unscheduled shutdown occur, your original commitment will apply.

Further, we understand that you will replace with environmentally qualified equipment those limit switches which provide containment isolation valve position indication to the control room operator the remaining power operated containment isolation valves exposed to an idverse post-accident e nvi ronment.

We also understand this action will be completed prior to startup following your next scheduled refueling outage.

We find this schedule acceptable based on the availability of redundant motor operated containment isolation valves located outside the containment which would be accessible to the operators in a post-accident condition.

We appreciate your cooperation with us.

Please contact us if this understanding is incorrect.

(

Sincer y,

/ 6 /

A us 2ss hhoasA.Ipolito, Chief Operating Reactors Brcnch #3 Division of Operating Readors cc:

See page 2 7907310470

2-Mr. G. Carl Andognini CC Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD #1, Rocky Hill Roao Plymouth, Massachusetts 02360 Anthony Z. P,oisman Natural Resources Defense Council 917 15th Street, N. W.

Washington, D. C.

20005 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massach"se',ts 02111 Plymouth Pub. '

!Drary North Street Plymouth, Massacnasetts 02360

$4 408 239

-