- ML18096A430 + (07:36:19, 6 January 2025)
- ML18096A429 + (07:36:20, 6 January 2025)
- ML18096A428 + (07:36:21, 6 January 2025)
- ML18096A425 + (07:36:22, 6 January 2025)
- ML18096A426 + (07:36:22, 6 January 2025)
- ML18096A423 + (07:36:23, 6 January 2025)
- IR 05000272/1991027 + (07:36:25, 6 January 2025)
- ML18096A420 + (07:36:26, 6 January 2025)
- ML18096A419 + (07:36:27, 6 January 2025)
- 05000311/LER-1991-019-02, :on 911207,containment Radioactive Noble Gas Monitor Channel Alarmed,Resulting in ESF Actuation Signal. Caused by Inadequate Administrative Controls.Procedure Re SG Work During Refueling Activities Revised + (07:36:28, 6 January 2025)
- ML18096A415 + (07:36:29, 6 January 2025)
- ML18096A414 + (07:36:30, 6 January 2025)
- 05000272/LER-1991-034, :on 911126 & 1226,containment Particulate Radiation Monitor Channel Spiked High Resulting in Receipt of Containment Purge Isolation Signal.Caused by Degraded Cable Connection.Calibr Check Performed + (07:36:32, 6 January 2025)
- ML18096A411 + (07:36:34, 6 January 2025)
- 05000311/LER-1991-018-02, :on 911129,radiation Monitor 2R1A Spiked High & on 911205,monitor Spiked Low.Caused by Susceptibility of Monitor to Voltage Transients.Design Mods Implemented to Eliminate Spurious ESF Actuations + (07:36:35, 6 January 2025)
- ML18096A409 + (07:36:36, 6 January 2025)
- ML18096A408 + (07:36:37, 6 January 2025)
- ML18096A405 + (07:36:38, 6 January 2025)
- ML18096A407 + (07:36:38, 6 January 2025)
- ML18096A404 + (07:36:39, 6 January 2025)
- ML18096A400 + (07:36:40, 6 January 2025)
- ML18096A402 + (07:36:40, 6 January 2025)
- 05000272/LER-1991-032, :on 911114,containment purge/pressure-vacuum Relief Sys Isolation Signal Actuated.Caused by High Channel Spike on Containment Particulate Radiation Monitor 1R11A. Channel Calibr Check Performed Satisfactorily + (07:36:42, 6 January 2025)
- IR 05000272/1991011 + (07:36:45, 6 January 2025)
- ML18096A395 + (07:36:47, 6 January 2025)
- ML18096A396 + (07:36:47, 6 January 2025)
- ML18096A394 + (07:36:48, 6 January 2025)
- ML18096A393 + (07:36:48, 6 January 2025)
- ML18096A392 + (07:36:49, 6 January 2025)
- ML18096A391 + (07:36:50, 6 January 2025)
- ML18096A390 + (07:36:51, 6 January 2025)
- ML18096A388 + (07:36:52, 6 January 2025)
- 05000272/LER-1991-033, :on 911116,ESF Actuation & Unplanned Diesel Generator 1B Start Occurred.Caused by Improper Use of Test Equipment & Incorrect Labeling of Voltage Indications. Connections Reversed & Personnel Counseled + (07:36:53, 6 January 2025)
- ML18096A383 + (07:36:54, 6 January 2025)
- ML18096A381 + (07:36:55, 6 January 2025)
- ML18096A380 + (07:36:56, 6 January 2025)
- ML18096A379 + (07:36:56, 6 January 2025)
- ML18096A375 + (07:36:57, 6 January 2025)
- TAC:M81722 + (07:36:58, 6 January 2025)
- ML18096A374 + (07:36:59, 6 January 2025)
- 05000311/LER-1991-017-03, :on 911109,reactor/turbine Trip Occured on Low Auto Stop Oil Pressure Followed by Turbine/Generator Failure.Caused by Failure of 63-3 Auto Stop Oil Protection Pressure Switch.Matrix Review Performed + (07:37:00, 6 January 2025)
- IR 05000272/1991026 + (07:38:52, 6 January 2025)
- ML18096A370 + (07:38:54, 6 January 2025)
- ML18096A369 + (07:38:55, 6 January 2025)
- ML18096A368 + (07:38:55, 6 January 2025)
- ML18096A367 + (07:38:56, 6 January 2025)
- ML18096A364 + (07:38:57, 6 January 2025)
- ML18096A365 + (07:38:57, 6 January 2025)
- ML18096A361 + (07:38:58, 6 January 2025)
- ML18096A359 + (07:38:59, 6 January 2025)
- 05000311/LER-1991-016-02, :on 911025,two Hose Stations Inadvertently Deleted from Procedure Re Detailed Insp of TS-related Hose Stations.Caused by Inappropriate Procedural Rev.Procedure Writer & Reviewer Counseled + (07:39:01, 6 January 2025)
- 05000311/LER-1991-015-02, :on 911021,nuclear Instrumentation Sys Power Range Channels Indicated Less than 29.8% Rated Thermal Power & Declared Inoperable.Caused by Application of Current Methodology.Potentiometers Adjusted + (07:39:03, 6 January 2025)